--- title: Lanier County Code of Ordinances, 10-7. Special Administration and Enforcement Procedures for Water Resource collection: local-codes id: local-code:lanier-county/code/10-7 cite_as: Lanier County, Ga., Code of Ordinances ยง 10-7 canonical_url: https://georgiacommons.org/counties/lanier/code/10-7 md_url: https://georgiacommons.org/counties/lanier/code/10-7.md text_url: https://georgiacommons.org/counties/lanier/code/10-7/text source_url: https://library.municode.com/ga/lanier_county/codes/code_of_ordinances date: 2021-12-13 status: active jurisdiction: county:lanier jurisdiction_name: Lanier County county_fips: "13173" corpus_version: local-codes-lanier-county-c9f4538a2469 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/lanier/code/~appendix-b.md previous: https://georgiacommons.org/counties/lanier/code/404.md next: https://georgiacommons.org/counties/lanier/code/10-9.md index: https://georgiacommons.org/counties/lanier.md branch: code edition: As published by Municode, current through 2021-12-13 edition_date_kind: current_through source_publisher: Municode version_id: local-code:lanier-county/code/10-7@2021-12-13-f085ee2413 --- # Lanier County Code of Ordinances, 10-7. Special Administration and Enforcement Procedures for Water Resource > As published by Municode, current through 2021-12-13 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix B - LAND DEVELOPMENT Protection Districts. Any applications for building permits shall be accompanied by two (2) site plans drawn to scale showing the actual dimensions of the lot to be built upon, the size and location of the proposed buildings, and any proposed land disturbing activities as may be essential for determining whether the provisions of this ordinance are being observed. The above referenced information is required on the site plan before the site plan is considered by the Building Official and/or his designee and any local permits are approved. Any building permit shall become void if the work involved has not begun within six (6) months after the date of issuance of the permit or if the work or development authorized by such permit is suspended or abandoned for a period of six (6) months after the work or development is commenced; provided that extensions of time and periods not exceeding six (6) months each may be allowed in writing by the Building Official and/or his designee. 10-8 Activities to Comply with Site Plan. All development activities or site work conducted after approval of the site plan shall conform with the specifications of said site plan. The site plan may be amended only with the approval of the Building Official and/or his designee.