Macon County · Code of Ordinances
Part II - CODE OF ORDINANCES / Chapter 10 - BUILDINGS AND BUILDING REGULATIONS
Sec. 10-14. Temporary structures and uses.
About this text
- As published by Municode, current through 2020-08-20
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
(a) Generally. The building official is authorized to issue a permit for temporary structures and temporary uses. Such permits shall be limited as to time of service, but shall not be permitted for more than 180 days. The building official is authorized to grant one written extension of 90 days. The request for extension shall be in writing and shall specify the justifiable cause.
(b) Conformance. Temporary structures and uses shall conform to the structural strength, fire safety, means of egress, accessibility, light, ventilation and sanitary requirements of this chapter as necessary to ensure the public health, safety and general welfare.
(c) Temporary power. The building official is authorized to give permission to temporarily supply and use power in part of an electric installation before such installation has been fully completed and the final certificate of completion or occupancy has been issued. The part covered by the temporary certificate shall comply with the requirements specified for temporary lighting, heat or power in the National Electrical Code.
(d) Termination of approval. The building official is authorized to terminate such permit for a temporary structure or use and to order the temporary structure or use to be discontinued for violation of the code or applicable state or federal law.
History
(Ord. of 3-1-2011(03), § 1-14)
Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.