Skip to content
Georgia Commons
Menu

Long County · Code of Ordinances

Part II - CODE OF ORDINANCES / Part A - GENERAL ORDINANCES / Chapter 122 - SUPPLEMENTAL STANDARDS / Article VI - WIRELESS COMMUNICATIONS FACILITIES AND ANTENNAS / Division 2 - APPLICATION PROCEDURES

Sec. 122-336. General application requirements.

About this text

  • As published by Municode, current through 2015-12-01
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) Application for a permit for any telecommunications facility shall be made to the building official by the person, company, organization, or duly authorized agent thereof, that will own and operate the telecommunications facility. An application will not be considered until it is complete. The building official is authorized to develop application forms to assist in providing the required information and facilitate the application process. Except for a colocation information submittal under this subpart, the following information shall be submitted when applying for any permit required by this subpart and must be submitted for an application to be considered complete:

(1) Site plan or plans to scale specifying the location of telecommunications facility, transmission building and/or other accessory use, access, parking, fence, landscaped area, and adjacent land uses. Applicants shall submit both a paper location map and, if requested by the building official, a digitized location map in a format compatible with the GIS software utilized by the local government.

(2) Landscaped plan to scale indicating size, spacing and type of plantings required.

(3) A full description of the environment surrounding the proposed telecommunications facility, including any adjacent residential structures and districts, structures and sites of historic significance, streetscapes or scenic view corridors.

(4) A description of anticipated maintenance needs for the telecommunications facility, including frequency of service, personnel needs, equipment needs, and traffic, noise or safety impacts of such maintenance.

(5) A report from a professional qualified engineer licensed in the state, or other appropriate qualified industry expert, documenting the following:

a. Tower or antenna type, height, and design;

b. Engineering, economic, and other pertinent factors governing selection of the proposed design;

c. Total anticipated capacity of the telecommunications facility, including numbers and types of antennas which can be accommodated;

d. Evidence of structural integrity of the tower or alternative tower structure;

e. Structural failure characteristics of the telecommunications facility and demonstration that site and setbacks are of adequate size to contain debris; and

f. Certification that the antenna and related equipment or appurtenances comply with all current regulations of the FCC.

(6) Identification of the geographic service area for the subject installation, including a map showing the site and the nearest or associated telecommunications facility sites within the network. Describe the distance between the telecommunications facility sites. Describe how this service area fits into and is necessary for the service network (i.e., whether such antenna or tower is needed for coverage or capacity).

(b) If the proposed site is not zoned AF, C-2, I-1 or I-1, applicants must describe why a site zoned AF, C-2, I-1 or I-2 was not proposed by identifying:

(1) What good faith efforts and measures were taken to secure such an alternate site;

(2) Why such an alternate site was not technologically, legally or economically feasible and why such efforts were unsuccessful; and

(3) How and why the proposed site is essential to meet service demands for the geographic service area.

(c) The building official will review with special care justifications that appeal only to undue expense and/or to undue difficulties in entering into a lease or similar agreement. The building official shall carefully weigh such claims, and the evidence presented in favor of them, against a project's negative impacts at the proposed site.

(d) The applicant must provide a utilities inventory showing the locations of all water, sewage, drainage and power line easements impacting the proposed tower site.

(e) The applicant must provide any other information which may be requested by the building official to fully evaluate and review the application and the potential impact of a proposed telecommunications facility.

History

The history line the source prints at the end of the section.

(Ord. of 2-3-2015, § 13.4.1)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:long-county/code/122-336@2015-12-01-c2e03f9b5d

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Long County Code of Ordinances, Sec. 122-336. General application requirements | Georgia Commons