--- title: Long County Code of Ordinances, Sec. 122-120. Submittal; fees; referral collection: local-codes id: local-code:long-county/code/122-120 cite_as: Long County, Ga., Code of Ordinances § 122-120 canonical_url: https://georgiacommons.org/counties/long/code/122-120 md_url: https://georgiacommons.org/counties/long/code/122-120.md text_url: https://georgiacommons.org/counties/long/code/122-120/text source_url: https://library.municode.com/ga/long_county/codes/code_of_ordinances date: 2015-12-01 status: active jurisdiction: county:long jurisdiction_name: Long County county_fips: "13183" corpus_version: local-codes-long-county-e0b95b88b6df publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/long/code/~part-ii/~part-a/~chapter-122/~article-ii/~division-4.md previous: https://georgiacommons.org/counties/long/code/122-89-to-122-119.md next: https://georgiacommons.org/counties/long/code/122-121.md index: https://georgiacommons.org/counties/long.md branch: code edition: As published by Municode, current through 2015-12-01 edition_date_kind: current_through source_publisher: Municode version_id: local-code:long-county/code/122-120@2015-12-01-7d07c376ba --- # Long County Code of Ordinances, Sec. 122-120. Submittal; fees; referral > As published by Municode, current through 2015-12-01 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Part A - GENERAL ORDINANCES / Chapter 122 - SUPPLEMENTAL STANDARDS / Article II - MANUFACTURED HOUSING / Division 4 - MANUFACTURED HOME PARK DEVELOPMENT SITE PLAN APPROVAL (a) In order to construct, alter, or expand a manufactured home park, a developer must secure approval of a development plan from the governing authority. Such plans must be submitted at least 60 days prior to the time that construction is desired to begin. The developer is responsible for a plan review fee, payable to the governing authority, at the time of plan submission. This fee shall be established by resolution and may be amended from time to time by the governing authority. Any costs above these fees shall be incurred by the developer. (b) The manufactured home park development site plan shall contain the following: (1) Name and address of the applicant; (2) Name and address of proposed manufactured home park, location, and legal description of the property; and (3) Three complete copies of the plan prepared by an acceptable authority and a registered surveyor at a scale of one inch equals 100 feet, and showing the following: a. The total park area including the shape and dimensions of the site and the north arrow; b. All existing and/or proposed structures, facilities and stands; c. A topographic map showing existing and proposed grades at two-foot contour intervals. where property is too level to permit such a map, a drainage sketch shall be furnished along with a certificate from a state-certified civil engineer or state-certified land surveyor stating that the drainage will not adversely affect adjacent property owners; d. Location, size and number of existing and proposed manufactured home stands and automobile parking areas; e. Location, surface and width of all existing and proposed roads, entrances, exits and walkways; f. Location and size of all existing and proposed utilities (i.e., power lines, water lines, septic tank systems, etc.); g. Delineation of all areas of the proposed manufactured housing park which lie within established Federal Emergency Management Agency (FEMA) floodplains and/or jurisdictional wetlands; h. Where the proposed development is not to be served by a public sewerage system, information on soil types and capabilities, frequency and evaluation of seasonal high groundwater tables, and occurrence of rock and other impervious strata shall be provided by the developer. A high intensity soil survey will generally be required to provide this data. This information should be superimposed on a copy of the development plan showing contour lines and other natural features of the site; i. Location of all water supplies on or off the development which will bear upon the location of the on-site sewage management systems; j. Generalized plans for stormwater management, including the proposed location of drainageways, basins and other improvements; k. Plans for control of erosion and sedimentation; and l. A draft of the proposed restrictive lease agreements or covenants, if any, to be imposed, and designation of areas subject to special restrictions. (c) The governing authority shall have authority to refer the development plan to other governmental agencies for review and comment, but will give a decision to approve, disapprove, or approve with conditions within 60 days from the date of submission of the development plan. ## History (Ord. of 2-3-2015, § 10.4)