Skip to content
Georgia Commons
Menu

Macon County · Code of Ordinances

Part II - CODE OF ORDINANCES / Chapter 42 - TOWERS AND ANTENNAS / Article II - REQUIREMENTS

Sec. 42-29. Principal or accessory use.

About this text

  • As published by Municode, current through 2020-08-20
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

A tower and/or antenna is considered a principal use if located on any lot or parcel of land as the sole or primary structure, and is considered an accessory use if located on a lot or parcel shared with a different existing primary use or existing structure. An existing use or structure on the same lot or parcel shall not preclude the installation of an antenna or tower. For purposes of determining whether the installation of a tower or antenna complies with zoning district requirements, including but not limited to setback, buffer and other requirements, the dimensions of the entire lot or parcel shall control, even though the antenna or tower may be located on a leased area within such lot or parcel. Towers that are constructed, and antennas that are installed, in accordance with the provisions of this article shall not be deemed to constitute the expansion of a nonconforming use or structure.

History

The history line the source prints at the end of the section.

(Ord. of 3-1-2005, § 108-51)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:macon-county/code/42-29@2020-08-20-3358d254e5

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Macon County Code of Ordinances, Sec. 42-29. Principal or accessory use | Georgia Commons