All work for which a permit is granted hereunder shall be constructed according to the specifications established by the county so that the drainage, access, compaction, materials, dimensions, slope, width, and other aspects shall not unreasonably interfere with traffic flow and drainage considerations. All ramp or access construction granted hereunder shall be at least 48 feet in width and under the direction and supervision of the road superintendent of each district, or his designee, who shall have the authority to order the applicant to immediately cease all logging when applicant does not construct and maintain access ramps to county standards. The logging operator will be responsible for all cost associated with ramp construction.