(a) Prior to the approval of any subdivision or manufactured housing park development by the governing authority, the applicant must offer documentation that the U.S. Army Corp of Engineers or their designated representative has made a wetland determination on the development proposal in the context of its physical location. (b) Applications for a subdivision or manufactured housing park that encompass wetlands or are within 200 feet of wetlands, regardless of an Army Corps of Engineers 404 permit determination, shall include a separate site plan drawn at a scale of one inch equals 100 feet with the following information: (1) A map of all planned excavation and fill, including calculations of the volume of cut and fill involved, and cross-sectional drawings showing existing and proposed grades. Elevations, horizontal scale, and vertical scale must be shown on cross-sectional drawings. (2) Location, dimensions and area of all impervious surfaces, both existing and proposed, on the site and adjacent to the site, for a distance of 100 feet. (3) The orientation and distance from the boundaries of the proposed site to the nearest bank of an affected perennial stream or water body. (4) Elevations of the site and adjacent lands within 100 feet at contour intervals no greater than two feet. (5) Location and detailed design of any spill and leak collection systems designed for the purpose of containing accidentally released hazardous or toxic materials. (6) All proposed temporary disruptions or diversions of local hydrology.