Macon County · Code of Ordinances
Part II - CODE OF ORDINANCES / Chapter 14 - ENVIRONMENT / Article IV - RIVER CORRIDOR PROTECTION / Division 4 - VARIANCES
Sec. 14-395. Procedure.
About this text
- As published by Municode, current through 2020-08-20
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Application for variance shall be filed with the permitting officer; such application must be filed 30 days before the date of the next county commissioner meeting in order that the required public notice may be given before the next scheduled meeting. Each application shall be accompanied by a simple sketch of the site, showing the following:
(1) General location of the proposed structure as well as existing structures;
(2) Location in relation to river corridor;
(3) Such other data as needed for determination of variance.
History
(Ord. of 2-18-1999(03), § 9.2)
Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.