Skip to content
Georgia Commons
Menu

Lumpkin County · Code of Ordinances

Lumpkin County Code of Ordinances

This document is shown whole, as one text: its source does not cut it into sections.

About this text

  • As published by Municode, current through 2026-06-16
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
  • Read by OCR from a scanned page: a character, a name, or a number may be misread.

Part 8 of 9. This text is long, so its page prints it in parts, in the source's order. A link to one of its paragraphs leads to the part that holds it.

Scrap tire generator means any person who generates scrap tires. Generators may include, but are not limited to, retail tire dealers, retreaders, scrap tire processors, automobile dealers, private company vehicle maintenance shops, garages, service stations, and city, county, and state governments.

Scrap tire processor means any person who is approved by the environmental protection division to receive scrap tires from scrap tire generators or scrap tire carriers for the purpose of scrap tire processing.

Scrap tire sorter means any person, other than the original scrap tire generator, who handles mixed tires by separating used tires and retreadable casings from scrap tires.

Solid waste means any garbage or refuse; sludge from a wastewater treatment plant, water supply treatment plant, or air pollution control facility; and other discarded material including solid, liquid, semisolid, or contained gaseous material resulting from industrial, commercial, mining, and agricultural operations and from community activities, but does not include recovered materials; solid or dissolved materials in domestic sewage; solid or dissolved materials in irrigation return flows or industrial discharges that are point sources; or source, special nuclear, or byproduct material.

Solid waste handling means the storage, collection, transportation, treatment, utilization, processing, or disposal of solid waste, or any combination of such activities.

Waste means all discarded substances and materials whatsoever exceeding ten pounds in weight or 15 cubic feet in volume, or any such substance in any weight or volume if biomedical waste, hazardous waste, a hazardous substance, or any such substance or material dumped for commercial purposes. With the exception of nonhazardous, low-impact animal byproducts classified by the state department of natural resources; "waste" includes, without limitation, sand, gravel, slag, brickbats, rubbish, waste material, tin cans, refuse, garbage, trash, debris, dead animals, bottles, boxes, containers, papers, tobacco products, tires, appliances, mechanical equipment or parts, building or construction materials, tools, machinery, wood, motor vehicles and motor vehicle parts, vessels, aircraft equipment, waste oil, batteries, antifreeze, sludge from a wastewater treatment facility, water supply treatment plant, or air pollution control facility, air contaminants from any source or facility, and any other discarded material or substance of every kind and description resulting from domestic, industrial, commercial, mining, or governmental operations.

Yard trimmings means leaves, brush, grass clippings, shrub and tree prunings, discarded Christmas trees, nursery and greenhouse vegetative residuals, and vegetative matter resulting from landscaping development and maintenance other than mining, agricultural, and silvicultural operations.

(Res. No. 2003-13, § I, 5-15-2003) Sec. 48-3. Violations and penal fines.

Any person, firm, or corporation violating any portion of this chapter shall be guilty of a misdemeanor and, upon conviction thereof, in the magistrate court of the county, shall be punished as follows:

(1) For the first offense: By a fine of not less than $200.00 and not more than $1,200.00, or up to 30 days imprisonment, or both. Each day the violation continues shall constitute a separate offense. However, this section shall not preclude the county from choosing to seek civil redress in a court of competent jurisdiction in addition to the criminal prosecution, it being the intent of the county to have both the civil and criminal rights of prosecution in this area;

(2) For the second or more offense: The violator shall be guilty of a misdemeanor of high and aggravated nature punishable by a fine of not less than $750.00 and not more than $1,200.00, or up to 60 days imprisonment, or both. Each day the violation continues shall constitute a separate offense; and/or

(3) In the sound discretion of the judge of the court with jurisdiction, the person may also be directed to pick up and remove from any public road or highway and/or other public right of way for a distance not to exceed one mile, any litter the person has deposited and any and all litter deposited thereon by anyone else prior to the date of execution of sentence; and/or

(4) In the sound discretion of the judge of the court with jurisdiction, the person may be directed to pick up and remove from any public health, public park, private right-of-way, or with the prior permission of the legal owner or tenant in lawful possession of such property, any private property upon which it can be established by competent evidence that the person has deposited litter, any and all litter deposited thereon by anyone prior to the date of execution of sentence;

and/or

(5) The court may order the publication of the names and photographs of persons convicted of violating this chapter; and/or

(6) The court may order the person to repair or restore property damaged, or pay damages resulting from such violations, or perform public service related to the repair or restoration of property damaged by the violation; and/or

(7) In case of an open dump or improper solid waste, litter or waste disposal site, the property owner, contractor, developer, builder or other person responsible for the property shall cause the property to be cleaned and to come into full compliance with this chapter. The county shall not be responsible for any costs of cleanup or remediation; and/or

(8) The expenses incurred by the county for cleanup, enforcement of violations and penalties shall be chargeable to the violator, including, but not limited to: court costs, filing fees, special investigations, mutual aid assistance from other agencies and other costs necessary for the reasonable enforcement of this chapter.

(9) In addition to actions filed by the county for violations of this chapter, any state or federal agency may independently file separate or concurrent charges within their respective applicable authority and seek conviction within a court of competent jurisdiction.

(Res. No. 2003-13, § VIII, 5-15-2003) Sec. 48-4. Enforcement.

(a) Enforcement of this chapter shall be the responsibility of the county commission, the environmental education and enforcement officer or his/her designee, and/or the county sheriff's office.

(b) Any person authorized to enforce this chapter shall be empowered to enter any property, upon reasonable cause, at reasonable or necessary times in order to property inspect for violations of this chapter, subject to the condition that to allow entry onto private property for inspection, the alleged violation of this chapter must be visible from a public road or right-of-way, or upon said person having received a valid complaint alleging a violation of this chapter, or by a judge's order upon said person having received information/allegations that constitute reasonable suspicion that a serious unlawful act or threat to the health and safety of the community and/or the environment has occurred or is about to occur.

(c) Appeals for the violation of this chapter may be made to the magistrate court of the county, or higher court if the person so chooses. The person always has the right to consult his/her attorney at any time before the hearing is scheduled for court.

(Res. No. 2003-13, § IX, 5-15-2003) Sec. 48-5. Civil remedies and abatement.

(a) In the event that any person violates any provision of this chapter, the county or other appropriate authority may, in addition to other remedies, institute an action for injunction, cleanup or stop work orders, mandamus, irreversible damage fines, lien on property or other appropriate action or proceeding to prevent such unlawful acts or to correct or abate any such violation. In addition, the county may immediately revoke or suspend any and all business, building, development or any and all other county issued permits related to the property or properties involved with the violation until such time that compliance is met, or until the ruling of a court of competent jurisdiction is obtained, at which time respective permits may be reissued.

(b) Upon finding evidence, a written notice of violation may be issued at the discretion of the enforcing officer in lieu of a citation. In the absence of corrective action or in the event that a second violation occurs, the evidence constituting the notice of violation may be submitted as evidence for consideration as a first offense before a court with competent jurisdiction and the pending case treated as a second offense by the court as defined in section 48-3(a)(2).

(c) If a person is found guilty of a violation of the provisions of this chapter, the court and/or the county commission may cause written notice to be given, or incorporate into the court order to the violator instructing that person to properly address any provision still remaining in violation of this chapter for which said violation is convicted. Such notice shall be by personal service and in the event the violation cannot be so served, then by registered mail sent to the violator's last known address.

(d) Upon failure, neglect or refusal of any person so notified to properly address said provisions within 20 days after receipt of notice as provided in this section, the county commission is hereby authorized and empowered to cause the cleanup, removal or disposal of, including but not limited to, any litter, or any type of waste as defined in this chapter, dumped, deposited, thrown, or left on public or private property in violation of the chapter on behalf of the county. The expenses incurred by the county, shall be chargeable to the violator and the county commission and/or the court shall send a statement of the amount due for said expenses by registered mail.

(e) When the full amount of such charges are not paid by the violator within 30 days after receipt of said statement as provided for in this section, the county commission shall cause to be recorded in the execution docket a sworn statement showing the cost and expense incurred by the county, the dates of county action, the location of the property for which action was taken, and the name of the person to be charged for the expenses incurred. The recordation of such statement shall constitute a lien on the personal and real property of the person to be charged and shall remain in full force and effect until final payment is received in full, including accrued interest from the date of recording and any and all costs. Such amount as shall constitute final payment shall be subject to collection in the manner fixed by law for the collection of taxes.

(f) This section shall apply with full force and effect regardless of the provisions of any order of the court in which the violator was convicted. This section should not be construed as an excuse for failure on the part of the violator to perform any cleanup ordered by the court, nor shall it be considered as a mitigating factor in any contempt action against a violator who has failed to obey the order of the court.

(Res. No. 2003-13, § X, 5-15-2003) Sec. 48-6. Evidence of violations.

(a) Whenever litter, or any type of waste as defined in this chapter, is thrown, deposited, dropped, or dumped by any person or from any motor vehicle, boat, airplane, or other conveyance in violation of this chapter, it shall be prima facie evidence that said person or the operator of the conveyance has violated this chapter.

(b) Whenever any litter, or any type of waste as defined in this chapter, which is dumped, deposited, thrown, or left on public or private property in violation of this chapter is discovered to contain any article or articles, including, but not limited to letters, bills, publications, or other writings which display the name of a person thereon in such a manner as to indicate that the article belongs or belonged to such person, it shall be a rebuttable presumption that such person has violated this chapter.

(Res. No. 2003-13, § XI, 5-15-2003) Sec. 48-7. Recovered materials.

Recovered materials and recovered materials processing facilities are subject to rules as defined in Ga. Adm. Code § 391-3-4 et seq. of the Georgia Rules for Solid Waste Management.

(Res. No. 2003-13, § VI, 5-15-2003) Sec. 48-8. Yard trimmings.

Yard trimmings shall not be placed in or mixed with solid waste. Yard trimmings shall not be disposed at any solid waste disposal facility having lines and leachate collection systems or requiring vertical expansion within the county. Yard trimmings shall be sorted and stockpiled or chipped, composted, used as mulch or otherwise beneficially reused or recycled to the maximum extent feasible. Any yard trimmings to be collected by any entity other than the property owner shall be sorted and stored in such a manner as to facilitate collection, composting, or other handling.

(Res. No. 2003-13, § XII, 5-15-2003) Sec. 48-9. Recycling.

The county commission hereby finds that it is in the best interest of citizens of the county, in order to promote the health, safety, and welfare of the citizens of the county, to recycle as many waste materials as economically feasible in order to reduce the accumulation of litter and garbage and solid waste materials which must be properly disposed of; therefore, it is the policy of the county commission to encourage recycling whenever practicable and economical.

(Res. No. 2003-13, § XIII, 5-15-2003) Secs. 48-10—48-20. Reserved.

ARTICLE II. WASTE DISPOSAL

Sec. 48-21. Generally.

(a) The owner or occupant of any premises shall be responsible for the sanitary handling and disposal of all litter, waste, scrap tires, and municipal, commercial or industrial solid waste on the premises used or occupied by such person.

(b) It shall be unlawful to dump, open dump, or permit the dumping of litter, waste, scrap tires, municipal, commercial, or industrial solid waste or recyclables at any place in the county including, and without limitations, in or on any public highway, road, alley, or thoroughfare, including any portion of the right-of-way thereof, any public or private property in the county or any waters in the county unless:

(1) Such litter or waste originates in the county or other areas authorized by the county commission;

(2) The property is designated by the commission or his duly designated agent for the disposal of litter, waste, municipal, commercial or industrial solid waste, scrap tires or recovered materials and the person is authorized to use such property;

(3) The litter, waste, municipal, commercial or industrial solid waste, recyclables or scrap tires are placed into a receptacle or container installed specifically for such property; and

(4) The property has a valid solid waste handling permit issued by the state environmental protection division (EPD) when required.

(c) All persons defined as scrap tire generators, scrap tire carriers, scrap tire processors, including scrap tire sorters, and retail tire dealers shall be subject to rules as defined in Ga.

Adm. Code § 391-3-4 et seq. of the Georgia Rules for Solid Waste Management and shall handle scrap tires in accordance with the provisions of O.C.G.A. § 12-8-20 et seq. and the Georgia Rules for Solid Waste Management, Ga. Adm. Code § 391-3-4 et seq., applicable to solid waste.

(d) This section shall not limit the disposal of rural household waste by burning and the burning of agricultural fields and debris as may otherwise be authorized by law.

(Res. No. 2003-13, § II, 5-15-2003) Sec. 48-22. Dumping of household garbage prohibited; violations; private landfills permitted.

(a) It is unlawful for any person or legal entity to dump or otherwise dispose of any household garbage unless the same is disposed of by placing it in authorized containers or landfill.

(b) Any person who violates this section shall be guilty of a misdemeanor.

(c) This section shall not prohibit any person or legal entity from operating a private landfill, provided the same complies with all applicable county, state and federal regulations.

Sec. 48-23. Burning prohibited.

No burning of garbage at the county waste site shall be permitted and violators will be subject to punishment of a misdemeanor.

Sec. 48-24. Transporting solid waste and litter.

(a) All vehicles, driving or stationary, within the county shall be so constructed, loaded, covered, or securely fastened so as to prevent municipal, commercial, or industrial solid waste or any load, contents, litter, or other such waste or materials from flowing freely, being blown, scattered, leaked, spilt, or in any manner deposited in or upon any highway, road, alley, or thoroughfare, including any portion of the right of way thereof, sidewalk, other motor vehicles, pedestrians, or other public place, or upon private property within the county. However, this section shall not prohibit the necessary and permitted spreading of any substance in public road maintenance or public road construction operations.

(b) It shall be unlawful for a business or private person engaged in waste hauling or transportation for hire from businesses or private residences to dispose of materials as solid waste that have been intentionally sorted as recyclables by the business or private residence to a lawfully permitted disposal facility rather than placing the materials in the location designated by the county or appropriate authority for said recyclables.

(c) It shall be unlawful for any person to drive or move any vehicle within the county, the wheels or tires of which carry unto or deposit in or upon any highway, road, alley, or thoroughfare, including any portion of the right of way thereof, sidewalk, or other public place or upon private property within the county, mud, dirt, sticky substance, litter or foreign matter of any kind.

(Res. No. 2003-13, § III, 5-15-2003) Sec. 48-25. Regulation of landfills and solid waste collection and recycling centers.

(a) No landfill shall be operated in the county other than a landfill designated by the county commission as the county landfill, and no private municipal solid waste landfill shall be operated in the county without a solid waste handling permit issued by the state environmental protection division.

(b) No person shall deposit solid waste of any kind outside the gate of a solid waste collection and recycling center.

(c) No scavenging operation of any kind shall be allowed at a solid waste collection and recycling center.

(d) No person shall move, remove, or cross any fence, gate, barrier, or sign at a solid waste collection and recycling center.

(e) Price on solid waste brought to said center will be set to defray total cost of solid waste and recycling operations.

(f) Hours of operation of said centers will be set to maximize convenience to residents of that area.

(g) All recovered materials (recyclables) brought to collection centers will be accepted free of charge provided they are separated under current market specifications and likewise uncontaminated.

(h) All collection centers will be manned during hours of operation to ensure compliance with this chapter and all applicable state and/or federal laws.

(i) Attendant on duty will have full authority of said center consistent with this chapter.

(j) All rules listed above shall apply to all public and/or private property in said county, all waters and/or waterways of said county, and all county solid waste collection and recycling centers.

(Res. No. 2003-13, § V, 5-15-2003) Secs. 48-26—48-59. Reserved.

ARTICLE III. LITTERING

Sec. 48-60. Definitions.

The following words, terms and phrases, when used in this article, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning:

Dumpster site means any site within the county provided by the governing authority of the county for the disposal or recycling of metal, glass, aluminum, cardboard, paper products and household garbage.

Household garbage means animal, vegetable and fruit refuse matter and other refuse matter ordinarily generated by byproducts of a household such as cans, bottles, paper, cardboard, plastics, and wrapping or packaging materials.

Litter means all sand, gravel, slag, brickbats, rubbish, waste material, tin cans, refuse, garbage, trash debris, dead animals, scrap tires or discarded materials of every kind and description.

Public or private property means the right-of-way of any road or highway, any body of water or watercourse or the shores or beaches thereof; any park, playground, building, refuge, or conservation or recreation area; and residential and farm properties, timberlands and forests.

Recycling container means a receptacle provided by the governing authority of the county at a dumpster site for the purpose of depositing materials for recycling.

Sec. 48-61. Placement of litter receptacles; posting of signs.

The county may establish and maintain receptacles for the deposit of litter at appropriate locations where the property is frequented by the public. The county shall also post signs directing persons to the receptacles and giving notice of the provisions of this article, and otherwise publicize the availability of litter receptacles and requirements of this article.

Sec. 48-62. Regulation of solid waste or litter containers and receptacles.

(a) All solid waste or litter containers or receptacles and their surrounding area shall be maintained in as sanitary a manner as is reasonably possible consistent with its use for solid waste and litter disposal.

(b) Persons using solid waste and litter containers or receptacles shall deposit only authorized solid waste and refuse in the appropriate container or receptacle.

(c) No person shall deposit a scrap tire in any container or receptacle unless authorized by the owner of the receptacle or the county commission or its designee.

(d) No person shall deposit any burning or smoldering material in such container or receptacle, or set fire to the contents of any such container or receptacle.

(e) No person shall deposit large noncompatible articles in containers or receptacles such as but not limited to, stoves, refrigerators, bedsprings, automobile parts, boat parts, large tree limbs or air conditioning units, except containers or receptacles designated for that purpose only.

(f) No person shall deposit any flammable or explosive materials in any such container or receptacle.

(g) No dead animals shall be deposited in any such container or receptacle, except containers or receptacles designed for such purpose and so designated by the county commission.

(h) No person shall willfully damage or alter the location of any such container or receptacle without the written consent of the county commission.

(i) No salvage or scavenging operations shall be conducted in or around such containers or receptacles except by written consent of the county commission.

(j) No person shall indiscriminately scatter or disperse the contents of any containers or receptacles.

(k) No person shall deposit any solid waste at a county solid waste collection and recycling center unless such solid waste is contained in a manner that it can be handled by the attendant and shall be deposited only during the official hours of operation unless express written permission is given by the county commission or its designee.

(l) No person shall deposit solid waste, litter or liquid of any kind at any county solid waste collection and recycling center into county-owned receptacles or containers designated for the collection of recovered materials. Only authorized materials such as glass, aluminum, newspaper, cardboard, plastic, and tin or other accepted material may be deposited in the appropriate container designated for said material.

(Res. No. 2003-13, § IV, 5-15-2003) Sec. 48-63. Accumulation.

(a) No owner or occupant of any such property shall bury or burn litter or waste without prior authorization and written consent from the applicable regulatory agency, including but not limited to, the United States Environmental Protection Agency, state environmental protection division and/or the state forestry commission. Nothing in this provision shall authorize or be construed to permit the burial or burning of any material which is otherwise prohibited by state and/or federal law.

(b) No owner or occupant of any property shall cause, suffer or allow the accumulation, on his or her premises, of garbage, litter or waste where such material creates or causes a health hazard to neighbors or other citizens, or which is unsightly or emits foul or obnoxious odors.

(c) The conduct described in subsections (a) and (b) of this section shall constitute a separate violation of this chapter for each day the garbage, litter or waste material remains or continues to unlawfully pollute, contaminate or burn on such premises.

(Res. No. 2003-13, § VII, 5-15-2003) Sec. 48-64. Dumping prohibited.

It shall be unlawful for any person to dump, deposit, throw, or leave or to cause or permit the dumping, depositing, placing, throwing or leaving of litter on any public or private property in the county or any waters in this county unless:

(1) The property is designated by this county or by any of its agencies or political subdivisions for the disposal of litter and the person is authorized by this county to use such property;

(2) The litter is placed in a litter receptacle or container installed on such property for such purpose; or

(3) The person is the owner of tenant in lawful possession of such property or has first obtained consent of the owner or tenant in lawful possession or unless the act is done under the personal direction of the owner or tenant, all in a manner consistent with state, federal and local regulations and with the public welfare.

Sec. 48-65. Littering from vehicles prohibited; presumption.

Whenever litter is thrown, deposited, dropped, or dumped from any motor vehicle, boat, airplane, or other conveyance in violation of this article, it shall be prima facie evidence that the operator of the conveyance has violated this article.

Sec. 48-66. Identification information; presumption.

Whenever any litter which is dumped, deposited, thrown, or left on public or private property in violation of this article is discovered to contain any article, including, but not limited to, letters, bills, publications or other writings which display the name of a person thereon in such a manner as to indicate that the article belongs or belonged to such person, it shall be a rebuttable presumption that such person has violated this article.

Sec. 48-67. Vandalizing containers prohibited.

It shall be unlawful for any person to set fire to the contents of, indiscriminately scatter or disperse the contents of, or otherwise vandalize any containers provided by any county for the dumping of trash or garbage.

Sec. 48-68. Recycling containers to be used for recyclable materials only.

No person shall deposit in a recycling container any material other than that for which the recycling container is labeled to receive.

Chapter 49

RESERVED

Chapter 50

TAXATION*

ARTICLE I. IN GENERAL

Secs. 50-1—50-18. Reserved.

ARTICLE II. AD VALOREM TAX*

Sec. 50-19. Claims for tax refund based on obvious clerical error.

Where the reason for the claim for a tax refund of ad valorem property taxes paid is based on an obvious clerical error the board of commissioners delegates its authority to approve or disapprove said claims for refunds of ad valorem property taxes jointly to the Chief Tax Assessor in the Lumpkin County Tax Assessors Office and the Lumpkin County Tax Commissioner in the Lumpkin County Tax Commissioners Office. Both the chief tax assessor and the tax commissioner must agree on the approval or disapproval of a claim. In the event of a dispute between them, just as in a disputed case where there is no obvious error, the approval or disapproval of a claim must be made by the board of commissioners.

(Res. No. 2009-01, 1-22-2009; Res. No. 2013-04, 1-22-2013) Sec. 50-20. Authority of tax commissioner to waive certain taxes.

The Tax Commissioner of Lumpkin County may waive, in whole or in part, the collection of any amount due the taxing authorities for which taxes are collected, when such amount represents a penalty assessed for failure to comply with the laws governing the assessment and collection of ad valorem taxes, and when the Tax Commissioner of Lumpkin County reasonably determines that the default giving rise to the penalty was due to reasonable cause and not due to gross or willful neglect or disregard of the law or of regulations or instructions issued pursuant to the law.

In the case of penalties arising from the failure of the taxpayer to comply with the terms, conditions, or covenants required with respect to properties receiving any type of preferential assessment, the Tax Commissioner of Lumpkin County shall not be authorized to waive any portion of the penalty that represents a recovery by the taxing authorities of any amount by which taxes were reduced as a result of the granting of such preferential assessment.

The Tax Commissioner of Lumpkin County has the sole discretion regarding the administration of the provisions of O.C.G.A. § 48-5-242 and any guidelines which may be established by this board when grating the waivers.

(Res. No. 2009-03, 1-22-2009; Res. No. 2013-02, 1-22-2013) Sec. 50-21. Foreclosure of delinquent tax liens.

The duly elected Tax Commissioner for Lumpkin County shall have the authority to commence tax foreclosure and to file petitions with the Lumpkin County Superior Court in accordance with O.C.G.A. § 48-4-76.

(Res. No. 2009-55, 8-20-2009; Res. No. 2013-05, 1-22-2013) Secs. 50-22—50-43. Reserved.

ARTICLE III. GROSS PREMIUMS TAX*

Sec. 50-44. On insurance other than life insurance.

In accordance with O.C.G.A. § 33-8-8.2, there is hereby levied an annual tax upon each insurer doing insurance business within the unincorporated area of the county, in an amount equal to 2.5 percent of the gross direct premiums received during the calendar year on all insurance, other than life insurance, as defined in O.C.G.A. § 33-3-5(2), (3), (4) and (5). The term "gross direct premiums" means gross direct premiums as used in O.C.G.A. § 33-8- 8.2(a).

Secs. 50-45—50-61. Reserved.

ARTICLE IV. HOTEL-MOTEL TAX†

Sec. 50-62. Purpose.

The ordinance from which this article is derived is enacted by virtue of the powers provided in O.C.G.A. § 48-13-51. The purpose of this article is to enact an excise tax on rooms, lodgings and accommodations operating in the unincorporated areas of the county for the purposes of promoting, attracting, stimulating, and developing conventions and tourism in the county and for the provision of other local government services.

(Res. No. 2018-51, exh. A, 9-18-2018; Res. No. 2020-23, (Exh. A), 4-21-2020; Res. No.

2023-33, Exh. A, 6-20-2023) Sec. 50-63. Definitions.

As used in this article, the following words, terms and phrases shall have the meanings ascribed to them herein, except when the context clearly indicates a contrary meaning.

Guest means any person or entity who receives a room or rooms, lodgings, or accommodations furnished by any person or legal entity licensed by, or required to pay business or occupation taxes to, the county for operating within the special district a hotel, motel, inn, lodge, tourist camp, tourist cabin, campground, or any other place in which rooms, lodgings, or accommodations are regularly furnished for value.

Innkeeper means any person or entity who furnishes for value to the public any room or rooms, lodgings, or accommodations furnished by any person or legal entity licensed by, or required to pay business or occupation taxes to, the county for operating within the special district a hotel, motel, inn, lodge, tourist camp, tourist cabin, campground, or any other place in which rooms, lodgings, or accommodations are regularly furnished for value.

Rent means the considerations or value received in money or otherwise, including all receipts, cash, credits, and property or services of any kind or nature, and also the amount for which credit is allowed by the innkeeper to the guest, without any deduction therefrom whatsoever.

(Res. No. 2018-51, exh. A, 9-18-2018; Res. No. 2020-23, (Exh. A), 4-21-2020; Res. No.

2023-33, Exh. A, 6-20-2023) Sec. 50-64. Rate of levy.

(a) There is hereby set and levied an excise tax in the amount of eight percent upon the furnishing for value to the public of any room or rooms, lodgings, or accommodations furnished by any person or legal entity licensed by, or required to pay business or occupation taxes to, the county for operating within the unincorporated area of the county a hotel, motel, inn, lodge, tourist camp, tourist cabin, campground, or any other place in which rooms, lodgings, or accommodations are regularly furnished for value. The tax shall be paid upon any occupancy occurring on or after August 1, 2023, unless such occupancy occurs from a reservation made prior to August 1, 2023, and in such case the tax shall be paid at the former rate of 5%.

(1) The excise tax shall be imposed on any person or legal entity licensed by or required to pay a business or occupation tax to the governing authority imposing the tax for operating a hotel, motel, inn, lodge, tourist camp, tourist cabin, campground, or any other place in which rooms, lodgings, or accommodations are regularly furnished for value and shall apply to the furnishing for value of any room, lodging, or accommodation. Every person or entity subject to a tax levied as provided herein shall, except as otherwise provided in this article, be liable for the tax at the applicable rate on the lodging rent actually collected or received, if the amount of taxes collected from the guest is in excess of the total amount that should have been collected, the total amount actually collected must be remitted. It shall be the duty of every innkeeper to collect the tax imposed herein.

(2) Any tax levied as provided in this article is also imposed upon every person or entity who is a guest and who receives a room, lodging, or accommodation that is subject to the tax levied under this article. Every such guest subject to the tax levied under this article shall pay the tax to the person or entity providing the room, lodging, or accommodation. The tax shall be a debt of the person obtaining the room, lodging, or accommodation to the person or entity providing such room, lodging, or accommodation until it is paid and shall be recoverable at law by the person or entity providing such room, lodging, or accommodation in the same manner as authorized for the recovery of other debts. The person or entity collecting the tax from the guest shall remit the tax to the county, and the tax remitted shall be a credit against the tax imposed by subsection (1) on the person or entity providing the room, lodging, or accommodation.

(b) The tax authorized by this article shall not apply to:

(1) Charges made for any rooms, lodgings, or accommodations provided to any persons who certify that they are staying in such room, lodging, or accommodation as a result of the destruction of their home or residence by fire or other casualty;

(2) The use of meeting rooms and other such facilities or any rooms, lodgings, or accommodations provided without charge;

(3) Any rooms, lodgings, or accommodations furnished for a period of one or more days for use by Georgia state or local governmental officials or employees when traveling on official business. Notwithstanding the availability of any other means of identifying the person as a state or local government official or employee, whenever a person pays for any rooms, lodgings, or accommodations with a state or local government credit or debit card, such rooms, lodgings, or accommodations shall be deemed to have been furnished for use by a Georgia state or local government official or employee traveling on official business for purposes of the exemption provided by this subsection. For purpose of the exemption provided under this subsection, a local government official or employee shall include officials or employees of counties, municipalities, consolidated governments, or county or independent school districts;

or

(4) Charges made for continuous use of any rooms, lodgings, or accommodations after the first 30 days of continuous occupancy.

(Res. No. 2018-51, exh. A, 9-18-2018; Res. No. 2020-23, (Exh. A), 4-21-2020; Res. No.

2023-33, Exh. A, 6-20-2023) Sec. 50-65. Registration of innkeeper.

(a) Every person engaging in or about to engage in business as an innkeeper in the unincorporated areas of the county shall immediately register said business with the planning department of the county on a form provided by the planning department for such purpose.

{1) The required registration hereunder shall set forth the name under which the innkeeper transacts business or intends to transact business, the location of the innkeeper's place of business, and such other information as would facilitate the collection of the tax by the finance department.

(2) The registration shall be signed by the innkeeper if a natural person, by an officer if the innkeeper is a corporation or a partner if the innkeeper is a partnership.

{3) A separate registration shall be required for each place of business of an innkeeper.

For the purposes of this article, each hotel, motel, inn, lodge, tourist camp, tourist cabin, campground, or any other place in which rooms, lodgings, or accommodations are regularly furnished for value is considered a separate place of business and requires a separate registration.

(Res. No. 2018-51, exh. A, 9-18-2018; Res. No. 2020-23, (Exh. A), 4-21-2020; Res. No.

2023-33, Exh. A, 6-20-2023) Sec. 50-66. Certificate of taxing authority.

Upon the registration of an innkeeper as provided in section 50-65, the planning department shall issue to such innkeeper without charge a certificate of authority to collect the tax on guests. Each certificate shall state the name and location of the business to which it relates.

(Res. No. 2018-51, exh. A, 9-18-2018; Res. No. 2020-23, (Exh. A), 4-21-2020; Res. No.

2023-33, Exh. A, 6-20-2023) Sec. 50-67. Due date and required return.

(a) All taxes levied by this article shall be due and payable to the finance department or the County's designated service provider monthly on or before the 20th day of every month next succeeding each respective month in which such taxes are collected, and payment shall be accompanied by a return for the preceding monthly period showing the gross rent, rent from long-term guests or otherwise exempt guests, taxable rent, amount of tax collected or otherwise due for a period, and such other information as may be required by the finance department or the governing authority of the county.

(b) Any due date that falls on a weekend or holiday will be accepted on the next business day without penalty.

(c) The finance department shall transfer to the general county fund such excise taxes as have been paid under the provisions of this article on a monthly basis, and such funds shall thereafter at the direction of the board of commissioners be transferred as may be provided by contract to the Dahlonega-Lumpkin County Chamber of Commerce for the promotion of the tourism industry in the county, or as may otherwise be determined and directed by the board of commissioners for the purposes of promoting, attracting, stimulating, and developing conventions and tourism in the county and for the provision of other local government services as provided by law.

(Res. No. 2018-51, exh. A, 9-18-2018; Res. No. 2020-23, (Exh. A), 4-21-2020; Res. No.

2023-33, Exh. A, 6-20-2023) Sec. 50-68. Collection fee allowed innkeepers.

Innkeepers collecting the tax levied hereunder shall be allowed a percentage of the tax due and accounted for and shall be reimbursed in the form of a deduction in submitting, reporting, and payment of the amount due, if said amount is not delinquent at the time of payment. The rate of the deduction shall be the same rate authorized pursuant to O.C.G.A.

§ 48-13-52.

(Res. No. 2018-51, exh. A, 9-18-2018; Res. No. 2020-23, (Exh. A), 4-21-2020; Res. No.

2023-33, Exh. A, 6-20-2023) Sec. 50-69. Civil penalties.

(a) In the event of innkeeper's failure to pay full amount of the tax when due, there shall be imposed, in addition to other penalties provided by law, a penalty to be added to the tax in the amount of five percent or $5.00, whichever is greater, if the failure is for not more than 30 days and an additional five percent or $5.00, whichever is greater, for each additional 30 days or fraction of 30 days during which the failure continues. The penalty for any single violation shall not exceed 25 percent or $25.00 in the aggregate, whichever is greater. If the failure is due to providential cause shown to the satisfaction of the county in affidavit form attached to the return and remittance is made within ten days of due date, the return may be accepted exclusive of penalties and interest. In the case of a false or fraudulent return or of a failure to file a return where willful intent exists to defraud the governing authority of any tax due under this article, a penalty of 50 percent of the tax due shall be assessed.

(b) All civil penalties and interest added to any tax imposed under this article and collected by the county shall be included as revenue derived from such tax for purposes of the expenditure requirements imposed on the county as provided by law.

(Res. No. 2018-51, exh. A, 9-18-2018; Res. No. 2020-23, (Exh. A), 4-21-2020; Res. No.

2023-33, Exh. A, 6-20-2023) Sec. 50-70. Delinquency; estimation; enforcement.

(a) If any innkeeper fails to file a return as required under the provisions of this article, the county shall make an estimate for the taxable period of taxable charges of the innkeeper.

The estimate shall be based upon any information which is or may come into the possession of the county. Based on its estimate, the county shall assess and collect the taxes, interest, and penalties, as accrued, on the basis of the assessments.

(b) The county shall give to the innkeeper written notice of the determination as herein provided. The notice may be served personally, by email or by mail; if by email or mail such service shall be addressed to the innkeeper at the address as it appears in the county's records. Service by mail is complete when placed in the U.S. Postal system for delivery by certified mail.

(c) The amount of the determination made under this section shall bear daily interest at the maximum rate permitted by law for post-judgment debts, from the 20th day of the month for which the amount or any portion thereof should have been returned, until the date of payment.

(d) In addition, a penalty of five percent of the tax due, or $5.00, whichever is greater for each 30 days or fraction thereof of delinquency, not to exceed 25 percent or $25.00 in the aggregate, whichever is greater, shall be assessed and paid by the innkeeper to the county.

(e) The estimated tax, together with applicable penalties and interest, may be collected utilizing any of the enforcement methods set forth in this article or as otherwise authorized by law.

(Res. No. 2018-51, exh. A, 9-18-2018; Res. No. 2020-23, (Exh. A), 4-21-2020; Res. No.

2023-33, Exh. A, 6-20-2023) Sec. 50-71. Required records.

Each innkeeper collecting a tax under the provisions of this article shall keep for a period of at least three years all records, receipts, invoices, and other pertinent papers setting forth the rent charged for each occupancy, the date or dates of occupancy, and such other information as the county may require.

(Res. No. 2018-51, exh. A, 9-18-2018; Res. No. 2020-23, (Exh. A), 4-21-2020; Res. No.

2023-33, Exh. A, 6-20-2023) Sec. 50-72. Enforcement, powers.

The county or its designated representative shall administer and enforce the provisions of this article for the collection of the tax imposed by this article, and in so doing shall have the power to:

(a) Examine, or authorize the examination of, books, papers, records, financial reports, equipment, and other facilities of any innkeeper subject to this article, in order to verify the accuracy of any return made, or if no return is made by the innkeeper, to ascertain and determine the amount required to be paid;

(b) Require the filing of reports by any person having in his possession or custody information relating to rentals which are subject to the tax levied by this article, and

(c) Allow a credit on any amount due and payable from persons who paid the tax levied by this article but who were erroneously or illegally subjected thereto.

(Res. No. 2018-51, exh. A, 9-18-2018; Res. No. 2020-23, (Exh. A), 4-21-2020; Res. No.

2023-33, Exh. A, 6-20-2023) Sec. 50-73. Collection by court action.

(a) At any time within three years after any tax or any portion of such tax required to be collected becomes due and payable, the county attorney or any attorney designated by the governing authority, at the direction of the governing authority, may bring an action in a court of competent jurisdiction in the name of the county to collect such amount due together with interest, court fees, attorney's fees, and other legal fees incident thereto.

(b) All cost of such collection shall be paid to the general fund from the tourism, convention and trade show account at the time the costs are accrued, and before any fees available at that time are paid to any authorized entity.

(c) To the extent that any judgments are collected following a favorable award of the court, such fees shall be included as revenue derived from such tax for purposes of the expenditure requirements imposed on the county as provided by law.

(Res. No. 2018-51, exh. A, 9-18-2018; Res. No. 2020-23, (Exh. A), 4-21-2020; Res. No.

2023-33, Exh. A, 6-20-2023) Sec. 50-74. Effect of sale of establishment.

If any innkeeper becomes liable for any amount required to be paid by this article and subsequent thereto sells out or quits the business, the successors or assignees of such innkeeper shall withhold a sufficient amount of the purchase price to cover such amount due.

If such purchaser of the business fails to withhold the required amount, he shall become personally liable therefor to the extent of the tax owed, together with any applicable penalties and interest.

(Res. No. 2018-51, exh. A, 9-18-2018; Res. No. 2020-23, (Exh. A), 4-21-2020; Res. No.

2023-33, Exh. A, 6-20-2023) Sec. 50-75. Criminal penalties for failure to make a return and pay taxes due.

(a) It shall be unlawful for any innkeeper to fail to make a return and pay the taxes due under this article to any applicable governing authority imposing a tax under this article.

(b) (l) If the tax liability is $10,000.00 or less, any person who violates subsection (a) of this Code section shall be guilty of a misdemeanor.

(2) If the tax liability is more than $10,000.00, any person who violates subsection (a) of this Code section shall be guilty of a felony and, upon conviction thereof, shall be punished by imprisonment for not less than one year nor more than ten years.

(Res. No. 2018-51, exh. A, 9-18-2018; Res. No. 2020-23, (Exh. A), 4-21-2020; Res. No.

2023-33, Exh. A, 6-20-2023) Sec. 50-76. Criminal penalties for failure, neglect, or refusal to collect tax.

(a) It shall be unlawful for any innkeeper to fail, neglect, or refuse to collect the tax provided in this article, either by himself or herself or through his or her agents or employees.

(b) In addition to the penalty of being liable for and paying the tax himself or herself, any person who violates subsection (a) of this Code section shall be guilty of a misdemeanor and, upon conviction thereof, shall be punished by a fine of not more than $100.00 or imprisonment in the county jail for not more than three months, or both.

(Res. No. 2018-51, exh. A, 9-18-2018; Res. No. 2020-23, (Exh. A), 4-21-2020; Res. No.

2023-33, Exh. A, 6-20-2023) Sec. 50-77. Criminal penalties for making false or fraudulent return.

(a) It shall be unlawful for any innkeeper required by this article to make, render, sign, or verify any return to make a false or fraudulent return with intent to evade the tax levied by this article.

(b) Any person who violates subsection (a) of this Code section shall be guilty of a misdemeanor and, upon conviction thereof, shall be punished by a fine of not less than $100.00 nor more than $300.00 or confinement in the county jail for not less than 30 days nor more than three months, or both fine and confinement.

(Res. No. 2018-51, exh. A, 9-18-2018; Res. No. 2020-23, (Exh. A), 4-21-2020; Res. No.

2023-33, Exh. A, 6-20-2023) Sec. 50-78. Criminal penalties for failure or refusal to furnish return or supplemental return.

(a) It shall be unlawful for any innkeeper subject to this article to fail or refuse to furnish any return required to be made by this article or to fail or refuse to furnish a supplemental return or other data required by the governing authority imposing a tax under this article.

(b) Any person who violates subsection (a) of this Code section shall be guilty of a misdemeanor.

(Res. No. 2018-51, exh. A, 9-18-2018; Res. No. 2020-23, (Exh. A), 4-21-2020; Res. No.

2023-33, Exh. A, 6-20-2023) Sec. 50-79. Criminal penalties for failure to keep records or open records to inspection.

(a) It shall be unlawful for any innkeeper subject to this article to fail to keep records or to fail to open the records to inspection as required by law.

(b) Any person who violates subsection (a) of this Code section shall be guilty of a misdemeanor.

(Res. No. 2018-51, exh. A, 9-18-2018; Res. No. 2020-23, (Exh. A), 4-21-2020; Res. No.

2023-33, Exh. A, 6-20-2023) Sec. 50-80. Other violations; penalty.

(a) It shall be unlawful for any innkeeper to violate any other provision of this article for which punishment is not otherwise provided.

(b) Any person who violates subsection (a) of this Code section shall be guilty of a misdemeanor.

(Res. No. 2018-51, exh. A, 9-18-2018; Res. No. 2020-23, (Exh. A), 4-21-2020; Res. No.

2023-33, Exh. A, 6-20-2023) Sec. 50-80.1. Repeal of conflicting provisions.

All ordinances or parts of ordinances in conflict with this article and not preserved hereby are hereby repealed.

(Res. No. 2018-51, exh. A, 9-18-2018; Res. No. 2020-23, (Exh. A), 4-21-2020; Res. No.

2023-33, Exh. A, 6-20-2023) Sec. 50-80.2. Severability.

If any section, provision or clause of any part of this article shall be declared invalid or unconstitutional, or if the provisions of any part of this article as applied to any particular situation or set of circumstances shall be declared invalid or unconstitutional, such individuality shall not be construed to affect the provisions of this article not so held to be invalid, or the application of this article to other circumstances not so held to be invalid. It is hereby declared as the intent that this article would have been adopted had such invalid portion not been included herein.

(Res. No. 2018-51, exh. A, 9-18-2018; Res. No. 2020-23, (Exh. A), 4-21-2020; Res. No.

2023-33, Exh. A, 6-20-2023)

ARTICLE V. TAX-EXEMPT DEBT POLICY*

Sec. 50-81. Objective.

To comply with all applicable federal and state laws, rules and regulations related to the issuance of tax-exempt debt (the "debt").

(Res. No. 2013-25, exh. A, 3-19-2013) Sec. 50-82. Scope.

This policy (the "policy") applies to all debt issued for the benefit of Lumpkin County (the "county") and its related entities.

(Res. No. 2013-25, exh. A, 3-19-2013) Sec. 50-83. Policy.

The county shall comply with all federal and state laws, rules and regulations related to the issuance of debt.

(Res. No. 2013-25, exh. A, 3-19-2013) Sec. 50-84. Responsibility.

The county finance director shall be administratively responsible for the policy. The county finance director shall be responsible for reviewing the requirements and responsibilities of the county under the policy with bond counsel on or before the closing date of any debt issued by the county.

(Res. No. 2013-25, exh. A, 3-19-2013) Sec. 50-85. Dissemination and training.

The policy shall be disseminated to all relevant personnel in the county and to the auditor.

The county finance director shall provide appropriate training to all personnel directly involved in the administration of tax-exempt debt to ensure they comply with the provisions of the policy. The county finance director shall consult as appropriate with qualified attorneys with respect to the content of such training.

(Res. No. 2013-25, exh. A, 3-19-2013) Sec. 50-86. Review.

The policy shall be reviewed and revised annually by the county finance director and redistributed to all relevant personnel in the county and to the auditor.

The county finance director shall annually conduct a due diligence review of all debt currently outstanding to ensure proper compliance with each of the provisions of the policy.

If county finance director discovers non-compliance with any provisions of the policy, steps necessary to correct the noncompliance will be taken within ten business days of the conclusion of the annual due diligence review. Records of all corrective action taken shall be retained in accordance with the policy.

(Res. No. 2013-25, exh. A, 3-19-2013) Sec. 50-87. Record keeping.

All records relating to the debt needed to comply with Section 6001 of the Internal Revenue Code of 1986, as amended (the Code) shall be maintained. These records shall be kept in paper or electronic form and shall include, among other things, (i) basic records relating to the transaction (including the bond documents, the opinion of bond counsel, etc.), (ii) documents evidencing the expenditure of the proceeds of the debt, (iii) documentation evidencing the use of debt-financed property by public and private entities (e.g., copies of management contracts, leases and research agreements) and (iv) documentation pertaining to any investment of debt proceeds (including the purchase and sale of securities, SLG subscriptions, yield calculations for each class of investments, actual investment income received from the investment of the proceeds of the debt, guaranteed investment contracts and rebate calculations. Such records must be maintained as long as the debt is outstanding, plus three years after the final payment or redemption date of the respective debt.

(Res. No. 2013-25, exh. A, 3-19-2013) Sec. 50-88. Use of proceeds.

A list of all property financed with the proceeds of the debt shall be created and maintained. The use of such property shall be monitored to ensure that such use does not constitute private business use within the meaning of the Code. Without limiting the foregoing, each contract, including but not limited to management contracts and leases, relating to such property shall be reviewed by legal counsel prior to the execution of such contract. The list of property shall be reviewed at least annually to ensure that none of the property has been sold.

(Res. No. 2013-25, exh. A, 3-19-2013) Sec. 50-89. Remedial action.

In the event that property financed with the proceeds of the debt is used in a manner that constitutes private business use or the property is sold, the remediation provisions of Treasury Regulation § 1.141-12 shall be carried out in consultation with bond counsel.

(Res. No. 2013-25, exh. A, 3-19-2013) Sec. 50-90. Yield restriction.

If bond counsel advises that a fund or account needs to be yield restricted (i.e., not invested at a yield in excess of the debt), the moneys on deposit in such fund or account shall be invested in United States Treasury Obligations—State and Local Government Series, appropriate yield reduction payments shall be made if permitted by the Code or the county finance director shall establish other procedures to ensure that such fund or account is yield restricted.

(Res. No. 2013-25, exh. A, 3-19-2013) Sec. 50-91. Rebate.

At the time the debt is issued, the county finance director shall determine if he or she reasonably expects that one of the arbitrage rebate exceptions will be satisfied. If the arbitrage rebate exception relates to the time period over which the proceeds of the debt are spent, the county finance director shall verify that the appropriate expenditures have been made at each milestone. If one of the milestones is not satisfied or the county finance director does not reasonably expect that one of the arbitrage rebate exceptions will be satisfied, an outside arbitrage rebate consultant shall be retained unless the county finance director has determined that positive arbitrage will not be earned.

(Res. No. 2013-25, exh. A, 3-19-2013) Chapter 51

TELECOMMUNICATIONS*

Sec. 51-1. General.

(a) No telecommunications facility or tower shall be located, constructed, erected or operated within the unincorporated areas of Lumpkin County unless and until the facility or tower has been lawfully permitted in accordance with, and remains in compliance with these telecommunications towers and facilities rules and regulations of Lumpkin County, Georgia.

(b) These regulations are designed and intended to balance the interests of the residents of Lumpkin County, telecommunications providers, and telecommunications customers in the siting of telecommunications towers and facilities within unincorporated Lumpkin County so as to protect the health, safety and integrity of the citizens and property of Lumpkin County and to foster, through a competitive environment for telecommunications carriers that does not unreasonably discriminate among providers of functionally equivalent personal wireless services. These regulations shall not prohibit, or have the effect of prohibiting, the provision of personal wireless services.

(c) These regulations shall provide for the appropriate location and development of telecommunications facilities within unincorporated Lumpkin County; protect Lumpkin County's built and natural environment by promoting compatible design standards for telecommunications facilities; minimize adverse visual impacts of telecommunications facilities through careful design, siting, landscape screening and innovative camouflaging techniques; avoid potential damage to adjacent properties from tower or antennae failure through engineering and careful siting of telecommunications tower structures and antennae; maximize use of any new and existing telecommunications towers so as to minimize the need to construct new towers and minimize the total number of towers throughout the county; and maximize and encourage use of alternative telecommunication tower structures as a primary option rather than construction of additional single-use towers.

(Res. No. 2011-04, exh. A, § 1, 1-18-2011) Sec. 51-2. Definitions.

As used in these regulations, the following terms shall have the meanings indicated:

Alternative tower structure includes man-made trees, clock towers, bell steeples, light poles and similar alternative-design mounting structures that camouflage or conceal the presence of antennae or towers.

Antenna means any exterior apparatus designed for the sending and/or receiving of electromagnetic waves for telephonic, radio, television, or personal wireless services.

Building official means the planning director for Lumpkin County, Georgia or his/her designee.

Co-location means the placement of two or more antennae, receivers, transmitters or facilities in, on or at the same location or tower.

Commercial and industrial structures include warehouses, factories, retail outlets, supermarkets, banks, garages or service stations.

Commission means the Planning Commission of Lumpkin County, Georgia.

Department means the Lumpkin County Planning Department.

Director means the Planning Director of the Lumpkin County Planning Department or his/her designee.

FAA means the Federal Aviation Administration.

FCC means the Federal Communications Commission.

Micro telecommunications facilities means those facilities located on existing buildings or structures (but not existing towers or poles) where antennae do not project more than ten feet above the top of the structure and there are no more than six antennae per site.

Mixed use building means those buildings containing both residential and non-residential uses; provided, however, that for the purposes of these regulations, this shall not include in-home occupations.

Monopole tower means a telecommunications tower consisting of a single pole, constructed without guy wires or ground anchors.

Pre-existing facility/tower means any telecommunications facility or tower or alternative tower structure: (1) which is located within Lumpkin County; or (2) which is permitted by the department or commission and which facility is pending construction and which permit has not expired; or (3) for which an application is pending before the department or commission and which application has not expired.

Pre-regulation facility/tower means any telecommunications facility constructed or permitted for construction on or before the original effective date of these regulations.

Public structures means structures owned or operated by a unit of government and being utilized for an authorized governmental purpose, including, but not limited to facilities such as: fire stations, libraries, community centers, convention centers, courthouses, utility structures, water towers, elevated roadways, bridges, flag poles, schools, hospitals, clock or bell towers, warning towers and light poles.

Telecommunications facilities means all antennae, towers and associated buildings and structures designed and utilized for transmitting or receiving analog, digital, microwave, cellular, telephone, personal wireless service or similar forms of electronic communication or signal.

A "Class B" telecommunications facility means any telecommunications facility under 70 feet in total height and (1) owned and operated by a non-commercial amateur radio operator licensed by the Federal Communications Commission; or (2) designed for non-commercial over-the-air reception only of radio or television broadcast signals.

A "Class C" telecommunications facility means any non-commercial telecommunications facility under 20 feet in total height and: (1) owned and operated by an amateur radio operator licensed by the Federal Communications Commission; (2) designed for over-the-air reception only of radio or television broadcast signals; (3) designed for multichannel multipoint distribution service or direct broadcast satellite service; or (4) is a cable television headend, hub tower or antennae used solely for cable television services.

A "Class D" telecommunications facility means any micro telecommunications facility as defined above.

Telecommunications tower means any structure including but not limited to: A lattice tower, guy tower, or monopole tower, constructed as a freestanding structure or in association with a building, other permanent structure or equipment, on which is located one or more antennae intended for transmitting or receiving analog, digital, microwave, cellular, telephone, personal wireless service or similar forms of electronic communication or signal. The term includes microwave towers, common carrier towers, and cellular telephone towers.

Total height means the distance measured vertically from the ground level to the highest point when positioned for operation. The height of a tower shall include the height of any antennae positioned for operation attached or which may be attached to the highest point on the tower.

(Res. No. 2011-04, exh. A, § 2, 1-18-2011) Sec. 51-3. Location of telecommunications facilities.

(a) Authorized locations. Subject to the restrictions and requirements specifically provided for in these regulations, and subject to all other local, state and federal rules, regulations, restrictions and requirements, telecommunications facilities may be located anywhere within the unincorporated areas of Lumpkin County.

(b) Prohibited locations. Telecommunications facilities and towers shall not be permitted or located in the following areas:

(1) Towers shall not be located within five miles of a pre-existing tower or a tower pre-existing within a five-mile perimeter of Lumpkin County boundaries. Class B, Class C and Class D telecommunications facilities shall be exempt from this restriction.

(2) Facilities shall not be located within any approved residential subdivision. Class C and Class D telecommunications facilities shall be exempt from this restriction.

(3) Facilities shall not be placed in any historic district or in any scenic corridors as designated by the Lumpkin County governing authority or by any state or federal law or agency. Class C and Class D telecommunications facilities shall be exempt from this restriction.

(c) Co-location tower sites. No new tower shall be permitted unless the applicant demonstrates with sufficient evidence and to the satisfaction of the commission that no pre-existing tower can accommodate the applicant's proposed antennae or facilities. Class B, Class C and Class D telecommunications facilities shall be exempt from this restriction. Such evidence shall include signed and notarized reports and/or studies by licensed engineers. Such evidence may also include such reports, studies or opinions by such professionals or industry experts as deemed appropriate by the applicant. The commission may require the applicant to make reasonable modifications or alterations to its engineering needs, designs or requirements in order to facilitate co-location.

The evidence submitted to demonstrate that no existing tower or structure can accommodate the proposed antenna or facility shall prove one or more of the following:

(1) That no pre-existing tower satisfies the applicant's engineering needs or meets the applicant's engineering requirements;

(2) That no pre-existing tower is of sufficient height or strength to satisfy the applicant's engineering needs or meets the applicant's engineering requirements;

(3) That the applicant's proposed antenna(e) and the antenna(e) on the pre-existing tower would cause electromagnetic interference among each other;

(4) That the cost or contractual requirements of the owner of the pre-existing tower to share an existing tower or structure or to adapt a pre-existing tower for sharing are unreasonable. Costs exceeding the cost of new tower construction are presumed to be unreasonable;

(5) That there are other factors that render pre-existing towers unsuitable to meet the applicant's needs or requirements.

(Res. No. 2011-04, exh. A, § 3, 1-18-2011) Sec. 51-4. Requirements for telecommunications facilities.

The requirements set forth in this section shall govern the location and construction of all telecommunications facilities governed by these regulations.

(1) Height. No telecommunications facility shall exceed 250 feet in total height.

(2) Building codes and safety standards. All telecommunications facilities shall be maintained in compliance with applicable building codes and the applicable standards for such telecommunications facilities, as may be amended. Owners shall cause inspections of each facility to be made every 18 months to ensure structural integrity by qualified, independent engineers licensed to practice in Georgia. The results of such inspection shall be provided to the director.

(3) Regulatory compliance. All telecommunications facilities shall meet or exceed standards and regulations as may be amended by the FAA, the FCC and any other agency of the state or federal government with the authority to regulate telecommunications facilities. Owners shall provide certification to the director that each telecommunications facility is in compliance with all applicable federal and state requirements when any new users are added or building permit is sought.

(4) Security.

a. All towers shall be enclosed by decay resistant security fencing not less than six feet in height.

b. All telecommunications facilities shall be equipped with appropriate anticlimbing devices or other similar protective devices to prevent unauthorized access to the telecommunications facility.

(5) Lighting.

a. No illumination is permitted on telecommunications facilities unless:

1. Required by the FCC, FAA or other state or federal agency of competent jurisdiction;

2. Necessary for air traffic safety; or

3. An antenna is placed on an alternative tower structure or public structure that otherwise requires lighting.

b. Where lighting is required or necessary, the director or the commission may review and select the available lighting alternative that causes the least disturbance to the surrounding uses and views.

(6) Advertising. No advertising is permitted on telecommunications facilities. However, a whip antenna or panel antenna up to 12 square feet in size with appropriate shrouding may be allowed on any legally permitted permanent sign provided that all other requirements of these regulations are met.

(7) Visual impact.

a. Site location and development shall preserve the pre-existing character of the surrounding buildings and land uses to the extent possible.

b. Towers, buildings and related structures shall be integrated through location, design, materials, colors, textures, screening and landscaping to blend with the existing characteristics of the site to the extent possible.

c. Telecommunications facilities shall either maintain a galvanized steel finish or, subject to any applicable standards of the FAA or other applicable federal or state agency, be painted a neutral color or painted and/or textured to match the existing structure so as to reduce visual obtrusiveness.

d. If an antenna is installed on a structure other than a tower, or an alternative tower structure, the antenna, associated electrical and mechanical equipment, and the equipment shelter or cabinet must be of a neutral color identical to, or closely compatible with, the color of the supporting or surrounding structures(s) so as to make the antenna and related equipment as visually unobtrusive as possible. Roof-mounted antennae shall be made visually unobtrusive by screening which may include matching them with existing air conditioning units, stairs, elevator towers or other background.

e. Where feasible, telecommunications facilities shall be placed directly above, below or incorporated with vertical design elements of a building to assist further camouflage.

f. Any equipment shelter or cabinet supporting telecommunications facilities shall be concealed from public view, made compatible with the architecture of the surrounding structures or placed underground. The shelter or cabinet shall be regularly maintained.

(8) Landscaping.

a. Landscaping shall effectively screen the view of telecommunications facilities, equipment, equipment shelters or cabinets, associated buildings and fencing, where required, from adjacent public rights-of-way, public property and residential property.

b. Native vegetation and existing topography on the site shall be preserved or improved to the greatest practical extent. Disturbance of the existing topography shall only be permitted when, in the opinion of the director, it would result in less visual impact of the site to the surrounding area.

c. The director may waive or modify the landscaping requirements where lesser requirements are desirable: for visibility or security purposes, for continued operation of existing bona fide agricultural or forest uses such as farms, nurseries, tree farms or other remote agricultural or rural locations, for placement of an antenna on an existing structure; or for developed heavy industrial areas.

(9) Maintenance impacts. Equipment at a transmission facility shall be automated to the greatest extent possible to reduce traffic and congestion. Access for maintenance vehicles shall be exclusively by means of a local street abutting the site or otherwise accessible to the site.

(10) Principal, accessory and joint uses.

a. Accessory structures used in direct support of a telecommunications facility shall be allowed but not be used for offices, vehicle storage or other outdoor storage. Mobile or immobile equipment not used in direct support of a telecommunications facility shall not be stored or parked on the site of the telecommunications facility.

b. Telecommunications facilities may be located on sites containing another principal use in the same buildable area. Towers are not permitted in required setbacks.

(11) Placement, lot side and setbacks.

a. The following setback requirements shall apply to all telecommunications facilities, provided however, that the director or the commission may reduce the standard setback requirements of this section if the goals of these regulations would be better served thereby:

1. Telecommunications towers must be set back a distance of 100 feet from any property line and a distance equal to one and one-half times the full height of the tower from any off-site residential or commercial structure and from any road rights-of-way, whichever is greater;

2. Towers, guy wires and accessory facilities must satisfy the minimum building setback requirements;

3. For antennae attached to the roof or a supporting structure on a rooftop, a 1:1 setback ratio shall be maintained unless an alternative placement is approved by the director or the commission.

(12) Waiver requests. Upon special request and in the sole discretion of the director, the commission or the governing authority, waivers may be granted to the above requirements of these regulations. Waivers may be granted only in the most extreme circumstances and only upon presentation of evidence that is sufficient to the director, the commission or the governing authority to prove that there are extreme and unusual factors that require such waiver. The director, the commission or the governing authority shall take into account the purposes of these regulations and shall balance the interests of the parties affected by such a waiver.

(Res. No. 2011-04, exh. A, § 4, 1-18-2011) Sec. 51-5. Application procedures.

The owner and operator of any proposed telecommunications facility must submit a complete application to the director, undergo design review, and receive a building permit.

Applications will not be considered until complete. The director shall advise the applicant of any information or documentation needed to complete the application and shall give the applicant a reasonable amount of time to present such information or documentation.

The director or the commission may provide application form(s) which must be filled in completely and submitted with the application. In addition to these standard application form(s), all of the following information must be submitted for an application to be considered complete when applying for any permit under these regulations:

(1) Application/owner information.

a. Identification of all individuals, companies, agencies or entities that will be involved in any manner with the proposed telecommunications facility, including but not limited to: applicant(s), property owner(s), operator(s), communication carrier(s) and builder(s). The information shall include:

names, business address and telephone number(s), home address and telephone number(s). The information will include the relationship the applicant has to the facility.

b. Identification of the individual or entity that is to receive any "notice" that may be sent under these regulations.

c. Identification of a community liaison officer appointed by the applicant to resolve issues of concern to neighbors and residents relating to the construction and operation of the facility. Identification should include name, address, telephone number, facsimile number, pager number and electronic mail (e-mail) address, if available.

(2) Ownership/contractual information.

a. Certified copy of the most recent real property deed and the corresponding plat of the property upon which the facility will be located.

b. Copy of any lease, lease-purchase, right-of-way or other contract or agreement that will be involved in any manner with the facility. Construction and survey contracts need not be provided unless requested by the commission for good cause.

(3) Site information.

a. Site inventory. Each application shall include a site inventory including: a list and a map showing all of the applicant's existing telecommunications facility sites within Lumpkin County and within five miles of the county's boundaries. The list must include the following information for each site:

1. Street address;

2. Land lot, section, district and parcel number;

3. Zoning district;

4. Type of building (commercial, residential, mixed use) and number of stories;

5. The location and type of tower/antenna installation (standalone rooftop, building facade, etc.);

6. The location of the base receiver station installation(s);

7. The height from grade to the top of the antenna installation;

8. The radio frequency range in megahertz;

9. All other telecommunication facility sites within five miles of the proposed location.

b. Site plan or plans to scale specifying the location of telecommunications towers and facilities, guy wires and other support mechanisms, transmission building and/or other accessory uses, access, parking, fences, landscaped areas and adjacent land uses. Applicants shall submit both a paper location map and a latitude/longitude location in a format compatible with the software utilized by the Lumpkin County Planning Department.

c. Landscape plan to scale indicating size, spacing and type of plantings required by these regulations. The plan shall indicate significant vegetation to be removed and vegetation to be replanted to replace any vegetation lost.

d. Description of the environment surrounding the proposed telecommunications facility, including any adjacent residential structures and districts, structures and sites of historic significance or scenic corridors.

e. Description of anticipated maintenance needs for the telecommunications facility, including frequency of service, personnel needs, equipment needs and traffic, noise or safety impacts of such maintenance.

f. A utilities inventory showing the locations of all water, sewage, drainage and power easements impacting the proposed tower site.

g. Report from a qualified, independent engineer licensed in the State of Georgia, documenting the following:

1. Telecommunications facility height and design, including technical, engineering and other pertinent factors governing selection of the

proposed design;

2. Total anticipated capacity of the telecommunications facility, including number and types of antennae which can be accommodated; and

3. Evidence of structural integrity of the tower structure.

(4) Service information.

a. Definition of the area to be served by the antenna or tower and explanation of whether such antenna or tower is needed for coverage or capacity.

Identification of the geographic service area for the subject installation, including:

1. A county map showing the proposed site and the applicant's other existing telecommunications facility sites within Lumpkin County and the five-mile perimeter surrounding Lumpkin County;

2. A description of how the service area being served by the proposed facility fits into and is necessary for the service network; and

3. Evidence that the proposed facility provides the needed coverage or capacity.

(5) Additional information. The applicant shall provide any other information requested by the director or the commission in order to fully evaluate and review the application and the potential impact of the proposed telecommunications facility.

(6) Exceptions to information requirements. Applications for and concerning: Class B, Class C and Class D telecommunications facilities, and antennae being co-located on pre-existing towers or structures need not include the above "site information" except for identification of the proposed site location.

(7) Independent expert review. The director, the commission or the governing authority may in its discretion engage a licensed engineer or other appropriate professional to conduct an independent expert review of an application or any of the applications supporting documents, information or reports.

(8) Approval.

a. Decisions regarding applications for and concerning: Class B, Class C and Class D telecommunications facilities, and antennae being co-located on pre-existing towers or structures shall be made by the director.

b. Decisions regarding applications for telecommunications facilities and towers not included in subsection (8)a. above shall be made by the Lumpkin County Planning Commission. The director shall review all such applications for completeness and shall schedule the application for presentation to and decision by the commission at the next scheduled commission meeting.

The applicant or the applicant's attorney may, but will not be required to, present the application to the commission with a brief summary of the application.

c. Re-application. In the event of a denial of an application or permit, re-application for the proposed facility shall not be allowed for at least six months unless otherwise allowed by the director, the commission or the governing authority for good cause shown.

(Res. No. 2011-04, exh. A, § 5, 1-18-2011) Sec. 51-6. Co-location.

The applicant and owner shall allow other future personal wireless service companies, including public and quasi-public agencies, using functionally equivalent personal wireless technology to co-locate antennae, equipment and facilities on a telecommunications facilities unless specific technical constraints prohibit said co-location. Applicant and other personal wireless carriers shall provide a mechanism for the construction and maintenance of shared facilities and infrastructure.

Owners' fees/charges for co-location shall be reasonable in accordance with industry standards. Fees/charges based upon an equitable sharing of cost or a pro-rata division of the expense of the initial tower, property and/or lease arrangements shall be presumed to be reasonable.

(Res. No. 2011-04, exh. A, § 6, 1-18-2011) Sec. 51-7. Expiration of applications/permits.

(a) Applications. Applications that have been filed with the department for more than six months and, due to any action or inaction by the applicant, have not been approved shall be deemed expired as a matter of law.

(b) Permits. Permits that have been issued under these regulations shall expire as a matter of law if construction on the facility has not commenced within six months after approval or if the facility is not completed with nine months of approval.

(c) Notice. The department shall provide the applicant with written notice of the expiration of applications or permits. Failure to provide notice shall not invalidate the expiration.

(d) Re-application. After the expiration of an application or permit under this provision, re-application for the proposed facility shall not be allowed for at least six months unless otherwise allowed by the director, the commission or the governing authority for good cause shown.

(Res. No. 2011-04, exh. A, § 7, 1-18-2011) Sec. 51-8. Continuing compliance.

All telecommunications facilities owners, applicants and operators shall maintain all facilities in compliance with all the requirements that are set out in these regulations for permitting.

(Res. No. 2011-04, exh. A, § 8, 1-18-2011) Sec. 51-9. Discrimination among providers.

Whenever the Lumpkin County governing authority finds that the application of a provision of these regulations would result in unreasonable discrimination among providers of functionally equivalent personal wireless services, or prohibit or have the effect of prohibiting the provision of personal wireless services, the governing authority may authorize a limited exception to such provision.

(Res. No. 2011-04, exh. A, § 9, 1-18-2011) Sec. 51-10. Miscellaneous provisions.

(a) Decisions. All decisions by the director, the commission or the Lumpkin County governing authority regarding issues within the contemplation of these regulations shall be in writing.

(b) Nuisances. Telecommunications facilities shall not be maintained or operated in such a manner as to be a nuisance.

(c) Change of ownership. The director shall be notified in writing within 30 days of the transfer of ownership of any interest in any telecommunications facility, tower or alternative tower structure, or lot upon which such a structure has been located. Notification may be made by the permittee, the operator, the new owner or any other associated party.

(Res. No. 2011-04, exh. A, § 10, 1-18-2011) Sec. 51-11. Removal of telecommunications facilities.

(a) Noncompliance. If the director determines that any telecommunications facility does not comply with these regulations or any other codes, standards or requirements regulating telecommunications facilities, or determines that any facility constitutes a danger to persons or property, then, upon notice being provided by certified mail to the designated notice recipient, the applicant, or the owner of the facility, the owner(s) or operator(s) shall have 30 days to bring such facility into compliance. In the event that such telecommunications facility is not brought into compliance within 30 days of the date of the notice, the county may provide notice by certified mail to remove the telecommunications facility. In the event that such telecommunications facility is not removed within 30 days of receipt of such notice, the county may remove such facility and place a lien upon the property for the costs of removal.

Delay by the county in taking action shall not in any way waive the county's right to take action. The county may pursue any and all legal remedies available to it to insure that telecommunications facilities constituting a danger to persons or property or telecommunicaTELECOMMUNICATIONS § 51-11 tions facilities not complying with these regulations or other code standards are brought into compliance or removed. The county may seek to have the telecommunications facility removed regardless of the owner's or operator's intent to operate the tower or antenna and regardless of any permits, federal, state or otherwise, which may have been granted.

(b) Abandonment. Any telecommunications facility not operated for a continuous period of 12 months shall be considered abandoned, whether or not the owner or operator intends to make use of it or any part of it. The owner of the telecommunications facility and the owner of the property where the facility is located shall be under a duty to remove the abandoned telecommunications facility. If such antenna and/or tower is not removed within 60 days of receipt of notice by certified mail from the director or the county, the county may remove such tower and/or antenna and place a lien upon the property for the costs of removal.

The county may pursue any and all legal remedies available to it to insure that abandoned telecommunications facilities are removed. Delay by the county in taking action shall not in any way waive the county's right to take action. The county may seek to have the telecommunications facility removed regardless of the owner's or operator's intent to operate the tower or antenna and regardless of any permits, federal, state or otherwise, which may have been granted.

If the owner of an abandoned tower or antenna wishes to recommence such use, the owner first must submit a new application for a permit.

(Res. No. 2011-04, exh. A, § 11, 1-18-2011) Sec. 51-12. Pre-regulatory facilities.

(a) All telecommunications facilities constructed or permitted for construction on or before the original effective date of these regulations shall be considered authorized pre-regulation facilities and shall be allowed to continue their use. Pre-regulation facilities shall be exempt from the requirements of section 51-3 (location), section 51-4(1) (height), section 51-4(11) (placement), section 51-5 (application) and section 51-7 (expiration of applications). Preregulation facilities not in compliance with the nonexempted requirements of these regulations shall have six months to bring those facilities into compliance.

(b) Routine maintenance, including replacement with a new tower or antenna of like construction and height, shall be permitted on such pre-regulation telecommunications facilities. New construction other than routine maintenance shall comply with all requirements of these regulations.

(c) Any telecommunications facility that has received approval on or before the original date of passage of these regulations, but has not yet been constructed or placed in operation shall be considered a pre-regulation telecommunications facility so long as such approval is current and has not expired. However, such approval shall expire as a matter of law if construction on the facility has not commenced within six months after the effective date of these regulations or if the facility is not completed within nine months after the effective date of these regulations.

(d) Placement of an antenna on a pre-regulation structure shall not be considered an expansion of the pre-regulation structure; however, all possible siting and placement requirements shall be met as determined by the director.

(Res. No. 2011-04, exh. A, § 12, 1-18-2011) Sec. 51-13. Appeals.

The applicant may appeal any decision of the director or the commission. Such appeal shall be made to the Lumpkin County governing authority within 30 days of the decision being appealed.

(Res. No. 2011-04, exh. A, § 13, 1-18-2011) Sec. 51-14. Actions by aggrieved parties.

Any person, company, agency, firm, corporation or other entity who is aggrieved by any violation of these regulations not lawfully waived by the director, the commission, the governing authority or other authorized agency may file and maintain any equitable or legal action against the applicant, owner or operator of a telecommunications facility in order to correct the violation, abate the violation or receive damages caused by the violation. Neither this provision nor any other provision of these regulations shall be construed as authority to maintain any action against Lumpkin County, the Lumpkin County Planning Department or the Lumpkin County Planning Commission, nor as a waiver of any sovereign or governmental immunity.

(Res. No. 2011-04, exh. A, § 14, 1-18-2011) Sec. 51-15. Penalties for violations.

Any person, company, agency, firm, corporation or other entity who erects, attempts to erect, or maintains a telecommunications facility without having first obtained the necessary building permit in violation of any provision of these regulations, or who otherwise violates, neglects or refuses to comply with any of the provisions of these regulations, shall be guilty of a misdemeanor amendable to the Magistrate Court of Lumpkin County and, upon conviction, may be punished by a fine of up to $1,000.00 and by incarceration for up to 60 days for each offense, or both fined and incarcerated as determined by the Magistrate Court of Lumpkin County. Each day such violation exists shall constitute a separate offense.

Violations of these regulations shall constitute violations of Lumpkin County ordinance.

Such violations may be tried upon citations with or without a prosecuting attorney as well as upon accusations. The director or his designee shall be authorized to issue citations for violations of these regulations.

(Res. No. 2011-04, exh. A, § 15, 1-18-2011) Chapter 52

TRAFFIC AND VEHICLES*

ARTICLE I. IN GENERAL

Secs. 52-1—52-22. Reserved.

ARTICLE II. RULES OF THE ROAD

DIVISION 1. GENERALLY

Sec. 52-23. Adoption of state law.

Pursuant to O.C.G.A. §§ 40-6-372 through 40-6-376, O.C.G.A. §§ 40-6-2 through 40-6-395, known as the uniform rules of the road, and the definitions contained in O.C.G.A. § 40-1-1 are hereby adopted as and for the traffic regulations of the county with like effect as if recited in this section.

Sec. 52-24. Temporary traffic regulations.

In cases where traffic upon the roads of the county may become congested upon occasions of parades, at theaters and other public assemblages where large numbers of vehicles are assembled, the sheriff may make temporary rules directing and regulating the traffic in these congested districts, and any person, who, after being warned of the temporary traffic regulations, shall violate them, shall be liable therefore as for other violations of this Code.

Secs. 52-25—52-51. Reserved.

DIVISION 2. OFF-ROAD VEHICLES*

Sec. 52-52. Definitions.

The following words, terms and phrases, when used in this division, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning:

Off-road vehicle.

(1) The term "off-road vehicle" means any motorized vehicle designed for or capable of cross-country travel on or immediately over land, water, snow, ice, marsh, swampland or other natural terrain and not intended for use predominantly on public roads.

(2) The term "off-road vehicle" includes, but is not limited to, four-wheel-drive or low-pressure-tire vehicles, two-wheel vehicles (including trail bikes and minibikes), amphibious machines, ground effect or air-cushion vehicles, and any other means of transportation deriving power from any source other than muscle or wind.

(3) The term "off-road vehicle" does not include any motorboats; any military, fire or law enforcement vehicle; any vehicles used exclusively on airports; all farm machinery, farm tractors, and other self-propelled equipment for harvesting and transportation of forest products, for clearing land for planting, for utility service and maintenance, for earth moving, construction or mining; and self-propelled lawnmowers, snow blowers, garden or lawn tractors, or golf carts while such vehicles are being used exclusively for their designed purposes.

Sec. 52-53. Applicability.

This division shall be considered as cumulative to any and all other laws, rules and regulations regarding the subject matter; however, if this division is in conflict with existing rules, regulations and resolutions, then where it is in conflict this division shall prevail and be considered governing.

Secs. 52-54—52-81. Reserved.

ARTICLE III. SPEED ZONES*

Sec. 52-82. Maximum speed.

(a) The county has established speed limits on certain county roads set forth in the schedule of speed limits set forth in section 52-84.

(b) No person shall drive a vehicle on a road or highway at a speed greater than is reasonable and prudent under the existing conditions and with due regard for the actual and potential hazards that exist. In every event speed shall be so controlled as may be necessary to avoid colliding with any person, vehicle or other conveyance on or entering the road, highway or other avenues of travel, in compliance with legal requirements and the duty of all persons to use due care and caution.

(c) Where no speed hazards exist that require lower speed for compliance with subsection

(a) of this section, the speed of any vehicle not less than the minimum limits or not in excess of the maximum limits established by the county, shall be lawful.

Sec. 52-83. Speed detection device authorized.

The law enforcement officers of the county are authorized to use speed detection devices as permitted by O.C.G.A. § 40-14-2.

Sec. 52-84. Schedule of speed limits.

The Lumpkin County Commissioner is hereby requesting that the following roadways be approved for the use of speed detection devices:

LIST OF ROADWAYS for LUMPKIN COUNTY

ON-SYSTEM

STATE

ROUTE

WITHIN THE CITY/

TOWN LIMITS OF

and/or School Name FROM

MILE

POINT TO MILE POINT LENGTH IN MILES

SPEED

LIMIT

SR 9 Dawson County Line 00.00 Pink Williams Road 03.41 03.41 55 SR 9 Pink Williams Road 03.41 617' north of Torrington Road (South Dahlonega City Limits)

09.42 06.01 45 SR 9 DAHLONEGA 617' north of Torrington Road (South Dahlonega City Limits)

09.42 245' south of Calhoun Road

10.85 01.43 45 SR 9 DAHLONEGA 245' south of Calhoun Road

10.85 134' north of Riley Road

11.48 00.63 35 SR 9 DAHLONEGA 134' north of Riley Road

11.48 1195' south of Wimpy Mill Road (North Dahlonega City Limits)

12.61 01.13 45 SR 9 1195' south of Wimpy Mill Road (North Dahlonega City Limits)

12.61 State Route 11 24.50 11.89 45 SR 11 White County Line 00.00 State Route 9 01.91 01.91 55 SR 11 State Route 9 01.91 1320' south of Union County Line

09.36 07.45 45 SR 11 1320' south of Union County Line

09.36 Union County Line 09.60 00.24 35 SR 52 Dawson County Line 00.00 State Route 9 09.56 09.56 55 SR 52 State Route 52 runs common with State Route 9 from Mile Post 09.56 to 14.92 for a distance of 5.36 miles SR 52 DAHLONEGA State Route 9 14.92 924' east of State

Route 9

15.12 00.20 35

STATE

ROUTE

WITHIN THE CITY/

TOWN LIMITS OF

and/or School Name FROM

MILE

POINT TO MILE POINT LENGTH IN MILES

SPEED

LIMIT

SR 52 DAHLONEGA 924' east of State Route 9

15.12 930' east of State Route 9 (East Dahlonega City Limits)

15.13 00.01 45 SR 52 930' east of State Route 9 (East Dahlonega City Limits)

15.13 197' east of State Route 115

19.61 04.48 45 SR 52 ***

SCHOOL

ZONE

*** Long Branch Elementary School

SCHOOL DAYS ONLY

68' west of Westbrook Road

19.24 55' west of State Route 115

19.60 00.36 35 SR 52 197' east of State Route 115

19.61 Hall County Line 24.75 05.14 55 SR 60 Hall County Line 00.00 127' east of Calhoun Mine Road (West Dahlonega City Limits)

04.59 04.59 55 SR 60 DAHLONEGA 127' east of Calhoun Mine Road (West Dahlonega City Limits)

04.59 881' west of Bear Paw Ridge

05.32 00.73 55 SR 60 DAHLONEGA 881' west of Bear Paw Ridge

05.32 Crown Mountain Drive 07.04 01.72 45 SR 60 DAHLONEGA Crown Mountain Drive 07.04 1584' south of State Route 9

07.46 00.42 40 SR 60 DAHLONEGA 1584' south of State Route 9

07.46 State Route 9 07.73 00.27 35 SR 60 This section of SR 60 runs common with SR 9 from Mile Post 7.73 to Mile Post 15.73 for a distance of 08.00 SR 60 State Route 9 15.73 Union County 21.09 05.36 35

SR 60 Bus DAHLONEGA State Route 9/52/60 00.00 90' east of Hill Street 00.41 00.41 35 SR 60 Bus DAHLONEGA 90' east of Hill Street 00.41 Woodward Way 00.79 00.38 25 SR 60 Bus DAHLONEGA Woodward Way 00.79 1162' east of Kenimer

Circle

01.72 00.93 35 SR 60 Bus ***

SCHOOL

ZONE

***

DAHLONEGA

Lumpkin County Elementary and Middle School

SCHOOL DAYS ONLY

208' west of Mountain View Drive

01.09 61' west of Kenimer Circle

01.51 00.42 25

STATE

ROUTE

WITHIN THE CITY/

TOWN LIMITS OF

and/or School Name FROM

MILE

POINT TO MILE POINT LENGTH IN MILES

SPEED

LIMIT

SR 60 Bus DAHLONEGA 1162' east of Kenimer Circle

01.72 417' east of Clyde Barrett Road (East Dahlonega City Limits) 02.48 00.76 45 SR 60 Bus

***

SCHOOL

ZONE

***

DAHLONEGA

Lumpkin County High School

SCHOOL DAYS ONLY

340' east of Oak Grove Road

02.07 330' east of Clyde Barrett Road 02.47 00.40 35 SR 60 Bus 417' east of Clyde Barrett Road (East Dahlonega City Limits) 02.48 State Route 9/60 04.72 02.24 45 SR 115 State Route 60 00.00 State Route 52 04.76 04.76 55

SR 115 State Route 115 runs Common with State Route 52 from Mile Post 04.76 to 06.81 for distance of 2.05 Miles

SR 115 State Route 52 06.81 White County Line 09.74 02.93 55 SR 400 Dawson County Line 49.88 1585' west of Chesterra Drive 52.55 02.67 65 SR 400 1585' west of

Chesterra Drive

52.55 State Route 60 53.55 01.00 55

OFF-SYSTEM

ROAD NAME

WITHIN THE

CITY/TOWN

LIMITS OF and/or School Name FROM TO

LENGTH

IN

MILES

SPEED

LIMIT

Auraria Road State Route 9/52 Dawson County Line 08.20 50 Auraria Road ***

SCHOOL ZONE

**k Blackburn Elementary School

SCHOOL DAYS

ONLY

710' south of Blackbum Road 980' north of Blackbum Road 00.32 40 Ben Higgins Road State Route 9 Auraria Road 03.40 40 Black Mountain Road Camp Wahsega Road Pat Gooch Road 06.10 45 Burnt Stand Road State Route 400 Auraria Road 02.59 50 Camp Wahsega Road State Route 9 Bus 00.50 Mi. west, of State Route 9 Bus.

00.50 40 Camp Wahsega Road 00.50 Mi. west of State Route 9 Bus.

800' east of Miles Berry Road 04.70 50 Camp Wahsega Road 800' E. of Miles Berry Road Camp Merrill Entrance 03.25 40 Castleberry

Bridge Road Auraria Road State Route 9 04.02 50 Cavender Creek Road Morrison Moore Pkwy 1500' west of Chestatee River Bridge

05.23 45 Cavender Creek Road 1500' west of Chestatee River Bridge Chestatee River Bridge 00.29 35 Claude Parks Road State Route 52 Hall County Line 02.01 50 Copper Mine Road Cavender Creek Road Long Branch Road Extension 01..50 40 Damascus

Church Road State Route 9 White County Line 03.21 50 Frogtown Road Town Creek Church Road Damascus Church Road 03.23 50

ROAD NAME

WITHIN THE

CITY/TOWN

LIMITS OF and/or School Name FROM TO

LENGTH

IN

MILES

SPEED

LIMIT

Hightower Road Oak Grove/Siloam Road Intersection End of Pavement 01.80 ' 35 Long Branch Road State Route 52 North of Pecks Creek Ct. at MP 0.95

00.95 50 Long Branch Road North of Pecks Creek Ct. at MP 0.95 Copper Mine Road 02.02 40 Lumpkin County Parkway North Int. SR 400 South Int. SR 400 1.82 45 Main Street West State Route 9/52 State Route 9 Bus 00.69 25 Nimblewill Church Road East Int. SR 52 West Int. SR 52 3.58 45 Oak Grove Road State Route 9/60 End of Road 04.00 45 Old Dahlonega Hwy State Route 115 Hall County Line 04.41 45 Pony Lake Road Hall County Line State Route 60 00.76 50 Pony Lake Road Old Dahlonega Hwy Hall County Line 01.47 50 Porter Springs Road State Route 9 Cavender Creek Road 05.95 45 Red Oak Flats Road SR 60 Old Dahlonega Highway 3.24 45 Rockhouse Road State Route 52 Cavender Creek Road 02.20 40 South Chestatee Road West Main Street State Route 9/52 00.49 25 Siloam Road State Route 9 End of Road 02.90 40 Town Creek Church Road Cavender Creek Road White County line 3.59 45 Whelchel Road Auraria Road State Route 400 00.86 40 Radar not allowed from Pleasant Hill Church Road to Camp Merrill entrance due to excessive changes in grades.

ROAD NAME

WITHIN THE

CITY/TOWN

LIMITS OF and/or School Name FROM TO

LENGTH

IN

MILES

SPEED

LIMIT

Yahoola Church Road Pat Gooch Road State Route 9 03.45 50

***SCHOOL ZONE HOURS ARE EFFECTIVE***

A.M. from 45 minutes prior to commencement time to 15 minutes after commencement time — SCHOOL DAYS ONLY P.M. from 15 minutes prior to dismissal time to 45 minutes after dismissal time — SCHOOL DAYS ONLY (Res. No. 2008-42, 9-25-2008; Res. 2009-25, 3-19-2009; Res. No. 2012-37, exh. A, 7-17-2012; Res. No. 2017-88, 12-19-2017; Res.

No. 2019-48, Exh. A, 8-20-2019; Res. No. 2025-43, 7-15-2025) Sec. 52-85. School zone hours enumerated.

For purposes of speed limits, "school zone hours" apply only on days in which school is in session, twice daily, for the following one-hour time periods:

(1) In the morning: Beginning 45 minutes prior to the time school begins and continuing until 15 minutes after school begins.

(2) In the afternoon: Beginning 15 minutes before school is dismissed and continuing 45 minutes after dismissal.

(Res. No. 2008-42, 9-25-2008; Res. 2009-25, 3-19-2009) Secs. 52-86—52-113. Reserved.

ARTICLE IV. PARKING, STOPPING AND STANDING*

Sec. 52-114. Prohibited parking of oversize vehicles.

It shall be unlawful for any person to park a truck tractor, bus, trailer, or semitrailer, except to load or unload, on the right-of-way of any road, throughway or other avenue of travel in the county.

Sec. 52-115. Sale of vehicles on rights-of-way prohibited.

(a) It shall be unlawful to park or leave unattended on or within the right-of-way of any public road in the unincorporated areas of the county any used motor vehicle that is marked for sale or otherwise displayed for sale. A vehicle shall be considered to be displayed for sale when a reasonable person would perceive that the vehicle is for sale without having to inquire whether the vehicle is for sale.

(b) The law enforcement officials of the county are authorized and empowered to impound any vehicle found to be in violation of this section. The owner of such vehicle shall be responsible for all expenses and charges incurred in the towing and storage of the vehicle.

Chapter 53

RESERVED

Chapter 54

UTILITIES*

ARTICLE I. IN GENERAL

Secs. 54-1—54-18. Reserved.

ARTICLE II. WATER

DIVISION 1. OUTDOOR LANDSCAPE WATERING POLICY*

Sec. 54-19. Restriction on outdoor watering of landscape.

Outdoor watering for purposes of planting, growing, managing, or maintaining ground cover, trees, shrubs, or other plants in the unincorporated area may occur only between the hours of 4:00 p.m. and 10:00. a.m.; provided, however, that this limitation shall not create any limitation upon the following outdoor water uses:

(1) Commercial raising, harvesting, or storing of crops; feeding, breeding, or managing livestock or poultry; the commercial production or storing of feed for use in the production of livestock, including, but not limited to, cattle, calves, swine, hogs, goats, sheep, and rabbits, or for use in the production of poultry, including, but not limited to, chickens, hens, ratites, and turkeys; producing plants, trees, fowl, or animals; or the commercial production of aquacultural, horticultural, dairy, livestock, poultry, eggs, and apiarian products or as otherwise defined in

O.C.G.A. § 1-3-3;

(2) Capture and reuse of cooling system condensate or storm water in compliance with applicable ordinances and state guidelines;

(3) Reuse of gray water in compliance with O.C.G.A. § 31-3-5.2 and applicable local board of health regulations;

(4) Use of reclaimed waste water by a designated user from a system permitted by the Environmental Protection Division of the Georgia Department of Natural Resources to provide reclaimed waste water;

(5) Watering personal food gardens;

(6) Watering new and replanted plant, seed, or turf in landscapes, golf courses, or sports turf fields during installation and for a period of 30 days immediately following the date of installation;

(7) Drip irrigation or irrigation using soaker hoses;

(8) Hand watering with a hose with automatic cutoff or handheld container;

(9) Use of water withdrawn from private water wells or surface water by an owner or operator of property if such well or surface water is on said property;

(10) Watering horticultural crops held for sale, resale, or installation;

(11) Watering athletic fields, golf courses, or public turf grass recreational areas;

(12) Installation, maintenance, or calibration of irrigation systems; or

(13) Hydroseeding.

(Res. No. 2010-70, § 1, 12-16-2010) Sec. 54-20. Enforcement.

(a) No person shall use or allow the use of water in violation of the restrictions on outdoor water use contained in this division.

(b) The Lumpkin County Code Enforcement Officer shall be the enforcement authority for this division. The county manager may also authorize other departments, as may be deemed necessary, to support enforcement.

(c) Criminal and alternative penalties. Any violation of this section may also be enforced by a citation or accusation returnable to the magistrate court or by any other legal means as set forth in this Code.

(Res. No. 2010-70, § 2, 12-16-2010) Secs. 54-21—54-25. Reserved.

DIVISION 2. WELLHEAD PROTECTION*

Sec. 54-26. Purpose.

This division shall be known as the Wellhead Protection Ordinance.

The purpose of this division is to insure the provision of a safe and sanitary drinking water supply for Lumpkin County by the establishment of wellhead protection zones surrounding the wellheads for all wells and springs which are the supply sources for the Lumpkin County Water and Sewerage Authority water system, and by the designation and regulation of property uses and conditions which may be maintained within such zones.

(Res. No. 2010-71, 12-16-2010) Sec. 54-27. Definitions.

When used in this division, the following words and phrases shall have the meaning given in this section:

(1) Hazardous waste or material means any waste or material which because of its quantity, concentrated or physical, chemical or infectious characteristics may:

a. Cause or significantly contribute to an increase in mortality or an increase in serious irreversible or incapacitation reversible illness; or

b. Pose a substantial present or potential hazard to human health or to the environment when improperly treated, stored, transported, disposed of or otherwise managed.

(2) Sanitary landfills means a disposal site where solid wastes, including putrescible wastes, or hazardous wastes, are disposed of on land by placing earth cover thereon.

(3) Wellhead means the upper terminal of a well or spring, including adapters, ports, seals, valves and other attachments.

(Res. No. 2010-71, § 1, 12-16-2010) Sec. 54-28. Establishment of a wellhead protection zone.

There is hereby established a use district to be known as a wellhead protection zone, identified and described as all the area within a zone, within of which is the center of any LCWSA water supply wellhead. In a situation where the wellhead protection zone extends into the jurisdiction of another government entity, the governing authority of Lumpkin County will request that government to respect the protective features of this division. The area will consist of two zones identified as follows:

(1) The control zone. Within this zone, the Lumpkin County Water and Sewerage Authority shall control all activities so that there are minimal sources of potential pollution in the immediate vicinity of the wellhead. The control zone is all that area within a circle, the center of said wellhead and the radius of which is 157 feet.

(2) The management zone. Within this zone, certain potential pollution sources are prohibited and certain activities must be performed in accordance with the State of Georgia "Rules for Safe Drinking Water, Section 391-3-5.40 Wellhead Protection." The management zone may include inner- and outer-management zones, and contains the control zone and the wellhead as identified in the approved Georgia Wellhead Protection Plan for the Lumpkin County Water and Sewerage Authority.

(Res. No. 2010-71, § 2, 12-16-2010) Sec. 54-29. Prohibited uses.

The following uses or conditions shall be and are hereby prohibited within wellhead protection zones, whether or not such use or condition may otherwise be ordinarily included as a part of a use permitted under this section:

(1) Any new septic tanks or drain fields appurtenant thereto may not be less than 100 feet from the wellhead;

(2) Sanitary landfills;

(3) Hazardous waste disposal sites;

(4) Any new storm water infiltration basins within 250 feet of the wellhead;

(5) Any new underground storage tanks within 250 feet of the wellhead; and

(6) Any new sanitary sewer lines within the control zone of a wellhead.

(Res. No. 2010-71, § 3, 12-16-2010) Sec. 54-30. Administration.

The policies and procedures for administration of any wellhead protection zone established under this division, including without limitation those applicable to non-conforming uses, exceptions, enforcement and penalties, shall be the same as provided in the existing zoning ordinance for the Lumpkin County Water and Sewerage Authority, as the same is presently enacted or may from time to time be amended.

(Res. No. 2010-71, § 4, 12-16-2010) Secs. 54-31—54-39. Reserved.

ARTICLE III. SEWER

DIVISION 1. GENERALLY

Sec. 54-40. Definitions.

The following words, terms and phrases, when used in this division, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning:

Act or the Act means the Federal Water Pollution Control Act, also known as the Clean Water Act, as amended, 33 USC 1251 et seq.

Ammonia (NH3) means a colorless gaseous alkaline compound of nitrogen and hydrogen that is very soluble in water.

Approval authority means the director of the state environmental protection division.

Authority means the county water and sewerage authority, sometimes referred to herein as "the authority," the "WSA" and also as "the Water and Sewerage Authority."

Authority's wastewater system. See Wastewater system.

Authorized representative of the user means:

(1) If the user is a corporation:

a. The president, secretary, treasurer, or a vice-president of the corporation in charge of a principal business function, or any other person who performs similar policy or decision-making functions for the corporation; or

b. The manager of one or more manufacturing, production, or operation facilities, if authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures.

(2) If the user is a partnership or sole proprietorship: a general partner or proprietor, respectively.

(3) If the user is a federal, state, or local governmental facility: a director or highest official authorized to oversee the operation and performance of the activities of the government facility.

(4) The individuals described in subsections (1) through (3) of this definition may designate another authorized representative if the authorization is in writing, the authorization specifies the individual or position responsible for the overall operation of the facility from which the discharge originates or having overall responsibility for environmental matters for the company, and the written authorization is submitted to the authority.

Biochemical oxygen demand (BOD) means the quantity of oxygen utilized in the biochemical oxidation of organic matter under standard laboratory procedure in five days at 20 degrees Celsius, expressed in milligrams per liter.

Building drain means that part of the piping of a building, which collects wastewater inside the walls of the building and conveys it to outside the building wall.

Building sewer means the extension from the building drain to the public sewer or other point of acceptance also called house connection. Proper maintenance of this service line is the owner's responsibility from the building drain to the point of acceptance. At this point, the service line or lateral becomes the authority's responsibility as it continues from this point to the sanitary sewer trunk line.

City means the City of Dahlonega, Georgia.

Composite sample means the make-up of a number of individual samples, collected during a 24-hour period, in which the portions of the sample are proportionate to the flow to represent the nature of sewage or industrial wastes.

Constituents means the combination of particles, chemicals, or conditions which exist in wastewater.

Contribute means the addition, discharge, or introduction of any substance into the authority's wastewater system as that term is hereinafter defined.

Cooling water means the water discharged from any use such as air conditioning, cooling or refrigeration, or to which the only pollutant added is heat.

County means the County of Lumpkin, Georgia.

Customer means every person, firm, association, corporation, government agency, or similar organization who is responsible for contracting (expressly or implicitly) with the authority in obtaining, having or using water or wastewater connections with, or sewer taps to, the authority's wastewater system and in obtaining, having or using water or other related services furnished by the authority for the purpose of disposing of wastewater through said system. The term "customer" also includes illicit and unauthorized users of the water or wastewater systems.

Direct discharge means the discharge of treated or untreated wastewater directly into the waters of the state.

Director means the person designated by the authority as the director of the authority.

Whenever the director is referred to in this article, it shall mean the director or his designee.

Domestic sewage means that wastewater discharged into the authority's wastewater system from domestic sources such as toilets, washing machines, dishwashers, sinks, showers, and bathtubs from normal household usage.

Effluent means the discharge flow of a treatment facility.

Environmental protection agency or EPA means the U.S. Environmental Protection Agency, or where appropriate the term may also be used as a designation for the administrator or other duly authorized official of said agency.

Existing source means any source of discharge, the construction or operation of which commenced prior to the publication by EPA of proposed categorical pretreatment standards, which will be applicable to such source if the standard is thereafter promulgated in accordance with section 307 of the Act.

Federal categorical pretreatment standard or federal pretreatment standard means any regulation containing pollutant discharge limits promulgated by the EPA in accordance with section 307(b) and (c) of the Act (33 USC 1317(b), (c)) which applies to a specific category of nondomestic users. Categorical standards appear in 40 CFR 405—471.

Floatable oil and grease means oil, fat or grease in a physical state such that it will separate by flotation from wastewater by treatment in an approved pretreatment facility or sand and oil/grease interceptor.

Flush toilet means the common sanitary flush commode in general use for the disposal of human excrement.

Garbage means the solid wastes from the domestic and enclosed preparation, cooking, and dispensing of food, and from the handling, storage and sale of produce.

General permit means a sanitary sewer discharge permit required to be issued by the authority for all nondomestic users, who are not significant industrial users, prior to approval for the user to connect to the authority's wastewater system.

Grab sample means a sample, which is taken from a wastestream without regard to the flow in the wastestream and over a period of time not to exceed 15 minutes.

Grit means matter consisting of sand, gravel, cinders or other heavy solid materials that has settling velocities or specific gravities greater than those of organic putrescible solids normally encountered in domestic wastewater.

Health department means the county board of health.

High strength wastewater means wastewater, which contains quantities of specified constituents that exceed the quantities normally encountered in domestic wastewater.

Holding tank waste means any waste from holding tanks such as vessels, chemical toilets, campers, trailers, septic tanks, and vacuum-pump tank trucks.

House connection. See Building sewer.

Indirect discharge or discharge means the introduction of pollutants into the authority's wastewater system from any nondomestic source regulated under section 307(b), (c), or (d) of the Act (including holding tank waste discharged into the system).

Industrial user or contributor means a source of indirect discharge which does not constitute a discharge of pollutants under regulations issued pursuant to section 402 of the Act.

Industrial wastes means the liquid waste from industrial manufacturing processes, trade, or other business as distinct from normal domestic sewage.

Infiltration/inflow means groundwater and surface water which leaks into the wastewater system through cracked pipes, joints, manholes or other openings.

Inflow means water that flows into the wastewater system from the surface, streams, roof drains, down spouts or other such source.

Influent means the wastewaters arriving at a treatment plant.

Instantaneous maximum allowable discharge limit means the maximum concentration of a pollutant allowed to be discharged at any time, determined from the analysis of any discrete or composite sample collected, independent of the industrial flow rate and the duration of the sampling event.

Interference means a discharge, which alone or in conjunction with a discharge from other sources, inhibits or disrupts the authority's wastewater system, its treatment processes or operations or its sludge processes, use or disposal such that the discharge contributes to:

(1) A violation of any requirement of any applicable NPDES permit, any applicable land application system ("LAS") permit, or any other applicable permit;

(2) The prevention of sewage sludge use or disposal in compliance with any of the statutory or regulatory provisions or permits; or

(3) A violation of any other federal, state, or local law, rule, or regulation. This shall expressly include any discharge that results in an increase in the magnitude or duration of a violation.

Main means the pipe, conduit, or facility, which conveys utility service to individual services or to other mains.

May is permissive.

Medical waste means isolation wastes, infectious agents, human blood and blood products, pathological wastes, sharps, body parts, contaminated bedding, surgical wastes, potentially contaminated laboratory wastes, and dialysis wastes.

Meter means any device used to measure service rendered to a customer by the authority.

Metered water means the amount of all sources of water, including wells, consumed by the sewer customer.

National pollution discharge elimination system or NPDES permit means a permit issued pursuant to section 402 of the Act (33 USC 1342).

Natural outlet means any outlet, including storm sewers, watercourses, ponds, ditches, lakes or other bodies of surface water or groundwater.

New source means:

(1) Any building, structure, facility, or installation from which there is (or may be) a discharge of pollutants, the construction of which commenced after the publication of proposed pretreatment standards under section 307(c) of the Act which will be applicable to such source if such standards are thereafter promulgated in accordance with that section, provided that:

a. The building, structure, facility, or installation is constructed at a site at which no other source is located;

b. The building, structure, facility, or installation totally replaces the process or production equipment that causes the discharge of pollutants at an existing source; or

c. The production or wastewater generating processes of the building, structure, facility, or installation are substantially independent of an existing source at the same site. In determining whether these are substantially independent factors, such as, the extent to which the new facility is integrated with the existing plant, and the extent to which the new facility is engaged in the same general type of activity as the existing source, should be considered.

(2) Construction on a site at which an existing source is located results in a modification rather than a new source if the construction does not create a new building, structure, facility, or installation meeting the criteria of subsection (1)b or (1)c of this definition but otherwise alters, replaces, or adds to existing process or production equipment.

(3) Construction of a new source as defined under this subsection has commenced if the owner or operator has:

a. Begun, or caused to begin, as part of a continuous onsite construction program:

1. Any placement, assembly, or installation of facilities or equipment;

2. Significant site preparation work including clearing, excavation, or removal of existing buildings, structures, or facilities which is necessary for the placement, assembly, or installation of new source facilities or equipment; or

b. Entered into a binding contractual obligation for the purchase of facilities or equipment, which are intended to be used in its operation within a

reasonable time. Options to purchase or contracts which can be terminated or modified without substantial loss, and contracts for feasibility, engineering, and design studies do not constitute a contractual obligation under this subsection.

Noncontact cooling water means water used for cooling, which does not come into direct contact with any raw material, intermediate product, waste product, or finished product.

Nondomestic user means any user of the authority's wastewater system who discharges wastewater into the wastewater system from a structure other than a residence.

Nondomestic wastewater means the wastewater generated from nondomestic users as distinct from domestic sewer.

Ordinance means this sewer use article, as amended, including any future codification thereof by the water and sewerage authority and the board of commissioners.

Pass through means a discharge which exits the authority's wastewater system into waters of the United States in quantities or concentrations which, alone or in conjunction with a discharge or discharges from other sources, such that a discharge contributes to:

(1) A violation of any requirement of any applicable NPDES permit, any applicable LAS permit, or any other applicable permit;

(2) The prevention of sewage sludge use or disposal in compliance with any of the statutory or regulatory provisions or permits; or

(3) A violation of any other federal, state, or local law, rule, or regulation. This shall expressly include any discharge that results in an increase in the magnitude or duration of a violation.

Person means any individual, partnership, firm, company, corporation, association, joint stock company, trust, estate, governmental entity, or any other legal entity; or their legal representatives, agents, or assigns. This definition includes all federal, state, and local governmental entities.

pH means the logarithm (base 10) of the reciprocal of the molar concentration of hydrogen ions, in solution.

Phosphorus (P) means an element that appears in wastewater in different forms and serves as an essential element for biological growth.

Pit privy means shored, vertical pit in the earth used for the disposal of human or animal wastes.

Point of acceptance means for sewer systems, the point of acceptance is the point at which the authority's piping connects with the customer's piping. Point of acceptance is commonly called the "tap."

Pollutant means dredged spoil, solid waste, incinerator residue, filter backwash, sewage, garbage, sewage sludge, munitions, medical wastes, chemical wastes, biological material, radioactive materials, heat, wrecked or discarded equipment, rock, sand, cellar dirt, municipal, agricultural and industrial wastes, and certain characteristics of wastewater (e.g., pH, temperature, TSS, turbidity, color, BOD, COD, toxicity, or odor).

Pollution means the manmade or man-induced detrimental alteration of the chemical, physical biological, and radiological integrity of water or soil, or the products, which create or cause such alteration.

Pretreatment or treatment means the reduction of the amount of pollutants, the elimination of pollutants, or the alteration of the nature of pollutant properties in wastewater to a less harmful state prior to or in lieu of discharging or otherwise introducing such pollutants into the wastewater treatment system. The reduction or alteration can be obtained by physical, chemical or biological processes, or by process changes or other means, except as prohibited by 40 CFR 403.6(d).

Pretreatment requirements means any substantive or procedural requirement related to pretreatment, other than a federal pretreatment standard imposed on a nondomestic user.

Pretreatment standards or standards means prohibited discharge standards, federal categorical pretreatment standards, and local limits.

Prohibited discharge standards or prohibited discharges means any constituent identified in a federal categorical pretreatment standard or any item identified as a prohibited discharge in division 2 of this article.

Properly shredded garbage means the wastes from the preparation, cooking and dispensing of food that has been shredded to such a degree that all particles will be carried freely under the flow conditions normally prevailing in public sewers, with no particle greater than one-half inch in any dimension.

Public sewer means a common sewer controlled by a governmental agency or public utility;

in this case, the water and sewerage authority and/or the county.

Receiving waters means those waters into which wastes or effluents are discharged.

Sanitary sewer or sewer means a sewer that carries liquid and water-carried wastes from residences, commercial buildings, industrial plants, and institutions, together with such stormwaters, surface waters and groundwaters as may be present, but not intentionally admitted.

Septic tank means a subsurface impervious tank designed to temporarily retain sewage or similar waterborne wastes together with:

(1) A sewer line constructed with solid pipe, with the joints sealed, connecting the impervious tank with a plumbing stub out; and

(2) A subsurface system of trenches, piping and other materials constructed to drain the clarified discharge from the tank and distribute it underground to be absorbed or filtered.

Service connection means the point of connection of the customer's piping with the meter or service pipe owned by the authority.

Service lateral means the pipe between the utility's mains and the point of delivery and shall include all of the pipe, fittings, and valves necessary to make the connection excluding the meter.

Sewage means a combination of the water-carried wastes from residences, businesses, institutions, and industrial establishments, together with such groundwaters, surface waters and stormwaters as may be present, but not intentionally admitted.

Sewer means a pipe or conduit that carries wastewater.

Shall is mandatory.

Significant industrial user means:

(1) A user subject to federal categorical pretreatment standards;

(2) A user that:

a. Discharges an average of 25,000 gpd or more of process wastewater to the authority's wastewater system (excluding sanitary wastewater);

b. Contributes a process wastestream which makes up five percent or more of the average dry weather hydraulic or organic capacity of a treatment plant;

c. Is designated as such by the authority on the basis that it has a reasonable potential for adversely affecting the operation of the authority's wastewater system or for violating any pretreatment standard or requirement; or

(3) Upon a finding that a user meeting the criteria in subsection (2) of this definition has no reasonable potential for adversely affecting the authority's wastewater system operation or for violating any pretreatment standard or requirement, the authority may at any time, on its own initiative or in response to a petition received from a user, and in accordance with procedures in 40 CFR 403.8(f)(6), determine that such user should not be considered a significant industrial user.

Significant industrial user permit means a sanitary sewer discharge permit required to be issued by the authority for all significant industrial users prior to approval for the user to connect to the authority's wastewater system.

Significant noncompliance means:

(1) Chronic violations of wastewater discharge limits, defined here as 66 percent or more of wastewater measurements taken during a six-month period exceed the daily maximum limit or average limit for the same pollutant parameter by any amount;

(2) Technical review criteria (TRC) violations, defined here as those in which 33 percent or more of wastewater measurements taken for each pollutant parameter during a six-month period equals or exceeds the product of the daily maximum limit or the average limit multiplied by the applicable criteria (1.4 for BOD, TSS, fats, oils and grease, and 1.2 for all other pollutants except pH);

(3) Any other discharge violation the director believes has caused, alone or in combination with other discharges, interference or pass through, including endangering the health of the authority's wastewater system or that of the personnel or general public;

(4) Any discharge of pollutants that has caused imminent endangerment to the public or to the environment, or has resulted in the director's exercise of its emergency authority to halt or prevent such a discharge;

(5) Failure to meet, within 90 days of the scheduled date, a compliance schedule milestone contained in a wastewater discharge permit or enforcement order for starting construction, completing construction, or attaining final compliance;

(6) Failure to provide within 30 days after the due date, any required reports, including baseline monitoring reports, reports on compliance with federal categorical pretreatment standard deadlines, periodic self-monitoring reports, and reports on compliance with compliance schedules;

(7) Failure to accurately report noncompliance; or

(8) Any other violation that the director determines will adversely affect the operation or implementation of the local pretreatment program or the authority's wastewater system.

Slug load or slug means any discharge at a flow rate or concentration, which could cause a violation of the prohibited discharge standards in this article.

Standard industrial classification (SIC) means a classification pursuant to the standard industrial classification manual issued by the Executive Office of the President, Office of Management And Budget, 1987, as amended.

Standard methods means those sampling and analysis procedures or methods established by and in accordance with EPA pursuant to section 304(g) of the Act and contained in 40 CFR 136, as amended, or the latest edition of the "standard methods for the examination of water and wastewater" as prepared, approved, and published jointly by the American Public Health Association, the American Water Works Association, and the Water Environment Federation, a copy of which is on file in the office of the director. In cases where procedures vary, the EPA methodologies shall supersede.

State means the State of Georgia.

Storm drain (sometimes termed storm sewer) means a drain or sewer for conveying surface water, groundwater, subsurface water, or unpolluted water from any source, but excludes sewage and industrial wastes, other than heat polluted cooling water.

Stormwater means any flow occurring during or following any form of natural precipitation and resulting therefrom.

Surcharge means the payment made by a nondomestic user for the discharge of any wastewater or pollutants into the authority's wastewater system in excess of typical wastewater streams from domestic wastewater sources. The total wastewater user charge shall then be the normal wastewater user charge as defined in this section plus, the surcharge.

Suspended solids or total suspended solids (TSS) means total suspended matter that either floats on the surface of, or is in suspension in, water, wastewater, or other liquids, and that is removable by laboratory filtering as prescribed in standard methods for the examination of water and wastewater and referred to as nonfilterable residue.

Toxic pollutant means any pollutant or combination of pollutants listed as toxic in regulations promulgated by the administrator of EPA under the provisions of section 307(a) of the Act or other acts.

Treatment plant means that portion of the authority's wastewater system designed to provide treatment to wastewater (also termed a water reclamation facility).

Treatment works means a treatment works as defined by section 212 of the Act (33 USC 1292), which may be owned by a private entity (any nongovernmental entity) or by a governmental entity.

Unpolluted water means water of quality equal to or better than the effluent criteria in effect or water that would not cause violation of receiving water quality standards and would not be benefited by discharge to the sanitary sewers and wastewater treatment facilities.

User means any person who contributes, causes or permits the discharge of wastewater into the authority's wastewater system.

Wastewater means any solid, liquid, gas, or radiological substance water-carried from residential dwellings, commercial buildings, industrial and manufacturing facilities, and institutions whether treated or untreated, which are contributed to the authority's wastewater system.

Wastewater system or authority's wastewater system means the wastewater collection, treatment, and disposal facilities, together with all related mains, pump stations, lift stations, lines, and other equipment potentially available to serve the sewer service area of the authority or any other area that the authority agrees by contract to serve, whether such services are provided directly by the authority or indirectly by the authority via contract with a private entity. This term expressly includes any privately owned wastewater treatment plant and the administrative framework that operates the facilities.

Wastewater user charge means the charge established annually by the water and sewerage authority through which each sanitary sewer user pays for the use of said sewer to dispose of wastewater. The "total wastewater user charge" is the sum of the wastewater user charge plus the surcharge as defined in this section, if applicable.

Water meter means those devices approved by the authority for the purpose of establishing the quantity of water consumed by a premises or person.

Water system or authority's wastewater system means the total water distribution facilities owned and operated by the authority, or which by contract or agreement provide water to the authority, including the administrative framework that operates the facilities.

Watercourse means a natural or artificial channel for the passage of water either continuously or intermittently.

Waters of the state means any and all rivers, streams, creeks, branches, lakes, reservoirs, ponds, drainage systems, springs, wells, and other bodies of surface or subsurface water, natural or artificial, lying within or forming a part of the boundaries of the state which are not entirely confined and retained completely upon the property of a single individual, partnership, or corporation.

(Res. No. 2005-55, art. I(2), 9-15-2005) Sec. 54-41. Introduction; purpose and policy.

(a) This article sets forth uniform requirements for persons who cause wastewater to be discharged into the wastewater collection and treatment system of the county water and sewerage authority, and enables the authority to comply with all applicable state and federal laws, including but not limited to, the state Water Quality Act, the Clean Water Act, as amended, and the federal pretreatment regulations (40 CFR 403).

(b) The objectives of this article are:

(1) To prevent the introduction of pollutants into the authority's wastewater system which will interfere with the operation of the system or contaminate the resulting sludge;

(2) To prevent the introduction of pollutants into the authority's wastewater system which will pass through the system, inadequately treated, into receiving waters or the atmosphere or otherwise be incompatible with the system;

(3) To improve the opportunity to recycle and reclaim wastewater and sludge from the authority's wastewater system; and

(4) To provide for equitable distribution of the cost of the authority's wastewater system.

(c) This article further provides for the regulation of persons who cause wastewater to be discharged into the authority's wastewater system through the issuance of permits to nondomestic users and through enforcement activities, requires user reporting, assumes that existing customers' capacity will not be preempted, and provides for the setting of fees for the equitable distribution of costs resulting from the operation and maintenance of the water and wastewater systems.

(d) This division shall apply to the residents of the county and to residents outside the county who reside in the service delivery area of the authority and to all users of the county water and sewerage authority water and wastewater systems, including persons outside the service delivery area, who are, by contract or agreement with the authority, users of the authority's water and wastewater systems. Except as otherwise provided herein, the director of the authority or his designee, shall administer, implement and enforce the provisions of this article.

(Res. No. 2005-55, art. I(1), 9-15-2005) Sec. 54-42. Abbreviations.

The following abbreviations shall have the designated meanings:

BOD Biochemical oxygen demand CFR Code of Federal Regulations COD Chemical oxygen demand CWA Clean Water Act EPA Environmental Protection Agency GEPD State environmental protection division l Liter LAS Land application system mg Milligrams mg/l Milligrams per liter NPDES National Pollutant Discharge Elimination System O and M Operation and maintenance psi Pounds per square inch RCRA Resource Conservation and Recovery Act SIC Standard industrial classification TSS Total suspended solids USC United States Code (Res. No. 2005-55, art. I(3), 9-15-2005) Sec. 54-43. Sewage and waste disposal; use of public water and sewer systems required.

(a) Unlawful waste placement. It shall be unlawful for any person to place, deposit or permit to be deposited in any unsanitary manner on public or private property within the county or in any area under the jurisdiction of the county or the authority, any human or animal excrement, garbage, or other objectionable waste. It shall be unlawful to discharge to any natural outlet within the county, or in any area under the jurisdiction of the county or the authority, any sewage or other polluted waters, except where suitable treatment has been provided in accordance with this division. Except as hereinafter provided, it shall be unlawful to construct or maintain any privy, privy vault, septic tank, cesspool or other facility intended or used for the disposal of sewage.

(b) Connection to public systems. In the interest of the public health, sanitation and general welfare, all buildings and structures located within the authority's service delivery area, of every nature, use and design, intended for human occupancy, employment, recreation, or for other purposes shall have a proper source of potable drinking water and sewage disposal. The owner of each house, building, or property used for human occupancy, employment, recreation, or for other purposes is hereby required at the owner's expense to install suitable toilet facilities therein, and to connect the facilities directly into the authority's wastewater system in accordance with the authority's regulations, if such connection is required by state law, to wit, the state's manual for on-site sewage management systems, section 290-5-26-.03 (Ga.

Comp. Rules and Regs. 290-5-26-.03), which requires connection to public sewer when it is located within 200 feet of the owner's property or is located in a public right-of-way, road, or alley abutting the property.

(c) No permit issuance. No permit for the construction of any residence, building or other facility which cannot be served by public sanitary sewer shall be issued, and no certificate for the use and occupancy for any existing residence, building or other facility which cannot be served by public sanitary sewer shall be issued, unless a septic tank or individual sewage management system permit has been issued by the board of health in conformity with any state-wide minimum standards for on-site sewage management systems and the regulations of the county board of health then in force and effect.

(d) Connection upon failed system. Upon the failure of a septic tank or individual sewage management system, use of such system shall be discontinued. The property owner shall cause the building or structure to be connected to the public sanitary sewer system if such connection is required by state law, to wit, the state's manual for on-site sewage management systems, section 290-5-26-.03 (Ga. Comp. Rules and Regs. 290-5-26-.03), which requires connection to public sewer when it is located within 200 feet of the owner's property or is located in a public right-of-way, road, or alley abutting the property. Abandoned septic tanks and individual systems shall either be removed by the owner or filled with suitable material so as not to constitute a hazard or nuisance.

(Res. No. 2005-55, art. I(4), 9-15-2005) Sec. 54-44. Separate building sewers required.

A separate building sewer shall be provided for every building and structure intended for human occupancy and accessible to the public sanitary sewer system, unless for good cause shown the director issues a written permit to allow more than one building or structure to be connected on a common building sewer.

(Res. No. 2005-55, art. I(5), 9-15-2005) Sec. 54-45. Determination of wastewater volume.

Unless otherwise provided, the volume of wastewater delivered to the authority's wastewater system will be based upon the quantity of water purchased from, and metered by, the authority. If the volume of water delivered to the authority's wastewater system is greater or less than the volume purchased from the authority, the user shall make known to the authority such differences. If differences do exist, it shall be the obligation of the user to install authority-approved meters or other devices to determine the portion or quantity of wastewater delivered to the authority's wastewater system. At locations readily accessible for meter reading by the authority, separate water meters installed in the county right-of-way are preferred for measuring nonsewered consumptive water usage. The authority may consider establishing a constant ratio, factor or percentage to be applied to the metered water quantity delivered by the water system in order to determine the waste delivered by the user.

Determining, as well as justifying, the factor to the authority will be the responsibility of the user. The value of this factor may be periodically reviewed for accuracy by the authority. Other methods may be established by the authority to estimate the quantity of wastewater released to the sanitary sewer which considers the amount of water consumed during different seasons.

Users which claim wastewater volumes to be inaccurately determined by these methods shall bear the expense of installing authority-approved meters to estimate flows to the authority's wastewater system more accurately.

(Res. No. 2005-55, art. I(6), 9-15-2005) Sec. 54-46. Regulation of waste received from other jurisdictions.

(a) Intergovernmental agreements. If another county, municipality, or user located within another municipality or county contributes wastewater to the authority's wastewater system, the authority shall enter into an intergovernmental agreement with the respective municipality or county that is contributing or within which a user is contributing and shall revise the service delivery strategy if necessary.

(b) Required information. Prior to entering into an agreement required by subsection (a) of this section, the director shall request the following information from the contributing municipality:

(1) A description of the quality and volume of wastewater discharged to the authority's wastewater system by the contributing jurisdiction;

(2) An inventory of all users located within the contributing municipality that are discharging to the authority's wastewater system;

(3) Such other information as the director may deem necessary.

(c) Contents of an intergovernmental sewer agreement. An intergovernmental agreement, as required by subsection (a) of this section, shall contain the following conditions:

(1) A requirement for the contributing jurisdiction to adopt a sewer use article which is at least as stringent as this article with prohibited discharges and local maximum allowable limits that are at least as stringent as those set out in division 2 of this article. The requirement shall specify that such ordinance and limits must be revised as necessary to reflect changes made to this division or local limits;

(2) A requirement for the contributing jurisdiction to submit a revised user inventory on at least an annual basis;

(3) A provision specifying which pretreatment implementation activities, including wastewater discharge permit issuance, inspection and sampling, and enforce-ment, will be conducted by the contributing jurisdiction; which of these activities will be conducted by the director; and which of these activities will be conducted jointly by the contributing jurisdiction and the director;

(4) A requirement for the contributing jurisdiction to provide the director with access to all information that the contributing jurisdiction obtains as part of its pretreatment activities;

(5) Limits on the nature, quality, and volume of the contributing jurisdiction's wastewater at the point where it discharges to the authority's wastewater system;

(6) Requirements for monitoring the contributing jurisdiction's discharge;

(7) For those users that are not the jurisdiction itself, a provision ensuring the director access to the facilities of contributing nonresidential users located within the contributing jurisdiction's boundaries for the purpose of inspection, sampling, and any other duties deemed necessary by the director; and

(8) A provision specifying remedies available for breach of the terms of the intergovernmental agreement.

(Res. No. 2005-55, art. I(7), 9-15-2005) Sec. 54-47. Construction standards.

(a) Generally. All extensions of the authority's wastewater system shall be designed and built in accordance with standards adopted by the authority. No installation of pipe or other materials for sewer extensions shall be allowed until the required information is received and the design is approved by the director. Inspection and acceptance procedures shall be specified in the standards adopted by the authority.

(b) Prohibitions. No building sewers shall be connected to a sanitary sewer until as-built drawings are received and until the extension has been inspected, tested, and accepted in writing for county operation and maintenance. Groundwater, rainwater, mud, and gravel shall be kept out of the sanitary sewer system at all times, including during construction.

(c) Other regulations. Design and construction of a sanitary sewer extension shall comply with all local, state, and federal rules and regulations pertaining to sewer installation, including but not limited to rules and regulations for safety, erosion and sediment control, stream buffer protection, wetlands, and water quality standards.

(d) Authority. The authority is hereby authorized to issue and from time to time amend the standards of construction referenced in this section. Any such standards of construction shall be available to the public at the offices of the authority.

(Res. No. 2005-55, art. I(8), 9-15-2005) Sec. 54-48. Hauled wastewater; holding tank discharge.

(a) Generally. All persons owning or operating septage pump trucks or other liquid waste transport trucks shall not discharge, directly or indirectly, wastewater into the authority's wastewater system, unless such person shall first have applied for and received a mobile discharge operation ("MDO") permit from the authority. Each hauler is required to comply with any and all rules and regulations adopted by the authority for haulers. Persons doing business under a MDO permit shall not discharge into the county any sewage which originated outside of the boundaries of the county. Anyone found guilty of discharging into the county such "holding tank" waste known to have originated outside of the county shall be subject to a fine not exceeding $1,000.00 for each violation.

(b) Permit. The MDO permit shall have a one-time nonrefundable fee as may be established by the authority, provided that such permit shall be subject to revocation by the authority for violation of any provision of this article or reasonable regulation established by the authority.

Such permits shall be limited to the discharge of wastewater which has none of the prohibited substances enumerated in division 2 of this article. The owners of such vehicles shall affix and display the permit number on the side of each vehicle used for such purposes.

(c) Discharge locations and conditions. The director shall designate the locations and times where such trucks may be discharged, and may refuse to accept any truckload of waste where it appears to the authority that the waste could interfere with the effective operation of the authority's wastewater system. Further, it shall be the responsibility of the dumping vehicle operator to advise the treatment plant operator of the contents of his load and its source prior to dumping. The director may collect samples of each hauled load to ensure compliance with applicable standards. Anyone found guilty of discharging into the authority's wastewater system at a location not approved for dumping shall be subject to a fine not exceeding $1,000.00 for each incident.

(d) No hauled industrial waste will be accepted without express permission from the director.

The director shall require haulers of industrial waste to obtain wastewater discharge permits in accordance with the application and approval provisions set forth in sections 54-40 through 54-42. The director also may prohibit the disposal of hauled industrial waste. The discharge of hauled industrial waste is subject to all other requirements of this article.

(e) Waste-tracking form. All industrial waste haulers must submit to the authority a waste-tracking form for every load. This form shall include, at a minimum, the name and address of the industrial waste hauler, permit number, truck identification, names and addresses of sources of waste, and volume and characteristics of waste. The form shall identify the type of industry and known or suspected waste constituents. In any event, no industrial waste hauler shall be permitted to haul and discharge hazardous wastes (as identified by the May 19, 1980 Environmental Protection Agency Hazardous Waste Regulations, part 261 or any revision thereof or the Georgia Comprehensive Waste Management Act and associated rules) into the authority's wastewater system.

((Res. No. 2005-55, art. I(9), 9-15-2005) Secs. 54-49—54-69. Reserved.

DIVISION 2. PROHIBITED DISCHARGES

Sec. 54-70. General prohibitions.

No user shall contribute or cause to be contributed directly or indirectly, into the authority's wastewater system any pollutant or wastewater which causes pass through or interference.

These general prohibitions apply to all users of the authority's wastewater system, whether or not they are subject to federal categorical pretreatment standards or any other federal, state, or local pretreatment standards or requirements.

(Res. No. 2005-55, art. II(1), 9-15-2005) Sec. 54-71. Specific prohibitions.

No user shall contribute or cause to be contributed, directly of indirectly, into the authority's wastewater system the following pollutants, substances, or wastewater:

(1) Any liquids, solids or gases which by reason of their nature or quantity are, or may be, sufficient either alone or by interaction with other substances to cause fire or explosion or be injurious in any other way to the authority's wastewater system or to the operation of the authority's wastewater system. At no time shall a wastestream be discharged with a closed-cup flashpoint of less than 140 degrees Fahrenheit (60 degrees Celsius) using the test methods specified in 40 CFR

261.21. At no time shall a wastestream be discharged which yields two successive readings on an explosion hazard meter, at the point of discharge into the system (or at any point in the system), of more than five percent, nor any single reading over ten percent, of the lower explosive limit (LEL) of the meter;

(2) Wastewater having a pH less than 6.0 or more than 9.5, or otherwise causing corrosive structural damage to the authority's wastewater system or equipment or wastewater having any other corrosive property capable of causing damage or hazard to structures, equipment and/or personnel of the authority's wastewater system, unless the authority's wastewater system is specifically designed to accommodate such wastewater;

(3) Solid or viscous substances in amounts which will cause obstruction of the flow in the sewer system or authority's wastewater system resulting in interference including, but not limited to, garbage with particles greater than one-half inch in any dimension, ashes, cinders, animal entrails, paunch, manure, offal, bones, hair, hide, hides or fleshings, whole blood, beer or distillery slops, feathers, sand, lime residues, cannery waste, stone or marble dust, metal, grass straw, grass clippings, rags, spent grains, spent hops, wastepaper, wood, plastics, paper, cardboard, fiberglass, paint or ink residues, gas, tar, asphalt residues, chemical residues, solid grease of animal or mineral origin, or residues from refining or processing wastes;

(4) Pollutants, including oxygen-demanding pollutants (BOD, etc.), released in a discharge at a flowrate and/or pollutant concentration which, either singly or by interaction with other pollutants, will cause interference with the authority's wastewater system. In no case shall a discharge have a flow rate or contain concentration or quantities of pollutants that exceed for any time period longer than 15 minutes, more than five times the average 24-hour concentration, quantities, or flow during normal operation of the discharger's facility;

(5) Wastewater having a temperature greater than 90 degrees Fahrenheit (32 degrees Celsius) or less than 59 degrees Fahrenheit (15 degrees Celsius), or which will inhibit biological activity in the treatment plant resulting in interference or impermissible pass through;

(6) Petroleum oil, nonbiodegradable cutting oil, or products of mineral oil origin, in amounts that will cause interference or impermissible pass through;

(7) Pollutants which result in the presence of toxic gases, vapors, or fumes within the authority's wastewater system, either singly or by interaction with other pollutants, in a quantity that may cause acute worker health and safety problems or are sufficient to create a public nuisance as defined by state law or as may be determined by a court with applicable jurisdiction;

(8) Any wastewater containing toxic pollutants in sufficient quantity, either singly or by interaction with other pollutants, to injure or interfere with any wastewater treatment process, constitute a hazard to humans or animals, create a toxic effect in the receiving waters of the authority's wastewater system, or to exceed the limitation set forth in a federal categorical pretreatment standard. A toxic pollutant shall include, but not be limited to, any pollutant identified pursuant to section 307(a) of the Act;

(9) Trucked or hauled pollutants, except at discharge points designated by the director in accordance with this article. No septic tank or other trucked or hauled pollutants will be permitted, except by special license and by special agreement, to include the approval of the agreement by any applicable treatment plant;

(10) Noxious or malodorous liquids, gases, solids, or other wastewater which, either singly or by interaction with other wastes, are sufficient to create a public annoyance or danger or a hazard to life, or to prevent entry into the sewers for maintenance or repair;

(11) The discharge of any wastewater, sewage, or polluted water to any natural outlet or onto any public or private property shall be prohibited;

(12) Wastewater which imparts color which cannot be removed by the treatment process, such as, but not limited to, dye wastes and vegetable tanning solutions, which consequently imparts color to a treatment plant's effluent;

(13) Wastewater containing any radioactive wastes or isotopes except in compliance with applicable state or federal regulations;

(14) Stormwater, surface water, groundwater, artesian well water, roof runoff, subsurface drainage, swimming pool drainage, condensate, deionized water, noncontact cooling water, and unpolluted wastewater shall not be discharged through direct or indirect connection to a sanitary sewer, unless specifically authorized by the director. Under no conditions will sanitary sewage be discharged to a storm sewer;

(15) Sludge, screenings, or other residues from the pretreatment of industrial wastes;

(16) Any substance which may cause the authority's wastewater system effluent or any other product of the authority's wastewater system such as residues, sludges, or scums, to be unsuitable for reclamation and reuse or to interfere with the reclamation process where the authority's wastewater system is pursuing a reuse and reclamation program. In no case shall a substance discharged to the authority's wastewater system be in noncompliance with sludge use or disposal criteria, guidelines, or regulations developed under section 405 of the Act, any criteria, guidelines, or regulations affecting sludge use or disposal developed pursuant to the Solid Waste Disposal Act, the Clean Air Act, the Toxic Substances Control Act, state criteria applicable to the sludge management method being used, or any future regulation;

(17) Medical wastes, except as specifically authorized by the director in a permit;

(18) Wastewater causing, alone or in conjunction with other sources, a treatment plant's effluent to fail toxicity test;

(19) Detergents, surface-active agents, or other substances which may cause excessive foaming in the authority's wastewater system;

(20) Fats, oils, or greases of animal or vegetable origin in concentrations greater than 100 milligrams per liter. Fats, oils, and greases shall not exceed 20 percent of BODs by weight;

(21) Any substance which will cause the authority's wastewater system to violate any applicable NPDES, LAS permit, any other applicable permit, the receiving water quality standards, and/or any other applicable federal, state, or local law, rule or regulation.

(Res. No. 2005-55, art. II(2), 9-15-2005) Sec. 54-72. Maximum allowable limits.

(a) Specific influent requirements. The maximum allowable pollutant limits set forth in this section are established to protect against process interference, adverse impacts to land application treatment systems, stream standards violations, groundwater quality violations or sludge contamination. Discharges by users of the authority's wastewater system are limited such that the concentrations of specific pollutants measured at the entry point to the wastewater treatment and disposal system do not exceed the concentrations specified in the table in this section. No user shall discharge wastewater, which exceeds the following daily maximum limits (all numbers shown in milligrams per liter (mg/l)):

Conventional Pollutants Concentration (mg/l) Loading (lbs./dry)1

BOD 415 173

COD 1,200 500

TSS 317 132

TKN 64 27

Ammonia-nitrogen 35 15 Total phosphorous 15 6.3 Average daily flow 50,000 gal./day Peak daily flow 100,000 gal./day Sec. 54-73. Federal and state requirements on prohibited discharges.

Any laws or regulations promulgated by the state relative to the construction or use of wastewater facilities, which are stricter than the regulations provided herein, are incorporated herein by reference, and such regulations shall be enforced by the authority. Likewise, the federal government has adopted regulations governing wastewater discharges from industries into treatment works. These federal regulations are generally referred to as the federal pretreatment standards, as set forth in 40 CFR 403, or the federal categorical pretreatment standards, as set forth in 40 CFR 405—471. Any portion of these federal standards which are stricter than the regulations provided in this article are incorporated herein by reference, and such regulations will be enforced by the authority. The permitting provisions of this article shall not be deemed to be alleviating compliance with applicable state and federal regulations.

(Res. No. 2005-55, art. II(4), 9-15-2005) Sec. 54-74. Dilution.

No user shall ever increase the use of process water or, in any way, attempt to dilute a discharge as a partial or complete substitute for adequate treatment to achieve compliance with the limitations contained in the federal pretreatment standards, or in any other pollutant specific limitation developed by this article and EPD. The director may impose mass limitations on users who are using dilution to meet applicable pretreatment standards or requirements or in other cases when the imposition of mass limitations is appropriate. Where necessary in the opinion of the authority, equalizing may be required to bring constituents or volume to an acceptable level and to hold or equalize flows such that no peak flow conditions may interfere with the authority's wastewater system. Said equalization or holding unit shall have a capacity suitable to serve its intended purpose, as stated in this section, and be equipped with acceptable outlet control facilities to provide flexibility in operation and accommodate changing conditions in the waste flow.

(Res. No. 2005-55, art. II(5), 9-15-2005) Sec. 54-75. Accidental or slug discharges.

(a) Generally. In the case of any discharge, including, but not limited to, accidental discharges, discharges of a nonroutine, episodic nature, a noncustomary batch discharge, or slug load, that may cause potential problems for the authority's wastewater system, it is the responsibility of the user to immediately telephone and notify the authority of the incident.

The notification shall include:

(1) Location of discharge;

(2) Type of waste discharged;

(3) Concentration and volume; and

(4) Corrective actions taken by the user.

(b) Written notice. Within five calendar days following an accidental discharge, the user shall submit to the authority a detailed written report describing the cause of the discharge and the measures to be taken by the user to prevent similar future occurrences. Such notification shall not relieve the user of any expense, loss, damage, or other liability which may be incurred as a result of damage to the authority's wastewater system, fish kills, or any other damage to person or property; nor shall such notification relieve the user of any fines, civil penalties, or other liability which may be imposed by this section or other applicable law.

Noncompliance with this provision shall constitute a violation of this section and subject the user to the penalties described in this section.

(c) Notice to employees. A notice shall be permanently posted on the user's bulletin board or other prominent place advising employees to call the authority in the event of a discharge of any of the substances enumerated in this article as a prohibited discharge.

(d) Accidental discharge/slug control plan. Periodically, the director shall evaluate whether each significant industrial user needs an accidental discharge/slug control plan. In addition, the director may require any user to develop, submit for approval, and implement such a plan.

Alternatively, the director may develop such a plan for any user. An accidental discharge slug control plan shall address, at a minimum, the following:

(1) Description of discharge practices, including nonroutine batch discharges;

(2) Description of stored chemicals;

(3) Procedures for immediately notifying the director of any accidental or slug discharge; and

(4) Procedures to prevent adverse impact from any accidental or slug discharge.

(Res. No. 2005-55, art. II(6), 9-15-2005) Sec. 54-76. Hazardous wastes.

It is a violation of this article to discharge or cause to discharge any material identified as a hazardous waste by the May 19, 1980, Environmental Protection Agency Hazardous Waste Regulations, part 261 or any revision thereof or the Georgia Comprehensive Waste Management Act and associated rules. This prohibition extends to all wastes identified in subpart D regardless of the quantity of hazardous material stored or generated.

(Res. No. 2005-55, art. II(7), 9-15-2005) Sec. 54-77. Sand and oil/grease interceptors.

(a) General prohibition. There shall be no discharge of grease trap waste into the authority's wastewater system, unless a license is issued by the director for good cause shown.

(b) Requirements.

(1) Preparation of food for retail or commercial purposes. All users involved in the preparation of food for retail or commercial purposes shall provide oil/grease interceptors or traps. Additionally, any user who generates a wastewater which contains greater than the quantity of oil and grease regulated under section 54-70, and provided that the excess oil and grease is floatable and can be effectively removed in an oil/grease interceptor or trap, then said user will be required to install a grease/oil interceptor.

(2) Unusually large quantities or grit. All users whose wastewater stream is associated with unusually large quantities or grit, sand or gravel shall be required to install, operate, and maintain a sand/grit trap. All car/truck wash systems and poultry hatcheries shall be required to install a sand/grit trap. Their design and installation shall be approved by the authority.

(3) Applicability. The requirements of this subsection shall not apply to private living quarters or dwelling units.

(c) Design criteria.

(1) For restaurants and other eating establishments. All sand and oil/grease interceptors used in conjunction with restaurants or other eating establishments shall have a capacity of 15 gallons per seat, except that no grease trap shall be smaller than 750 gallons or larger than 3,000 gallons.

(2) For facilities other than eating establishments. All sand and oil/grease interceptors used in conjunction with facilities other than eating establishments shall have a capacity that will provide not less than ten minutes nor more than 30 minutes retention time at the peak eight hour flowrate; flowthrough velocities shall not exceed one foot per second at the peak eight hour flowrate.

(3) Accordance to state minimum standards. Where such parameters have not been otherwise set forth herein, all sand and oil/grease interceptors shall be sized, located and constructed in accordance with the provisions of the state minimum standards plumbing code adopted by the water and sewerage authority in conjunction with the state Uniform Codes Act.

(d) Maintenance.

(1) By user. All grease, oil and sand/grit interceptors or traps shall be maintained by the user at their expense, in continuously efficient operation at all times.

(2) Proper removal and disposal. In the maintaining of these interceptors, the owner shall be responsible for the proper removal and disposal by appropriate means of the captured material, and shall maintain records of the dates, and means of disposal, which are subject to review by the director. The frequency of removal shall be such as to ensure that no overflows of oil, grease, or sand, or other grit material into the wastewater system ever results.

(3) Records. Material haulers are required to give a manifest to the producer each time materials are removed. As materials are removed, the manifest from the haulers are required to be sent to the director within 30 days of their removal.

(4) Fees. The authority will inspect interceptors yearly at a fee as set forth in the county fee schedule in section 18-19. If a reinspection is required an additional charge will be given as set forth in the county fee schedule.

(e) Proper disposal of collected materials. Any removal and hauling of the collected materials not performed by the owner's employees must be performed by currently licensed waste disposal firms. All material shall be disposed of at a facility permitted to receive such waste. Under no circumstances shall the collected materials ever be returned to the wastewater system.

(Res. No. 2005-55, art. II(8), 9-15-2005) Secs. 54-78—54-97. Reserved.

DIVISION 3. PERMITTING FOR NONDOMESTIC USERS

Sec. 54-98. Sanitary sewer discharge permits for nondomestic users; the general permit.

(a) Generally. All nondomestic users (who are not determined to be significant industrial users) must have issued to them a general permit prior to connection to the authority's wastewater system. Any violation of the terms and conditions of a permit shall be deemed a violation of this division and subject the user to the sanctions set forth in this article.

Obtaining a permit does not relieve a user of its obligation to comply with all federal and state pretreatment standards or regulations. Prior or subsequent to the issuance of a permit, the user is required to submit to the authority revised plans whenever alterations or additions to the user's premises or operations vary from the original submitted application. The director may also initiate inquiries concerning revisions and process changes at six-month intervals.

(b) Application process. All nondomestic users shall complete and submit to the director a sanitary sewer discharge permit application, together with any applicable application fee.

Proposed new users shall make application no later than 90 days prior to their intended date of connection to the authority's wastewater system. The sanitary sewer discharge permit application shall be on a form provided by the director and shall be used for the purposes of determining whether the industry is a "significant industrial user," issuing a permit, and for other purposes. The sanitary sewer discharge permit application (which shall be the only permit application required for nondomestic users and those ultimately determined to be significant industrial users) shall include the following information, at a minimum:

(1) Name, address and location, if different from the address.

(2) SIC number according to the Standard Industrial Classification Manual, U.S.

Office of Management and Budget, 1987, as amended.

(3) Wastewater constituents and characteristics.

(4) Time and duration of contribution.

(5) Average daily and peak wastewater flow rates, including daily, monthly and seasonal variations if any.

(6) Site plans, floor plans, mechanical and plumbing plans and details to show all sewers, sewer connections and appurtenances by size, location and elevation.

(7) Description of activities, facilities and plant processes on the premises, including all materials, which are or could be discharged.

(8) Each product produced by type, amount, process and rate of production.

(9) Type and amount of raw materials processed (average and maximum per day).

(10) Number and type of employees and hours of operation of plant and proposed or actual hours of operation of pretreatment system.

(11) Any other information as may be deemed by the authority to be necessary to evaluate the permit application.

(12) All wastewater discharge permit applications and user reports must be signed by the user or an authorized representative of the user and contain the following certification statement (which requirement is hereinafter referred to in this section as the certification):

"I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to ensure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations."

(c) Review and determination. The director will evaluate the data furnished by the user and may require additional information. Upon completion of the evaluation, the director shall issue or deny a general permit within 45 calendar days of receipt of the application. The director may deny an application, in writing, stating the reasons for the denial. If the director determines that the applicant is a significant industrial user, the director shall notify the applicant of the requirement to be considered for the issuance of a significant industrial user permit within 45 calendar days of receipt of the original application.

(Res. No. 2005-55, art. III(1), 9-15-2005) Sec. 54-99. Significant industrial user permits.

(a) Generally. All significant industrial users, as that term is defined in section 54-40, proposing to connect to the authority's wastewater system must obtain a permit ("SIU permit") before connecting to the authority's system. Any violation of the terms and conditions of a permit shall be deemed a violation of this article and subject the user to the sanctions set forth in this article. Obtaining a permit does not relieve a user of its obligation to comply with all federal and state pretreatment standards or regulations. Prior or subsequent to the issuance of a permit, the user is required to submit to the authority revised plans whenever alterations or additions to the user's premises or operations vary from the original submitted application.

The director may also initiate inquiries concerning revisions and process changes at six-month intervals.

(b) Application process. All significant industrial users shall complete and file with the director an application for a permit consistent with the requirements for the application set forth in section 54-98(b), accompanied by any applicable application fee. Proposed new users shall make application not less than 90 days prior to their intended date of connection to the authority's wastewater system. The completed permit application for a general permit described in section 54-41 will serve as an application for a SIU permit.

(c) Review and determination. The director will evaluate the data furnished by the user and may require additional information. Within 60 days of receipt of a complete SIU permit application, the director will determine whether or not to issue a SIU permit. The director may deny any application for a SIU permit, in writing, stating the reasons for denial.

(Res. No. 2005-55, art. III(2), 9-15-2005) Sec. 54-100. Significant industrial users.

All significant industrial users shall comply with the following, in addition to any permit requirements:

(1) Sampling manhole. In order to provide for accurate sampling and measurement of industrial wastes, each significant industrial user shall provide and maintain, on each of its industrial waste outlet sewers, a monitoring station to be located outside the plant. If inside the plant fence, there shall be a gate near the sampling manhole with a key furnished to the authority. There shall be ample room provided in each monitoring station to enable convenient inspection and sampling by the authority or its agent. Also, a parshal flume or other approved flow measurement element and a 110-volt electrical outlet may be required to allow for composite sampling. In certain monitoring stations where noxious fumes may accumulate, the authority may require a fume exhaust system to protect the life and health of the authority employees who are required to enter the monitoring station. The fume exhaust system should extract the fumes from the bottom of the station and provide not less than one air change per minute.

(2) Significant industrial user permit required. It shall be unlawful for any significant industrial user to fail to obtain a significant industrial user ("SIU") permit (as detailed in this section prior to connection to the authority's wastewater system.

(Res. No. 2005-55, art. III(3), 9-15-2005) Sec. 54-101. Provisions applicable to general permits and SIU permits.

The following provisions shall apply equally to all general permits and SIU permits:

(1) Conditions. Permits shall be expressly subject to all provisions of this article and all other applicable regulations, user charges and fees established by the authority. Permits must contain, at a minimum, the following:

a. A statement that indicates permit duration, which in no event shall exceed five years;

b. A statement that the wastewater discharge permit is nontransferable without prior notification to the authority in accordance with subsection (5) of this section, and provisions for furnishing the new owner or operator with a copy of the existing permit;

c. Effluent limits based on applicable pretreatment standards;

d. Self-monitoring, sampling, reporting, notification, and recordkeeping requirements. These requirements shall include an identification of pollutants to be monitored, sampling location, sampling frequency, and sample type based on federal, state, and local law; and

e. A statement of applicable sanctions for violation of pretreatment standards and requirements, and any applicable compliance schedule. Such schedule may not extend the time for compliance beyond that required by applicable federal, state, or local law.

f. Permits may also contain, but need not be limited to, the following conditions:

1. Limits on the average and/or maximum rate of discharge, time of discharge, and/or requirements for flow regulation and equalization;

2. Requirements for the installation of pretreatment technology, pollution control, or construction of appropriate containment devices, designed to reduce, eliminate, or prevent the introduction of pollutants into the treatment works;

3. Requirements for the development and implementation of spill control plans or other special conditions including management practices

necessary to adequately prevent accidental, unanticipated, or nonroutine discharges;

4. Development and implementation of waste minimization plans to reduce the amount of pollutants discharged to the authority's wastewater system;

5. The unit charge or schedule of user charges and fees for the management of the wastewater discharged to the authority's wastewater system;

6. Requirements for installation and maintenance of inspection and sampling facilities and equipment;

7. A statement that compliance with the wastewater discharge permit does not relieve the permittee of responsibility for compliance with all applicable federal and state pretreatment standards, including those which become effective during the term of the permit; and

8. Other conditions as deemed appropriate by the director to ensure compliance with this article, and state and federal laws, rules, and regulations.

(2) Modification of permit. The terms and conditions of the permit may be subject to modification by the authority during the term of the permit as limitations or requirements are modified, conditions change, or other just cause exists. The user shall be informed of any proposed changes in his permit at least 30 days prior to the effective date of change. Any changes or new conditions in the permit shall include a reasonable time schedule for compliance. The director may modify a permit for good cause, including, but not limited to, the following reasons:

a. To incorporate any new or revised federal, state, or local pretreatment standards or requirements;

b. To address significant alterations or additions to the user's operation, processes, or wastewater volume or character since the time of wastewater discharge permit issuance;

c. A change in the authority's wastewater system that requires either a temporary or permanent reduction or elimination of the authorized discharge;

d. Information indicating that the permitted discharge poses a threat to the authority's wastewater system, authority personnel, the receiving waters or any applicable permit;

e. Violation of any terms or conditions of permit;

f. Misrepresentations or failure to fully disclose all relevant facts in the permit application or in any required reporting;

g. Revision of or a grant of variance from categorical pretreatment standards pursuant to 40 CFR 403.13;

h. To correct typographical or other errors in the permit; or

i. To reflect a transfer of the facility ownership or operation to a new owner or operator.

(3) Reporting requirements. Any significant change in the nature or volume of the wastewater constituents of a permitted user shall be reported to the authority in a timely fashion and may require the user to apply for a revised permit.

(4) Duration. Permits shall be issued for a period as determined by the director, not to exceed five years, and shall bear a stated expiration date. It shall be the responsibility of the user to apply for permit renewal a minimum of 60 days prior to the expiration of the existing permit. Users who become subject to federal categorical pretreatment standards shall apply for new permits on the effective date of said standards.

(5) Transfer of permit. Permits may be transferred to a new owner or operator only if the user gives at least 60 days advance notice to the director and the director approves the permit transfer. The notice to the director must include a written certification by the new owner or operator which:

a. States that the new owner and/or operator has no immediate intent to change the facility's operations and processes;

b. Identifies the specific date on which the transfer is to occur; and

c. Acknowledges full responsibility for complying with the existing wastewater discharge permit.

Failure to provide advance notice of a transfer renders the wastewater discharge permit void as of the date of facility transfer.

(6) Permit fees. The authority may adopt by resolution reasonable permit fees for reimbursement of various costs related to the permit and review process. The fee, if any, for a general permit or SIU permit will be due at the time application is made to the authority and shall be nonrefundable. The fee schedule in place at the time of the application submission shall be the fee charged.

(7) Suspension, revocation or denial; procedure.

a. When the director has reason to believe that any one of the conditions enumerated in subsection (7)b. of this section exists, he shall give written notice thereof to the user. Said notice shall set forth the time and place where the charges shall be heard by the director. The hearing date shall not be less than 15 days from the mailing of such notice by certified mail to the user at the address shown on the permit or at user's last known address. At the hearing, the user shall have an opportunity to refute the allegations set forth in the proposed permit revocation notice. If after the hearing the director finds that any one of the conditions hereinafter enumerated in subsection (7)b. of this section, exists, he shall have the right to suspend, revoke or deny the permit.

b. Any of the items on the list set forth in this subsection is reason for permit suspension, revocation or denial. The following list is not intended to be exhaustive:

1. Failure to notify the director of significant changes to the wastewater prior to the changed discharge;

2. Failure to provide prior notification to the director of changed conditions;

3. Misrepresentation or failure to fully disclose all relevant facts in the permit application;

4. Falsifying self-monitoring reports;

5. Tampering with monitoring equipment;

6. Refusing to allow the director timely access to the facility premises and records;

7. Failure to meet effluent limitations;

8. Failure to pay fines;

9. Failure to pay sewer charges;

10. Failure to meet compliance schedules;

11. Failure to complete a wastewater survey or the permit application;

12. Failure to provide advance notice of the transfer of business ownership of a permitted facility; or

13. Violation of any pretreatment standard or requirement, or any terms of the permit or this article.

(8) Appeal. Any aggrieved user, whose permit application has been denied or who disagrees with conditions imposed in a permit, may petition the director to reconsider the decision within ten days of notice of its denial or notice of the conditions in the permit.

a. Failure to submit a timely petition for review shall be deemed to be a waiver of any administrative appeal. The petition shall set forth all grounds of alleged error upon which the permit denial was based.

b. If the director fails to act within 30 days, a request for reconsideration shall be deemed to be denied. Decisions not to reconsider a permit denial shall be considered final administrative actions for purposes of judicial review.

c. Aggrieved users seeking judicial review of the final administrative permit decision must do so by filing a petition for writ of certiorari in the county superior court.

(Res. No. 2005-55, art. III(4), 9-15-2005) Sec. 54-102. Reporting requirements for nondomestic users.

(a) Baseline monitoring reports.

(1) New source discharge; pretreatment; anticipated flow and quantity estimates.

Within either 180 days after the effective date of a federal categorical pretreatment standard, or the final administrative decision on a category determination under 40 CFR 403.6(a)(4), whichever is later, existing categorical users currently discharging to or scheduled to discharge to the authority's wastewater system shall submit to the director a report which contains the information listed in subsection (a)(2) of this section. At least 90 days prior to commencement of their discharge, new sources, and sources that become categorical users subsequent to the promulgation of an applicable categorical standard, shall submit to the director a report which contains the information listed in subsection (a)(2) of this section. A new source shall report the method of pretreatment it intends to use to meet applicable categorical standards. A new source also shall give estimates of its anticipated flow and quantity of pollutants to be discharged.

(2) Prerequisite information. Users described in subsection (a)(1) of this section shall submit the following information:

a. Identifying information. The name and address of the facility, including the name of the operator and owner.

b. Environmental permits. A list of any environmental control permits held by or for the facility.

c. Description of operations. A brief description of the nature, average rate of production, and standard industrial classifications of the operation carried out by such user. This description should include a schematic process diagram, which indicates points of discharge to the authority's wastewater system from the regulated processes.

d. Flow measurement. Information showing the measured average daily and maximum daily flow, in gallons per day, to the authority's wastewater system from regulated process streams and other streams, as necessary, to allow use of the combined wastestream formula set out in 40 CFR 403.6(e).

e. Measurement of pollutants.

1. The categorical pretreatment standards applicable to each regulated process.

2. The results of sampling and analysis identifying the nature and concentration, and/or mass, where required by the standard or by the director, of regulated pollutants in the discharge from each regulated process. Instantaneous, daily maximum, and longterm average concentrations, or mass, where required, shall be reported. The sample shall be representative of daily operations and shall be analyzed in accordance with procedures set out in this article.

3. Sampling must be performed in accordance with procedures set out in this article.

f. Certification. A statement, reviewed by the user's authorized representative and certified by a qualified professional, indicating whether pretreatment standards are being met on a consistent basis, and, if not, whether additional operation and maintenance (O and M) and/or additional pretreatment is required to meet the pretreatment standards and requirements.

g. Compliance schedule. If additional pretreatment and/or O and M will be required to meet the pretreatment standards, the shortest schedule by which the user will provide such additional pretreatment and/or O and M.

The completion date in this schedule shall not be later than the compliance date established for the applicable pretreatment standard. A compliance schedule pursuant to this section must meet the requirements set out in this article.

h. Signature and certification. All baseline monitoring reports must be signed and certified in accordance with this article.

(b) Compliance schedule progress reports. The following conditions shall apply to the compliance schedule required by subsection (a)(2)g. of this section:

(1) The schedule shall contain progress increments in the form of dates for the commencement and completion of major events leading to the construction and operation of additional pretreatment required for the user to meet the applicable pretreatment standards (such events include, but are not limited to, hiring an engineer, completing preliminary and final plans, executing contracts for major components, commencing and completing construction, and beginning and conducting routine operation);

(2) No increment referred to in subsection (b)(1) of this section shall exceed nine months;

(3) The user shall submit a progress report to the director no later than 14 days following each date in the schedule and the final date of compliance including, as a minimum, whether or not it complied with the increment of progress, the reason for any delay, and, if appropriate, the steps being taken by the user to return to the established schedule; and

(4) In no event shall more than nine months elapse between such progress reports to the director.

(c) Periodic compliance reports.

(1) All significant industrial users shall, at a frequency determined by the director, but in no case less than twice per year (in June and December), submit a report indicating the nature and concentration of pollutants in the discharge which are limited by pretreatment standards and the measured or estimated average and maximum daily flows for the reporting period. All periodic compliance reports must be signed and certified in accordance with this article.

(2) All other users who have been issued general permits are required to submit compliance reports at the intervals set forth in each user's individual permit. The compliance reports shall address the discharge parameters and all other information indicated as being necessary to report as shown in the user's permit.

(3) All wastewater samples must be representative of the user's discharge. Wastewater monitoring and flow measurement facilities shall be properly operated, kept clean, and maintained in good working order at all times. The failure of a user to keep its monitoring facility in good working order shall not be grounds for the user to claim that sample results are unrepresentative of its discharge.

(4) If a user subject to the reporting requirement in this section monitors any pollutant more frequently than required by the director, using the procedures prescribed in this article, the results of this monitoring shall be included in the report.

(d) Reports on compliance with federal categorical pretreatment standard deadline. Within 90 days following the date for final compliance with applicable categorical pretreatment standards, or in the case of a new source following commencement of the introduction of wastewater into the authority's wastewater system, any user subject to such pretreatment standards and requirements shall submit to the director a report containing the information described in subsections (a)(2)d. through f. of this section. For users subject to equivalent mass or concentration limits established in accordance with the procedures in 40 CFR 403.6(c), this report shall contain a reasonable measure of the user's longterm production rate. For all other users subject to categorical pretreatment standards expressed in terms of allowable pollutant discharge per unit of production (or other measure of operation), this report shall include the user's actual production during the appropriate sampling period. All compliance reports must be signed and certified in accordance with this article.

(e) Reports of changed conditions. Each user must notify the director of any planned significant changes to the user's operations or system, which might alter the nature, quality, or volume of its wastewater at least 60 days before the change.

(1) The director may require the user to submit such information as may be deemed necessary to evaluate the changed condition, including the submission of a new permit application according to the procedures set forth in this article.

(2) The director may issue a permit under this article or modify an existing permit under this article in response to changed conditions or anticipated changed conditions.

(3) For purposes of this requirement, significant changes include, but are not limited to, flow increases of 20 percent or greater, and the discharge of any previously unreported pollutants.

(f) Reports of potential problem, including slug loading.

(1) In the case of any discharge, including, but not limited to, accidental discharges, discharges of a nonroutine, episodic nature, a noncustomary batch discharge, or a slug load, that may cause potential problems for the authority's wastewater system, the user shall immediately telephone and notify the authority of the incident. This notification shall include the location of the discharge, type of waste, concentration and volume, if known, and corrective actions taken by the user.

(2) Within five days following such discharge, the user shall, unless waived by the director, submit a detailed written report describing the cause of the discharge and the measures to be taken by the user to prevent similar future occurrences.

Such notification shall not relieve the user of any expense, loss, damage, or other liability, which may be incurred as a result of damage to the authority's wastewater system, natural resources, or any other damage to person or property; nor shall such notification relieve the user of any fines, penalties, or other liability which may be imposed pursuant to this article.

(3) A notice shall be permanently posted on the user's bulletin board or other prominent place advising employees whom to call in the event of a discharge described in subsection (f)(1) of this section. Employers shall ensure that all employees, who may cause such a discharge to occur, are advised of the emergency notification procedure.

(g) Reports from domestic users. All users not required to obtain a wastewater discharge permit shall provide appropriate reports to the director as the director may require, in writing.

(h) Notice of violation/repeat sampling and reporting. If sampling performed by a user indicates a violation, the user must notify the director within 24 hours of becoming aware of the violation. The user shall also repeat the sampling and analysis and submit the results of the repeat analysis to the director within 30 days after becoming aware of the violation. The user is not required to resample if the authority monitors at the user's facility at least once a month, or if the authority samples between the user's initial sampling and when the user receives the results of this sampling.

(i) Notification of the discharge of hazardous waste.

(1) Any user who commences the discharge of hazardous waste shall notify the authority, the EPA regional waste management division director, and state hazardous waste authorities, in writing, of any discharge into the authority's wastewater system of a substance which, if otherwise disposed of, would be a hazardous waste under 40 CFR 261. Such notification must include the name of the hazardous waste as set forth in 40 CFR 261, the EPA hazardous waste number, and the type of discharge (continuous, batch, or other). If the user discharges more than 100 kilograms of such waste per calendar month to the authority's wastewater system, the notification also shall contain the following information to the extent such information is known and readily available to the user: an identification of the hazardous constituents contained in the wastes, an estimation of the mass and concentration of such constituents in the wastestream discharged during that calendar month, and an estimation of the mass of constituents in the wastestream expected to be discharged during the following 12 months. All notifications must take place no later than 180 days after the discharge commences. Any notification under this subsection need be submitted only once for each hazardous waste discharged. However, notifications of changed conditions must be submitted under the provisions of this article. The notification requirement in this section does not apply to pollutants already reported by users subject to categorical pretreatment standards under the self-monitoring requirements of this article.

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:lumpkin-county/code/whole@2026-06-16-e2d1347c9d

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.