Skip to content
Georgia Commons
Menu

Madison County · Code of Ordinances

Madison County Code of Ordinances

This document is shown whole, as one text: its source does not cut it into sections.

About this text

  • As published by Municode, current through 2025-06-30
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Part 3 of 5. This text is long, so its page prints it in parts, in the source's order. A link to one of its paragraphs leads to the part that holds it.

(1) For the first and second violations of the provisions of this article, the director or the issuing authority shall issue a written warning to the violator. The violator shall have five days to correct the violation. If the violation is not corrected within five days, the director or the issuing authority shall issue a stop work order requiring that land disturbing activities be stopped until necessary corrective action or mitigation has occurred; provided, however, that, if the violation presents an imminent threat to public health or waters of the state or if the land disturbing activities are conducted without obtaining the necessary permit, the director or issuing

authority shall issue an immediate stop work order in lieu of a warning;

(2) For a third and each subsequent violation, the director or issuing authority shall issue an immediate stop work order; and

(3) All stop work orders shall be effective immediately upon issuance and shall be in effect until the necessary corrective action or mitigation has occurred.

(c) Bond forfeiture. If, through inspection, it is determined that a person engaged in land disturbing activities has failed to comply with the approved plan, a written notice to comply shall be served upon that person. The notice shall set

forth the measures necessary to achieve compliance with the plan and shall state the time within which such measures must be completed. If the

person engaged in the land disturbing activity fails to comply within the time specified, he shall be deemed in violation of this article and, in

addition to other penalties, shall be deemed to have forfeited his performance bond, if required to post one under the provisions of section 26- 104(b)(5)b. The issuing authority may call the bond or any part thereof to be forfeited and may use the proceeds to hire a contractor to stabilize the site of the land disturbing activity and bring it into compliance.

(d) Monetary penalties.

(1) Except as provided in subsection (2) of this subsection, any person who violates any provisions of this article, the rules and regulations adopted pursuant hereto, or any permit condition or limitation established pursuant to this article or who negligently or intentionally fails or refuses to comply with any final or emergency order of the director issued as provided in this article shall be liable for a civil penalty not to exceed $2,500.00 per

day. For the purpose of enforcing the provisions of this article, notwithstanding any provisions in any city charter to the contrary, municipal courts shall be authorized to impose penalty not to exceed $2,500.00 for each violation. Notwithstanding any limitation of law as to penalties which can be assessed for violations of

county ordinances, any magistrate court or any other court of competent jurisdiction trying cases brought as violations of this article under county ordinances approved under this article shall be authorized to impose penalties for such violations not to exceed $2,500.00 for each violation or failure or refusal to comply

continues shall be a separate violation.

(2) The following penalties shall apply to land disturbing activities performed in violation of any provision of this ordinance, any rules and regulations adopted pursuant hereto, or any permit condition

or limitation established pursuant to this article;

a. There shall be a minimum penalty of $250.00 per day for each violation involving the construction of a singlefamily dwelling by or under contract with the owner for his own occupancy; and;

b. There shall be a minimum penalty of $1,000.00 per day for each violation involving land disturbing activities other than as provided in subsection

a. of this section.

(Ord. of 10-1-2001, § VII) Sec. 26-107. Administrative appeal; judicial review.

(a) Administrative remedies. The suspension, revocation, modification or grant with the condition of a permit by the issuing authority upon finding that the holder is not in compliance with

the approved erosion and sediment control plan;

or that the holder is in violation of the permit conditions; or that the holder is in violation of any ordinance; shall entitle the person submitting the plan or holding the permit to a hearing before the magistrate court within 30 days after receipt by

the issuing authority of written notice of appeal.

(b) Judicial review. Any person, aggrieved by a decision or order of the issuing authority, after exhausting his administrative remedies, shall have the right to appeal denovo to the superior court of the county.

(Ord. of 10-1-2001, § VIII) Sec. 26-108. Liability.

(a) Neither the approval of a plan under the provisions of this article, nor the compliance with provisions of this article shall relieve any person from the responsibility for damage to any person

or property otherwise imposed by law nor impose any liability upon the issuing authority or district for damage to any person or property.

(b) The fact that a land-disturbing activity for which a permit has been issued results in injury to the property of another shall neither constitute proof of nor create a presumption of a violation of the standards provided for in this article or the

terms permit.

(c) No provision of this article shall permit any persons to violate the Georgia Erosion and Sedimentation Act of 1975 (O.C.G.A. § 12-7-1 et seq.), the Georgia Water Quality Control Act (O.C.G.A. § 12-5-20 et seq.) or the rules and regulations promulgated and approved thereunder or pollute any waters of the state as defined thereby.

(Ord. of 10-1-2001, § IX) Secs. 26-109—26-120. Reserved.

ARTICLE V. STANDARDS FOR OUTDOOR

WATERING OF LANDSCAPE

Sec. 26-121. Restriction on outdoor water of landscape.

Outdoor watering for purposes of planting, growing, managing, or maintaining groundcover, trees, shrubs, or other plants in the unincorporated area may occur only between the hours of 4:00

p.m. and 10:00 a.m.; provided, however, that this limitation shall not create any limitation upon the following outdoor water uses:

(1) Commercial raising, harvesting, or storing of crops; feeding, breeding, or managing livestock or poultry; the commercial production or storing of feed for use in

the production of livestock, including, but not limited to, cattle, calves, swine, hogs, goats, sheep, and rabbits, or for use in the production of poultry, including, but not limited to, chickens, hens, ratites, and turkeys; producing plants, trees, fowl, or animals; or the commercial

production of aquacultural, horticultural, dairy, livestock, poultry, eggs, and apiarian products or as otherwise defined in

O.C.G.A. § 1-3-3;

(2) Capture and reuse of cooling system condensate or stormwater in compliance with applicable ordinances and state guidelines;

(3) Reuse of gray water in compliance with O.C.G.A. § 31-3-5.2 and applicable local board of health regulations;

(4) Use of reclaimed wastewater by a designated user from a system permitted by the Environmental Protection Division of the Georgia Department of Natural Resources to provide reclaimed

wastewater;

(5) Watering personal food gardens;

(6) Watering new and replanted plant, seed, or turf in landscapes, golf courses, or sports turf fields during installation and for a period of 30 days immediately following the date of installation;

(7) Drip irrigation or irrigation using soaker hoses;

(8) Hand watering with a hose with automatic cutoff or handheld container;

(9) Use of water withdrawn from private water wells or surface water by an owner or operator of property if such well or surface water is on said property;

(10) Watering horticultural crops held for sale, resale, or installation;

(11) Watering athletic fields, golf courses, or public turf grass recreational areas;

(12) Installation, maintenance, or calibration of irrigation systems; or

(13) Hydroseeding.

(Ord. of 10-4-2010(4), § 1) Sec. 26-122. Enforcement.

(a) No person shall use or allow the use of water in violation of the restrictions on outdoor water use contained in ordinance.

(b) The code enforcement department shall be the enforcement authority for this article. The chairman of the board of commissioners may also authorize other departments as may be deemed necessary to support enforcement.

(c) Criminal and alternative penalties. Any violation of this section may also be enforced by a citation or accusation returnable to the magistrate court or by any other legal means as set forth in

this Code.

(Ord. of 10-4-2010(4), § 2) Secs. 26-123—26-130. Reserved.

ARTICLE VI. ILLICIT DISCHARGE AND

DETECTION AND ELIMINATION

Sec. 26-131. General provisions.

(a) Purpose and intent. The purpose of this article is to protect the public health, safety, environment and general welfare through the regulation of non-stormwater discharges to the county separate storm sewer system to the maximum extent practicable as required by federal law. This article establishes methods for controlling the introduction of pollutants into the county separate storm sewer system in order to comply

with requirements of the National Pollutant Discharge Elimination System (NPDES) permit process. The objectives of this article are to:

(1) Regulate the contribution of pollutants to the county separate storm sewer system by any person;

(2) Prohibit illicit discharges and illegal connections to the county separate storm sewer system;

(3) Prevent non-stormwater discharges, generated as a result of spills, inappropriate dumping or disposal, to the county separate storm sewer system; and

(4) To establish legal authority to carry out all inspection, surveillance, monitoring and enforcement procedures necessary to ensure compliance with this article.

(b) Applicability. Notwithstanding anything to the contrary herein, the provisions of this article shall apply in, and only in, the portions of Madison County deemed by the Georgia Department of Natural Resources as subject to MS4 regulation.

(c) Compatibility with other regulations. This article is not intended to modify or repeal any other ordinance, rule, regulation, other provision of law. The requirements of this article are in

addition to the requirements of any other ordinance, rule, regulation, or other provision of law, and where any provision of this article

imposes restrictions different from those imposed by any other ordinance, rule, regulation, or other provision of law, whichever provision is more

restrictive or imposes higher protective standards for human health or the environment shall control.

(d) Severability. If the provisions of any section, subsection, paragraph, subdivision or clause of this article shall be adjudged invalid by a

court of competent jurisdiction, such judgment shall not affect or invalidate the remainder of any section, subsection, paragraph, subdivision or clause of this article.

(e) Responsibility for administration. The Madison County Building and Zoning Department (B&Z) shall administer, implement, and enforce the provisions of this article.

(Ord. of 7-27-2015(1)) Sec. 26-132. Definitions.

[The following words, terms and phrases, when used in this article, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning:]

Accidental discharge means a discharge prohibited by this article which occurs by chance and without planning or thought prior to occurrence.

Clean Water Act means the Federal Water Pollution Control Act (33 U.S.C. § 1251 et seq.), and any subsequent amendments thereto.

Construction activity means activities subject to the Georgia Erosion and Sedimentation Control Act or NPDES general construction permits.

these include construction projects resulting in land disturbance. Such activities include, but are not limited to, clearing and grubbing, grading, excavating, and demolition.

County separate storm sewer system means any facility designed or used for collecting and/or conveying stormwater, including, but not limited

to, any roads with drainage systems, highways, county roads, curbs, gutters, inlets, catch basins, piped storm drains, pumping facilities, structural stormwater controls, ditches, swales, natural

and manmade or altered drainage channels, reservoirs, and other drainage structures, and which is:

(1) Owned or maintained by the Madison County;

(2) Not a combined sewer; and

(3) Not part of a publicly owned treatment works.

Illegal connection means either of the following:

(1) Any pipe, open channel, drain or conveyance, whether on the surface or subsurface, which allows an illicit

discharge to enter the storm drain system including, but not limited to, any conveyances which allow any non-stormwater discharge including sewage, process

wastewater, and wash water to enter the storm drain system, regardless of whether such pipe, open channel, drain or conveyance has been previously allowed, permitted, or approved by an authorized enforcement agency; or

(2) Any pipe, open channel, drain or conveyance connected to the county separate storm sewer system which has not been

documented in plans, maps, or equivalent records and approved by an authorized enforcement agency.

Illicit discharge means any direct or indirect non-stormwater discharge to the county separate storm sewer system, except as exempted in section 26-133 of this article.

Industrial activity means activities subject to NPDES industrial permits as defined in 40 CFR, Section 122.26 (b)(14).

National Pollutant Discharge Elimination System (NPDES) stormwater discharge permit means a permit issued by the Georgia EPD under authority delegated pursuant to 33 USC § 1342(b) that authorizes the discharge of pollutants to waters of the United States, whether the permit is applicable on an individual, group, or

general area-wide basis.

Non-stormwater discharge means any discharge to the storm drain system that is not composed entirely of stormwater.

Person means, except to the extent exempted from this article, any individual, partnership, firm, association, joint venture, public or private corporation, trust, estate, commission, board,

public or private institution, utility, cooperative, city, county or other political subdivision of the state, any interstate body or any other legal

entity.

Pollutant means anything which causes or contributes to pollution. Pollutants may include, but are not limited to: paints, varnishes, and solvents; petroleum hydrocarbons; automotive fluids; cooking grease; detergents (biodegradable or otherwise); degreasers; cleaning chemicals;

non-hazardous liquid and solid wastes and yard wastes; refuse, rubbish, garbage, litter, or other discarded or abandoned objects and accumulations, so that same may cause or contribute to pollution; floatables; pesticides, herbicides, and fertilizers; liquid and solid wastes; sewage, fecal coliform and pathogens; dissolved and particulate

metals; animal wastes; wastes and residues that result from constructing a building or structure;

concrete and cement; and noxious or offensive matter of any kind.

Pollution means the contamination or other alteration of any water's physical, chemical or biological properties by the addition of any constituent and includes, but is not limited to, a change in temperature, taste, color, turbidity, or odor of such waters, or the discharge of any

liquid, gaseous, solid, radioactive, or other substance into any such waters as will or is likely to create a nuisance or render such waters harmful, detrimental or injurious to the public health, safety, welfare, or environment, or to domestic, commercial, industrial, agricultural, recreational, or other legitimate beneficial uses, or to livestock, wild animals, birds, fish or other aquatic life.

Premises mean any building, lot, parcel of land, or portion of land whether improved or unimproved including adjacent sidewalks and parking strips.

State Waters means any and all rivers, streams, creeks, branches, lakes, reservoirs, ponds, drainage systems, springs, wells, and other bodies of surface and subsurface water, natural or artificial, lying within or forming a part of the boundaries

of the State of Georgia which are not entirely confined and retained completely upon the property of a single person.

Stormwater runoff or stormwater means any surface flow, runoff, and drainage consisting entirely of water from any form of natural precipitation, and resulting from such precipitation.

Structural stormwater control means a structural stormwater management facility or device that controls stormwater runoff and changes the characteristics of that runoff including, but not limited to, the quantity and quality, the period of release or the velocity of flow.

(Ord. of 7-27-2015(1)) Sec. 26-133. Prohibitions.

(a) Prohibition of illicit discharges. No person shall throw, drain, or otherwise discharge, cause, or allow others under its control to throw, drain, or otherwise discharge into the county separate

storm sewer system any pollutants or waters containing any pollutants, other than stormwater.

The following discharges are exempt from the prohibition provision above:

(1) Water line flushing performed by a government agency, other potable water sources, landscape irrigation or lawn watering,

diverted stream flows, rising groundwater, groundwater infiltration to storm drains, uncontaminated pumped groundwater, foundation or footing drains (not including active groundwater dewatering systems), crawl space pumps, air

conditioning condensation, springs, natural riparian habitat or wetland flows, and any other water source not containing pollutants;

(2) Discharges or flows from firefighting and other discharges specified in writing by B&Z as being necessary to protect public health and safety;

(3) The prohibition provision above shall not apply to any non-stormwater discharge permitted under an NPDES permit or order issued to the discharger and administered under the authority of the State and the Federal Environmental Protection Agency, provided that the discharger is in full compliance with all requirements of the permit, waiver, or order and other applicable laws and regulations, and provided that written approval has been granted for any discharge to the county separate storm sewer system.

(b) Prohibition of illegal connections. The construction, connection, use, maintenance or continued existence of any illegal connection to the county separate storm sewer system is prohibited.

(1) This prohibition expressly includes, without limitation, illegal connections made in the past, regardless of whether the connection was permissible under law or practices applicable or prevailing at the time of connection.

(2) A person violates this article if the person connects a line conveying sewage to the county separate storm sewer system, or allows such a connection to continue.

(3) Improper connections in violation of this article must be disconnected and redirected, if necessary, to an approved onsite wastewater management system or the sanitary sewer system upon approval of the B&Z.

(4) Any drain or conveyance that has not been documented in plans, maps or equivalent, and which may be connected to the storm sewer system, shall be located by the owner or occupant of that property upon receipt of written notice of violation from the B&Z requiring that such locating be completed. Such notice will specify a reasonable time period within which

the location of the drain or conveyance is to be completed, that the drain or conveyance be identified as storm sewer, sanitary sewer or other, and that the outfall location or point of connection to the storm sewer system, sanitary sewer system or

other discharge point be identified.

Results of these investigations are to be documented and provided to the B&Z.

(Ord. of 7-27-2015(1)) Sec. 26-134. Industrial or construction activity discharges.

Any person subject to an industrial or construction activity NPDES stormwater discharge permit shall comply with all provisions of such permit.

Proof of compliance with said permit may be required in a form acceptable to B&Z.

(Ord. of 7-27-2015(1)) Sec. 26-135. Access and inspection of properties and facilties.

The B&Z shall be permitted to enter and inspect properties and facilities at reasonable times as often as may be necessary to determine compliance with this article.

(1) If a property or facility has security measures in force which require proper identification and clearance before entry into its premises, the owner or operator shall make the necessary arrangements to allow access to representatives of the B&Z.

(2) The owner or operator shall allow the B&Z ready access to all parts of the premises for the purposes of inspection, sampling, photography, videotaping, examination and copying of any records that are required under the conditions of an NPDES permit to discharge stormwater.

(3) The B&Z shall have the right to set up on any property or facility such devices as are necessary in the opinion of the B&Z to conduct monitoring and/or sampling of flow discharges.

(4) The B&Z may require the owner or operator to install monitoring equipment and perform monitoring as necessary, and

make the monitoring data available to the B&Z. This sampling and monitoring equipment shall be maintained at all times in a safe and proper operating condition by the owner or operator at his/her own expense. All devices used to measure flow and quality shall be calibrated to ensure their accuracy.

(5) Any temporary or permanent obstruction to safe and easy access to the property or facility to be inspected and/or sampled shall be promptly removed by the owner or operator at the written or oral request of the B&Z and shall not be replaced.

The costs of clearing such access shall be borne by the owner or operator.

(6) Unreasonable delays in allowing the B&Z access to a facility is a violation of this article.

(7) If the B&Z has been refused access to any part of the premises from which stormwater is discharged, and the B&Z is able to demonstrate probable cause to believe that there may be a violation of this article, or that there is a need to inspect and/or sample as part of a routine inspection and sampling program designed to verify compliance with this article or any order issued hereunder, or to protect the overall public health, safety, environment and welfare of the community, then the B&Z may seek issuance of a search

warrant from any court of competent jurisdiction.

(Ord. of 7-27-2015(1)) Sec. 26-136. Notification of accidental discharges and spills.

Notwithstanding other requirements of law, as soon as any person responsible for a facility, activity or operation, or responsible for emergency response for a facility, activity or operation has information of any known or suspected release of

pollutants or non-stormwater discharges from that facility or operation which are resulting or may result in illicit discharges or pollutants discharging into stormwater, the county separate storm sewer system, State Waters, or Waters of the U.S., said person shall take all necessary steps to ensure the discovery, containment, and cleanup of such release so as to minimize the effects of the discharge.

Said person shall notify the authorized enforcement agency in person or by phone, facsimile or in person no later than 24 hours of the nature,

quantity and time of occurrence of the discharge.

Notifications in person or by phone shall be confirmed by written notice addressed and mailed to the B&Z within three business days of the phone or in person notice. If the discharge of prohibited materials emanates from a commercial or industrial establishment, the owner or operator of such establishment shall also

retain an on-site written record of the discharge and the actions taken to prevent its recurrence.

Such records shall be retained for at least three years. Said person shall also take immediate steps to ensure no recurrence of the discharge or spill.

In the event of such a release of hazardous materials, emergency response agencies and/or other appropriate agencies shall be immediately notified.

Failure to provide notification of a release as provided above is a violation of this article.

(Ord. of 7-27-2015(1)) Sec. 26-137. Violations, enforcement and penalties.

(a) Violations. It shall be unlawful for any person to violate any provision or fail to comply with any of the requirements of this article. Any person who has violated or continues to violate the provisions of this article, may be subject to the enforcement actions outlined in this section or may be restrained by injunction or otherwise abated in a manner provided by law.

In the event the violation constitutes an immediate danger to public health or public safety, the B&Z is authorized to enter upon the subject private property, without giving prior notice, to take any and all measures necessary to abate the violation and/or restore the property.

The B&Z is authorized to seek costs of the abatement as outlined in Section 7.5.

(b) Notice of violation. Whenever the B&Z finds that a violation of this article has occurred, the B&Z may order compliance by written notice

of violation.

(1) The notice of violation shall contain:

a. The name and address of the alleged violator;

b. The address when available or a description of the building, structure or land upon which the violation is occurring, or has occurred;

c. A statement specifying the nature of the violation;

d. A description of the remedial measures necessary to restore compliance with this article and a time schedule for the completion of such remedial action;

e. A statement of the penalty or penalties that shall or may be assessed against the person to whom the

notice of violation is directed; and,

f. A statement that the determination of violation may be appealed to the Madison County Board of Commissioners by filing a written notice of appeal within 30 days of service of

notice of violation.

(2) Such notice may require without limitation:

a. The performance of monitoring, analyses, and reporting;

b. The elimination of illicit discharges and illegal connections;

c. That violating discharges, practices, or operations shall cease and desist;

d. The abatement or remediation of stormwater pollution or contamination hazards and the restoration of any affected property;

e. Payment of costs to cover administrative and abatement costs; and

f. The implementation of pollution prevention practices.

(c) Appeal of notice of violation. Any person receiving a notice of violation may appeal the determination of the B&Z. The notice of appeal must be received within 30 days from the date of the notice of violation. Hearing on the appeal before the Madison County Board of Commissioners or his/her designee shall take place within 15 days from the date of receipt of the notice of

appeal. The decision of the appropriate authority or their designee shall be final.

(d) Enforcement measures after appeal. If the violation has not been corrected pursuant to the requirements set forth in the notice of violation, or, in the event of an appeal, within ten days of

the decision of the appropriate authority upholding the decision of the B&Z, then representatives of the B&Z may enter upon the subject private

property and are authorized to take any and all measures necessary to abate the violation and/or restore the property. It shall be unlawful for any person, owner, agent or person in possession of

any premises to refuse to allow the government agency or designated contractor to enter upon the premises for the purposes set forth above.

(e) Costs of abatement of the violation. Within 30 days after abatement of the violation, the owner of the property will be notified of the cost of abatement, including administrative costs.

The property owner may file a written protest objecting to the assessment or to the amount of the assessment within 30 days of such notice. If the amount due is not paid within 30 days after receipt of the notice, or if an appeal is taken, within 30 days after a decision on said appeal, the charges shall become a special assessment against the property and shall constitute a lien on the property for the amount of the assessment.

Any person violating any of the provisions of this article shall become liable to the Madison County Board of Commissioners by reason of such violation.

(f) Civil penalties. In the event the alleged violator fails to take the remedial measures set forth in the notice of violation or otherwise fails to cure the violations described therein within

ten days, or such greater period as the B&Z shall deem appropriate, after the B&Z has taken one or more of the actions described above, the B&Z may impose a penalty not to exceed $1,000.00 (depending on the severity of the violation) for each day the violation remains unremedied after receipt of the notice of violation.

(g) Criminal penalties. For intentional and flagrant violations of this article, the B&Z may issue a citation to the alleged violator requiring such person to appear in Madison County

Magistrate Court court to answer charges for such violation. Upon conviction, such person shall be punished by a fine not to exceed $1,000.00 or imprisonment for 60 days or both. Each act of

violation and each day upon which any violation shall occur shall constitute a separate offense.

(h) Violations deemed a public nuisance. In addition to the enforcement processes and penalties provided, any condition caused or permitted to exist in violation of any of the provisions of

this article is a threat to public health, safety, welfare, and environment and is declared and

deemed a nuisance, and may be abated by injunctive or other equitable relief as provided by law.

(i) Remedies not exclusive. The remedies listed in this article are not exclusive of any other remedies available under any applicable federal, state or local law and the B&Z may seek cumulative remedies.

(j) Recovery of costs. The B&Z may recover attorney's fees, court costs, and other expenses associated with enforcement of this article, including sampling and monitoring expenses.

(Ord. of 7-27-2015(1)) Secs. 26-138—26-140. Reserved.

ARTICLE VII. WATERCRAFT FOR HIRE

AND USE ON THE HUDSON AND BROAD

RIVERS

Sec. 26-141. Definitions.

(a) As used herein, a watercraft is any vessel that travels on water, including but not limited to tubes, canoes, kayaks, sit-upons, and inflatable boats.

(b) As used herein, a company is any individual or business entity that provides watercraft to members of the public for use on the Broad River or the Hudson River within the unincorporated area of Madison County, Georgia.

(Ord. of 8-7-2017(1)) Sec. 26-142. Coolers and drink containers.

(a) It shall be unlawful for any company to permit any customer of the company to use or possess any cooler, bottle, or other drink container in or upon the Broad River or the Hudson River,

except as provided herein below. Prohibited items include, without limitation, containers made of glass, plastic, paper, styrofoam, or metal, and containers known as cups, bottles, or cans.

(b) One plastic or metal bottle not to exceed

2.0 liters in size per person is permitted on the river. Further, the company may permit larger or multiple containers and/or coolers if it reasonably determines that a customer has specific medical or physical needs that require such

exception. The company shall station at least one employee at each of its river put-in point(s) to ensure compliance with this article.

(Ord. of 8-7-2017(1)) Sec. 26-143. Required signage.

Every company shall clearly state on its waiver form signed by each customer when purchasing a ticket, and shall post signs at the ticket sale area and all entrances to the river, the following:

NO PERSON SHALL USE OR POSSESS ANY

COOLER OR DRINK CONTAINER ON THE

RIVER.

(Except for one plastic or metal bottle of 2.0 liters or less, or as otherwise approved for specific medical/physical needs.)

NO GLASS CONTAINERS

NO LITTERING, O.C.G.A. § 16-7-43

NO NUDITY

DO NOT LEAVE THE RIVER EXCEPT AT A

DESIGNATED TAKEOUT!

If you exit your boat you will be on PRIVATE

PROPERTY!

GEORGIA LAW DOES NOT EXTEND THE

RIGHT TO TRAVEL ON PRIVATE PROPERTY!

The sign posted at the ticket sales counter shall be at least 16" × 16" and the sign posted at the entrances to the river shall be metal and

shall measure at least 24" × 36".

(Ord. of 8-7-2017(1)) Sec. 26-144. River clean-up.

Every company shall, on a weekly basis, direct its employees, in such numbers as are reasonably necessary, to remove litter from the Broad River and the Hudson River and the river banks

of each river between the location in the north where US Highway 29 crosses each river and the location in the south where Georgia Hwy, 172 crosses the Broad River. This requirement applies between March 1 and October 31.

(Ord. of 8-7-2017(1)) Secs. 26-145—26-170. Reserved.

ARTICLE VIII. STORMWATER

ORDINANCE

DIVISION 1. GENERAL PROVISIONS

Sec. 26-171. Purpose and intent.

The purpose of this article is to protect, maintain and enhance the public health, safety, environment and general welfare by establishing minimum requirements and procedures to control the adverse effects of increased postdevelopment stormwater runoff and nonpoint source pollution associated with new development and redevelopment. It has been determined that proper management of post-development

stormwater runoff will minimize damage to public and private property and infrastructure, safeguard the public health, safety, environment and general welfare of the public, and protect water and

aquatic resources. This article seeks to meet that purpose through the following objectives:

(1) Establish decision-making processes surrounding land development activities that protect the integrity of the watershed

and preserve the health of water resources;

(2) Require that new development and redevelopment maintain the pre-development hydrologic response in their postdevelopment state as nearly as practicable in order to reduce flooding, streambank

erosion, nonpoint source pollution and increases in stream temperature, and maintain the integrity of stream channels and aquatic habitats;

(3) Establish minimum post-development stormwater management standards and design criteria for the regulation and control of stormwater runoff quantity and quality;

(4) Establish design and application criteria for the construction and use of structural stormwater control facilities that can be used to meet the minimum post-development stormwater management standards;

(5) Encourage the use of nonstructural stormwater management and stormwater better site design practices, such as the preservation of greenspace and other conservation areas, to the maximum extent practicable. Coordinate site design plans,

which include greenspace, with the county's greenspace protection plan;

(6) Establish provisions for the long-term responsibility for and maintenance of structural stormwater control facilities and nonstructural stormwater management practices to ensure that they continue to function as designed, are

maintained, and pose no threat to public safety; and,

(7) Establish administrative procedures for the submission, review, approval and disapproval of stormwater management plans, and for the inspection of approved active projects, and long-term follow up.

(Ord. of 2-27-2006(1), § 1(1.1)) Sec. 26-172. Applicability.

(a) This article shall be applicable to all land development, including, but not limited to, site plan applications, subdivision applications, and grading applications, unless exempt pursuant to subsection (b) below. These standards apply to any new development or redevelopment site that meets one or more of the following criteria:

(1) New development that involves the creation of 5,000 square feet or more of impervious cover, or that involves other land development activities of one acre or more;

(2) Redevelopment that includes the creation, addition or replacement of 5,000 square feet or more of impervious cover, or that involves other land development activity of one acre or more;

(3) Any new development or redevelopment, regardless of size, that is defined by the planning and zoning director to be a hotspot land use; or,

(4) Land development activities that are smaller than the minimum applicability criteria set forth in subsections (1) and

(2) above if such activities are part of a larger common plan of development, even though multiple, separate and distinct land development activities may take place at different times on different schedules.

(b) The following activities are exempt from this article:

(1) Individual single-family or duplex residential lots that are not part of a subdivision or phased development project;

(2) Additions or modifications to existing single-family or duplex residential structures;

(3) Agricultural or silvicultural land management activities within areas zoned for these activities; and,

(4) Repairs to any stormwater management facility or practice deemed necessary by the planning and zoning director.

(Ord. of 2-27-2006(1), § 1(1.2)) Sec. 26-173. Designation of ordinance administrator.

The planning and zoning director or his/her designee is hereby appointed to administer and implement the provisions of this article.

(Ord. of 2-27-2006(1), § 1(1.3)) Sec. 26-174. Compatibility with other regulations.

This article is not intended to modify or repeal any other ordinance, rule, regulation or other provision of law. The requirements of this article are in addition to the requirements of any other

ordinance, rule, regulation or other provision of law, and where any provision of this article imposes restrictions different from those imposed by any other ordinance, rule, regulation or other provision of law, whichever provision is more restrictive or imposes higher protective standards for human health or the environment shall control.

(Ord. of 2-27-2006(1), § 1(1.4)) Sec. 26-175. Severability.

If the provisions of any section, subsection, paragraph, subdivision or clause of this article shall be adjudged invalid by a court of competent jurisdiction, such judgment shall not affect or invalidate the remainder of any section, subsection, paragraph, subdivision or clause of this article.

(Ord. of 2-27-2006(1), § 1(1.5)) Sec. 26-176. Stormwater design manual.

The planning and zoning department will utilize the policy, criteria and information including technical specifications and standards in the latest edition of the Georgia Stormwater Management Manual and any relevant local addenda for the proper implementation of the requirements

of this article. The manual may be updated and expanded periodically, based on improvements in science, engineering, monitoring and local maintenance experience.

(Ord. of 2-27-2006(1), § 1(1.6)) Sec. 26-177. Definitions.

Applicant means a person submitting a postdevelopment stormwater management application and plan for approval.

Channel means a natural or artificial watercourse with a definite bed and banks that conducts continuously or periodically flowing water.

Conservation easement means an agreement between a land owner and Madison County or other government agency or land trust that permanently protects open space or greenspace on the owner's land by limiting the amount and type of development that can take place, but continues to leave the remainder of the fee interest in private ownership.

Detention means the temporary storage of stormwater runoff in a stormwater management facility for the purpose of controlling the peak discharge.

Detention facility means a detention basin or structure designed for the detention of stormwater runoff and gradual release of stored water at controlled rates.

Developer means a person who undertakes land development activities.

Development means a land development or land development project.

Drainage easement means an easement appurtenant or attached to a tract or parcel of land allowing the owner of adjacent tracts or other persons to discharge stormwater runoff onto the tract or parcel of land subject to the drainage easement.

Erosion and sedimentation control plan means a plan that is designed to minimize the accelerated erosion and sediment runoff at a site during land disturbance activities.

Extended detention means the detention of stormwater runoff for an extended period, typically 24 hours or greater.

Extreme flood protection means measures taken to prevent adverse impacts from large lowfrequency storm events with a return frequency of 100 years or more.

Flooding means a volume of surface water that is too great to be confined within the banks or walls of a conveyance or stream channel and that overflows onto adjacent lands.

Greenspace or open space means permanently protected areas of the site that are preserved in a natural state.

Hotspot means an area where the use of the land has the potential to generate highly contaminated runoff, with concentrations of pollutants in excess of those typically found in stormwater.

Hydrologic soil group (HSG) means a Natural Resource Conservation Service classification system in which soils are categorized into four runoff potential groups. The groups range from group A soils, with high permeability and little runoff produced, to group D soils, which have low permeability rates and produce much more runoff.

Impervious cover means a surface composed of any material that significantly impedes or prevents the natural infiltration of water into soil. Impervious surfaces include, but are not limited to, rooftops, buildings, streets and roads, and any concrete or asphalt surface.

Industrial stormwater permit means a National Pollutant Discharge Elimination System (NPDES) permit issued to an industry or group of industries which regulates the pollutant levels associated

with industrial stormwater discharges or specifies on-site pollution control strategies.

Infiltration means the process of percolating stormwater runoff into the subsoil.

Jurisdictional wetland means an area that is inundated or saturated by surface water or groundwater at a frequency and duration sufficient to support a prevalence of vegetation typically adapted for life in saturated soil conditions, commonly known as hydrophytic vegetation.

Land development means any land change, including, but not limited to, clearing, digging, grubbing, stripping, removal of vegetation, dredging, grading, excavating, transporting and filling of land, construction, paving, and any other

installation of impervious cover.

Land development activities means those actions or activities which comprise, facilitate or result in land development.

Land development project means a discrete land development undertaking.

Inspection and maintenance agreement means a written agreement providing for the long-term inspection and maintenance of stormwater management facilities and practices on a site or with respect to a land development project, which when properly recorded in the deed records constitutes a restriction on the title to a site or other land involved in a land development project.

New development means a land development activity on a previously undeveloped site.

Nonpoint source pollution means a form of water pollution that does not originate from a discrete point such as a sewage treatment plant or industrial discharge, but involves the transport of pollutants such as sediment, fertilizers,

pesticides, heavy metals, oil, grease, bacteria, organic materials and other contaminants from land to surface water and groundwater via mechanisms such as precipitation, stormwater runoff, and leaching. Nonpoint source pollution is a by-product of land use practices such as agricultural, silvicultural, mining, construction, subsurface disposal and urban runoff sources.

Nonstructural stormwater management practice or nonstructural practice means any natural or planted vegetation or other nonstructural component of the stormwater management plan that provides for or enhances stormwater quantity and/or quality control or other stormwater management benefits, and includes, but is not limited to, riparian buffers, open and greenspace areas, overland flow filtration areas, natural depressions, and vegetated channels.

Off-site facility means a stormwater management facility located outside the boundaries of the site.

On-site facility means a stormwater management facility located within the boundaries of the site.

Overbank flood protection means measures taken to prevent an increase in the frequency and magnitude of out-of-bank flooding (i.e. flow events that exceed the capacity of the channel and enter the floodplain), and that are intended to protect downstream properties from flooding for the two-year through 25-year frequency storm events.

Owner means the legal or beneficial owner of a site, including but not limited to, a mortgagee or vendee in possession, receiver, executor, trustee, lessee or other person, firm or corporation in

control of the site.

Permit means the permit issued by the Madison County Planning and Zoning Department to the applicant which is required for undertaking any land development activity.

Person means, except to the extent exempted from this article, any individual, partnership, firm, association, joint venture, public or private corporation, trust, estate, commission, board,

public or private institution, utility, cooperative, city, county or other political subdivision of the state, any interstate body or any other legal

entity.

Post-development refers to the time period, or the conditions that may reasonably be expected or anticipated to exist, after completion of the land development activity on a site as the context may require.

Pre-development refers to the time period, or the conditions that exist, on a site prior to the commencement of a land development project and at the time that plans for the land development of a site are approved by the plan approving authority. Where phased development or plan approval occurs (preliminary grading, roads

and utilities, etc.), the existing conditions at the time prior to the first item being approved or

permitted shall establish pre-development conditions.

Project means a land development project.

Redevelopment means a land development project on a previously developed site, but excludes ordinary maintenance activities, remodeling of

existing buildings, resurfacing of paved areas, and exterior changes or improvements which do not materially increase or concentrate stormwater runoff, or cause additional nonpoint source pollution.

Regional stormwater management facility or regional facility means stormwater management facilities designed to control stormwater runoff from multiple properties, where the owners or developers of the individual properties may assist in the financing of the facility, and the requirement for on-site controls is either eliminated or reduced.

Runoff means stormwater runoff.

Site means the parcel of land being developed, or the portion thereof on which the land development project is located.

Stormwater better site design means nonstructural site design approaches and techniques that can reduce a site's impact on the watershed and

can provide for nonstructural stormwater management. Stormwater better site design includes conserving and protecting natural areas and

greenspace, reducing impervious cover and using natural features for stormwater management.

Stormwater management means the collection, conveyance, storage, treatment and disposal of stormwater runoff in a manner intended to

prevent increased flood damage, streambank channel erosion, habitat degradation and water quality degradation, and to enhance and promote the public health, safety and general welfare.

Stormwater management facility means any infrastructure that controls or conveys stormwater runoff.

Stormwater management measure means any stormwater management facility or nonstructural stormwater practice.

Stormwater management plan means a document describing how existing runoff characteristics will be affected by a land development project and containing measures for complying with the provisions of this article.

Stormwater management system means the entire set of structural and nonstructural stormwater management facilities and practices that are used to capture, convey and control the

quantity and quality of the stormwater runoff from a site.

Stormwater retrofit means a stormwater management practice designed for a currently developed site that previously had either no stormwater management practice in place or a practice inadequate to meet the stormwater management requirements of the site.

Stormwater runoff means the flow of surface water resulting from precipitation.

Structural stormwater control means a structural stormwater management facility or device that controls stormwater runoff and changes the characteristics of that runoff including, but not limited to, the quantity and quality, the period of release or the velocity of flow of

such runoff.

Subdivision means the division of a tract or parcel of land resulting in one or more new lots or building sites for the purpose, whether immediately or in the future, of sale, other transfer of ownership or land development, and includes divisions of land resulting from or made in connection with the layout or development of a new street or roadway or a change in an existing street or roadway.

(Ord. of 2-27-2006(1), § 2) Secs. 26-178—26-200. Reserved.

DIVISION 2. PERMIT PROCEDURES AND

REQUIREMENTS

Sec. 26-201. Permit application requirements.

No owner or developer shall perform any land development activities without first meeting the requirements of this article prior to commencing the proposed activity.

Unless specifically exempted by this article, any owner or developer proposing a land development activity shall submit to the Madison County Planning and Zoning Department a permit

application on a form provided by the planning and zoning department for that purpose.

Unless otherwise exempted by this article, a permit application shall be accompanied by the following items in order to be considered:

(1) Stormwater concept plan and consultation meeting certification in accordance with section 26-202;

(2) Stormwater management plan in accordance with section 26-203;

(3) Inspection and maintenance agreement in accordance with section 26-204, if applicable;

(4) Performance bond in accordance with section 26-205, if applicable; and,

(5) Permit application and plan review fees in accordance with section 26-206.

(Ord. of 2-27-2006(1), § 3(3.1)) Sec. 26-202. Stormwater concept plan and consultation meeting.

Before any stormwater management permit application is submitted, it is recommended that the land owner or developer shall meet with the Madison County Planning and Zoning Department for a consultation meeting on a concept plan for the post-development stormwater

management system to be utilized in the proposed land development project. This consultation meeting shall take place at the time of the preliminary plan of subdivision or other early step in the

development process. The purpose of this meeting is to discuss the post-development stormwaENVIRONMENT § 26-202 ter management measures necessary for the

proposed project, as well as to discuss and assess constraints, opportunities and potential ideas for stormwater management designs before the formal

site design engineering is commenced.

To accomplish this goal the following information shall be included in the concept plan which shall be submitted in advance of the meeting:

(1) Existing conditions/proposed site plans.

Existing conditions and proposed site layout sketch plans, which illustrate at a minimum: existing and proposed topography; perennial and intermittent streams; mapping of predominant soils from soil surveys (when available);

boundaries of existing predominant vegetation and proposed limits of clearing and grading; and location of existing and proposed roads, buildings, parking

areas and other impervious surfaces.

(2) Natural resources inventory. A written or graphic inventory of the natural resources at the site and surrounding area as it exists prior to the commencement of the project. This description should include a discussion of soil conditions, forest cover, topography, wetlands, and other native vegetative areas on the site, as well as the location and boundaries of other natural feature protection and conservation areas such as wetlands, lakes, ponds, floodplains, stream buffers and other setbacks (e.g., drinking water well setbacks, septic setbacks, etc.).

Particular attention should be paid to environmentally sensitive features that provide particular opportunities or constraints for development.

(3) Stormwater management system concept plan. A written or graphic concept plan of the proposed post-development stormwater management system including:

preliminary selection and location of proposed structural stormwater controls;

location of existing and proposed conveyance systems such as grass channels, swales, and storm drains; flow paths;

location of floodplain/floodway limits;

relationship of site to upstream and downstream properties and drainages;

and preliminary location of proposed stream channel modifications, such as bridge or culvert crossings.

Local watershed plans, applicable greenspace projection plans, and any relevant resource protection plans will be consulted in the discussion of the concept plan.

(Ord. of 2-27-2006(1), § 3(3.2)) Sec. 26-203. Stormwater management plan requirements.

The stormwater management plan shall detail how post-development stormwater runoff will be controlled or managed and how the proposed project will meet the requirements of this article, including the performance criteria set forth in

division 3 below.

This plan shall be in accordance with the criteria established in this section and must be submitted with the stamp and signature of a professional engineer (PE) licensed in the State of Georgia, who must verify that the design of all stormwater management facilities and practices

meet the submittal requirements outlined in the submittal checklist(s) found in the stormwater design manual.

The stormwater management plan must ensure that the requirements and criteria in this article are being complied with and that opportunities

are being taken to minimize adverse postdevelopment stormwater runoff impacts from the development. The plan shall consist of maps,

narrative, and supporting design calculations (hydrologic and hydraulic) for the proposed stormwater management system. The plan shall include all of the information required in the stormwater

management site plan checklist found in the stormwater design manual. This includes:

(1) Common address and legal description of site.

(2) Vicinity map.

(3) Existing conditions hydrologic analysis.

The existing condition hydrologic analysis for stormwater runoff rates, volumes, and velocities, which shall include: a topographic map of existing site conditions with the drainage basin boundaries indicated; acreage, soil types and land

cover of areas for each subbasin affected by the project; all perennial and intermittent streams and other surface water features; all existing stormwater conveyances and structural control facilities;

direction of flow and exits from the site;

analysis of runoff provided by off-site areas upstream of the project site; and methodologies, assumptions, site parameters and supporting design calculations used in analyzing the existing conditions site hydrology. For redevelopment sites, predevelopment conditions shall be

modeled using the established guidelines for the portion of the site undergoing land development activities.

(4) Post-development hydrologic analysis. The post-development hydrologic analysis for stormwater runoff rates, volumes, and velocities, which shall include: a topographic map of developed site conditions with the post-development drainage basin boundaries indicated; total area of post-development impervious surfaces

and other land cover areas for each subbasin affected by the project; calculations for determining the runoff volumes that

need to be addressed for each subbasin for the development project to meet the post-development stormwater management performance criteria in division 3;

location and boundaries of proposed natural feature protection and conservation areas; documentation and calculations for any applicable site design credits that are being utilized; methodologies,

assumptions, site parameters and supporting design calculations used in analyzing the existing conditions site hydrology.

If the land development activity on a redevelopment site constitutes more than 50 percent of the site area for the entire site, then the performance criteria in division 3 must be met for the stormwater runoff from the entire site.

(5) Stormwater management system. The description, scaled drawings and design calculations for the proposed post-development stormwater management system, which shall include: A map and/or drawing or sketch of the stormwater management facilities, including the location of nonstructural site design features and

the placement of existing and proposed structural stormwater controls, including design water surface elevations, storage volumes available from zero to maximum head, location of inlet and

outlets, location of bypass and discharge systems, and all orifice/restrictor sizes; a narrative describing how the selected structural stormwater controls will be appropriate and effective; cross-section and profile drawings and design details for each of the structural stormwater controls in the system, including supporting calculations to show that the facility is designed according to the applicable

design criteria; a hydrologic and hydraulic analysis of the stormwater management system for all applicable design storms (including stage-storage or outlet rating curves, and inflow and outflow hydrographs); documentation and supporting calculations to show that the stormwater

management system adequately meets the post-development stormwater management performance criteria in division 3;

drawings, design calculations, elevations and hydraulic grade lines for all existing and proposed stormwater conveyance elements including stormwater drains, pipes, culverts, catch basins, channels, swales

and areas of overland flow; and where applicable, a narrative describing how the stormwater management system corresponds with any watershed protection plans and/or local greenspace protection

plan.

(6) Post-development downstream analysis.

A downstream peak flow analysis which includes the assumptions, results and supporting calculations to show safe passage of post-development design flows downstream. The analysis of downstream

conditions in the report shall address each and every point or area along the project site's boundaries at which runoff will exit the property. The analysis shall focus on the portion of the drainage channel or watercourse immediately downstream from the project. This area shall extend downstream from the project to a point in the drainage basin where the project area is ten percent of the total basin area. In calculating runoff volumes and discharge rates, consideration may need to be given to any planned future upstream land use changes. The analysis shall be in accordance with the stormwater design manual.

(7) Construction-phase erosion and sedimentation control plan. An erosion and sedimentation control plan in accordance with the Georgia Erosion and Sedimentation Control Act or NPDES Permit for Construction Activities. The plan shall also include information on the sequence/phasing of construction and temporary stabilization measures and temporary structures that will be converted into permanent stormwater controls.

(8) Landscaping and open space plan. A detailed landscaping and vegetation plan describing the woody and herbaceous vegetation that will be used within and adjacent to stormwater management facilities and practices. The landscaping plan must also include: the arrangement of planted areas, natural and greenspace areas and other landscaped features on the site plan; information necessary to construct the landscaping elements shown on the plan drawings; descriptions and standards for the methods, materials and vegetation that are to be used in the construction; density of plantings; descriptions of the stabilization and management techniques used to establish vegetation; and a description of who will

be responsible for ongoing maintenance of vegetation for the stormwater management facility and what practices will be employed to ensure that adequate vegetative cover is preserved.

(9) Operations and maintenance plan.

Detailed description of ongoing operations and maintenance procedures for stormwater management facilities and

practices to ensure their continued function as designed and constructed or preserved. These plans will identify the

parts or components of a stormwater management facility or practice that need to be regularly or periodically inspected and maintained, and the equipment and skills or training necessary. The plan shall include an inspection and maintenance schedule, maintenance tasks, responsible parties for maintenance, funding, access and safety issues. Provisions for the periodic review and evaluation of

the effectiveness of the maintenance program and the need for revisions or additional maintenance procedures shall be included in the plan.

(10) Maintenance access easements. The applicant must ensure access from public right-of-way to stormwater management facilities and practices requiring regular maintenance at the site for the purpose of inspection and repair by securing all the maintenance access easements needed on a permanent basis. Such access shall be sufficient for all necessary equipment for maintenance activities. Upon final inspection and approval, a plat or document indicating that such easements exist shall be recorded and shall remain in

effect even with the transfer of title of the property.

(11) Inspection and maintenance agreements.

Unless an on-site stormwater management facility or practice is dedicated to and accepted by Madison County as

provided in section 26-204 below, the applicant must execute an easement and an inspection and maintenance agreement binding on all subsequent owners of land served by an on-site stormwater

management facility or practice in accordance section 26-204.

(12) Evidence of acquisition of applicable local and non-local permits. The applicant shall certify and provide documentation to the Madison County Planning and Zoning Department that all other applicable environmental permits have been acquired for the site prior to approval of the stormwater management plan.

(Ord. of 2-27-2006(1), § 3(3.3)) Sec. 26-204. Stormwater management inspection and maintenance agreements.

(a) Prior to the issuance of any permit for a land development activity requiring a stormwater management facility or practice hereunder and for which Madison County requires ongoing

maintenance, the applicant or owner of the site must, unless an on-site stormwater management facility or practice is dedicated to and accepted by Madison County, execute an inspection and maintenance agreement, and/or a conservation easement, if applicable, that shall be binding on all subsequent owners of the site.

The inspection and maintenance agreement, if applicable, must be in substantially the form set forth in subsection (b) hereof, must be approved by Madison County prior to plan approval, and must be recorded in the deed records upon final plat approval.

Responsibility for the operation and maintenance of the stormwater management facility or practice, unless assumed by a governmental agency, shall

remain with the property owner and shall pass to any successor owner. If portions of the land are sold or otherwise transferred, legally binding arrangements shall be made to pass the inspection and maintenance responsibility to the appropriate successors in title. These arrangements shall designate for each portion of the site, the person to be permanently responsible for its

inspection and maintenance.

In addition to enforcing the terms of the inspection and maintenance agreement. Madison County may also enforce all of the provisions for ongoing inspection and maintenance in division 5 of this

article.

Madison County, in lieu of an inspection and maintenance agreement, may accept dedication of any existing or future stormwater management facility for maintenance, provided such facility meets all the requirements of this article and includes adequate and perpetual access and

sufficient area, by easement or otherwise, for inspection and regular maintenance.

(b) The form of the inspection and maintenance agreement shall be substantially as follows:

MAINTENANCE AGREEMENT

MADISON COUNTY, GEORGIA

WHEREAS, the Property Owner recognizes that the structural and non-structural stormwater management facility or facilities (hereinafter referred to as "the facility" or "facilities") must be maintained for the development called , located in the District, G.M., of Madison County, Georgia, a political subdivision of the State of Georgia (hereinafter called the "County"), located on property presently identified as Parcel , Map , of the official Tax Maps of the County; and

WHEREAS, the Property Owner is the owner of real property more particularly described on the attached Exhibit A (hereinafter referred to as "the Property"), and, WHEREAS, Madison County, Georgia, and the Property Owner, or its administrators, executors, successors, heirs, or assigns, agree that on February 27, 2006, the Chairman and Commission of Madison County, Georgia, adopted the Ordinance for Post-development Stormwater Management for New Development and Redevelopment to protect public health and safety, protection of public and private property and infrastructure, and environmental protection from post-development stormwater runoff quality and quantity impacts resulting from the permanent alteration of the character and hydrology of the land surface as well as the nonpoint source pollution from land use activities, and, WHEREAS, the Development Regulations, of Madison County, Georgia, require that the facility, or facilities as shown on the development plans and specifications submitted after February 27, 2006 be constructed and maintained per the technical criteria and standards of the Georgia Stormwater Management Manual (latest edition) and the Madison County, Georgia, and maintained by the Property Owner, its administrators, executors, successors, heirs, or assigns.

NOW, THEREFORE, in consideration of the foregoing premises, the mutual covenants contained herein, and the following terms and conditions, the parties hereto agree as follows:

SECTION 1

The facility or facilities shall be constructed by the Property Owner in accordance with the approved plans and specifications for the development.

SECTION 2

The Property Owner, its administrators, executors, successors, heirs or assigns shall maintain the facility or facilities in good working condition, determined through site inspection by a representative of the Madison County, Georgia, or its authorized agents, and employees.

SECTION 3

The Property Owner, its administrators, executors, successors, heirs or assigns hereby grants permission to the Madison County, Georgia, its authorized agents and employees, to enter upon the property and to inspect the facilities whenever the County deems necessary. The Property Owner shall execute an access easement in favor of the Madison County, Georgia, to allow the County, or its agents, and employees, to inspect, observe, maintain, and repair the facility as deemed necessary. A fully executed original easement is attached to this Agreement and by reference made a part hereof.

SECTION 4

In the event the Property Owner, its administrators, executors, successors, heirs, or assigns fails to maintain and/or repair the facility or facilities as shown on the approved plans and specifications in good working order, determined through site inspection, by Madison County, Georgia, its authorized agents, and employees, in accordance with the Georgia Stormwater Management Manual (latest edition), the County, with due notice, may enter the property and take whatever steps it deems necessary to return the facility or facilities to good working order. This provision shall not be construed to allow the County to erect any structure of a permanent nature on the property. It is expressly understood and agreed that the County is under no obligation to maintain or repair the facility or facilities and in no event shall this Agreement be construed to impose any such obligation on the County.

SECTION 5

In the event Madison County, Georgia, pursuant to this Agreement, performs work of any nature, or expends any funds in the performance of said work for labor, use of equipment, supplies, materials, and the like, the Property Owner shall reimburse the County, or shall forfeit any required bond upon demand within thirty (30) days of receipt thereof for all the costs incurred by the County hereunder. If not paid within the prescribed time period, the County shall secure a lien against the real property in the amount of such costs. The actions described in this section are in addition to and not in lieu of any and all legal remedies available to the County as a result of the Property Owner's failure to maintain the facility or facilities.

SECTION 6

It is the intent of this agreement to insure the proper maintenance of the facility or facilities by the Property Owner; provided, however, that this Agreement shall not be deemed to create or effect any additional liability of any party for damage alleged to result from or caused by storm water runoff.

SECTION 7

Sediment accumulation resulting from the normal operation of the facility or facilities will be catered for. The Property Owner will make accommodation for the removal and disposal of all accumulated sediments on its own initiative or when requested by Madison County, Georgia. Disposal will be provided onsite in a reserved area(s) or will be removed from the site. Reserved area(s) shall be sufficient to accommodate for a minimum of two dredging cycles.

SECTION 8

At the County's request, the Property Owner shall provide Madison County, Georgia, with a bond, or a letter of credit providing for the maintenance of the facility or facilities pursuant to the Post Development Stormwater Development Ordinance and/or other ordinances/regulations as adopted by the Chairman and Commission of the Madison County, Georgia, concerning Maintenance Agreements.

SECTION 9

The Property Owner shall use the standard Best Management Practice (BMP) Operation and Maintenance Inspection Reports in the Georgia Stormwater Management Manual, or similar reports approved by the Madison County, Georgia, for the purpose of a minimal annual inspection of the facility or facilities, by a qualified inspector.

SECTION 10

The Property Owner, its administrators, executors, successors, heirs and assigns hereby indemnifies and holds harmless Madison County, Georgia, and its authorized agents and employees for any and all damages, accidents, casualties, occurrences or claims which might arise or be asserted against the County from the construction, presence, existence or maintenance of the facility or facilities by the Property Owner, or the County. In the event a claim is asserted against the County, its authorized agents or employees, the County shall promptly notify the Property Owner and the Property Owner shall defend at its own expense any suit based on such claim. If any judgment, or claims against the County, its authorized agents, or employees shall be allowed, the Property Owner shall pay for all costs and expenses in connection herewith.

SECTION 11

This Agreement shall be recorded among the deed records of the Clerk of Superior Court. of Madison County. Georgia, and shall constitute a covenant running with the land and shall be binding on the Property Owner, its administrators, executors, heirs, assigns, and any other successors in interest.

SECTION 12

This Agreement may be enforced by proceedings at law, or in equity by or against the parties hereto and their respective successors in interest.

SECTION 13

Invalidation of any one of the provisions of this Agreement shall in no way effect any other provisions and all other provisions shall remain in full force and effect.

SO AGREED this day of , 20 .

Name of Property Owner:

Address of Property Owner:

By: Attest: Signature Typed or Printed Name Typed or Printed Name Title: Title:

(President or Vice President) (Corporate Secretary or Notary)

(CORPORATE OR NOTARY SEAL)

MADISON COUNTY, GEORGIA

By: Attest:

Director County Clerk

(COUNTY SEAL)

Attachments:

Exhibit A. Plat and Legal Description Exhibit B. General Inspection and Maintenance/Repair Schedule (GSWMM) Exhibit C. Permanent Water Quality BMP and Access Easement Agreement Exhibit D. Inspections. Operation and Maintenance Requirements of Approved Stormwater Control Structure (GSWMM)

Exhibit A. PLAT AND LEGAL DESCRIPTION [Remove this sheet and insert 2 sheets with the following information on them] Sheet # 1:

EXHIBIT A1

(Insert Project Name) Plat will be a drawn plat (8.5 × 11 or 8.5 × 14 size-no larger) of the description(s) given in Exhibit "A2" showing the stormwater facilities and easements in relation to the lots on the final plat.

Sheet # 2:

EXHIBIT A2

(Insert Project Name) All that tract or parcel of land lying and being in the District, G.M., of Madison County, Georgia, located on property presently identified as Parcel , Map , of the official Tax Maps of the County, and being more particularly described as follows:

(Insert legal description of each stormwater facility in relation to the lot(s) where they are located.)

Exhibit B. GENERAL INSPECTION AND MAINTENANCE/REPAIR SCHEDULE [Remove this sheet and insert recommended inspection and maintenance/repair schedule for the Georgia Stormwater Management Design Manual (latest edition) for the specific stormwater management control structure(s) in the project.]

STORMWATER FACILITY COUNTY INSPECTION

FREQUENCY

OWNER MAINTENANCE

FREQUENCY

Wet Pond Once per Year Once per Quarter Year, and after a Major Rain Event (>3")

Dry Pond Once per Year Once per Quarter Year, and after a Major Rain Event (>3")

Constructed Wetlands Once per Year Once per Quarter Year, and after a Major Rain Event (>3")

Filtration Facility Once per Year Once per Quarter Year, and after a Major Rain Event (>3")

Enhanced Swales, Grass Channels and Filter Strips Once per Year Once per Quarter Year, and after a Major Rain Event (>3") Other Stormwater Infrastructure (culverts, pipes, drop inlets, outfalls, etc.)

20% per Year Maintain if > 25% full of debris;

Repairs should be done asap and no more than 30 days unless approval by County is obtained

Exhibit C. PERMANENT WATER QUALITY BMP AND ACCESS EASEMENT AGREEMENT

MADISON COUNTY, GEORGIA

THIS EASEMENT granted this_______________day of______________________, 20_____, between the property owner________________as party of the first part, hereinafter referred to as Grantor, and the Madison County, Georgia, a political subdivision of the State of Georgia, as party of the second part, hereinafter referred to as Grantee.

WITNESSETH THAT: Grantor, for and in consideration of the sum of ONE DOLLAR ($1.00) in hand paid at and before the sealing and delivery of this easement and in consideration of the agreements and covenants contained in this document and the Maintenance Agreement between Grantor and Grantee, hereby grants unto the Grantee a perpetual easement in and to that portion of the property shown on Exhibit "A" to the Maintenance Agreement, as shown and identified on the plat attached hereto as Exhibit "1".

The purpose of this easement is to allow Grantee, or its agents, access for maintenance activities to the Water Quality Best Management Practice (BMP) facility, and to prevent development of the property within the easement following issuance of the Certificate of Occupancy, issued by the Building Inspection Department of Madison County, Georgia, or in the case of a residential subdivision, the approval of the Final Plat, without written permission from the Building Inspection Department of Madison County, Georgia. This easement is required by the provisions of the Maintenance Agreement executed by and between the Grantor and Grantee.

The easement herein granted shall bind the heirs and assigns of the undersigned and shall inure to the benefit of the successors in title of the Grantee.

IN WITNESS WHEREOF, said Grantor(s) has/have hereto set his/her/their hand(s), affixed his/her/their seal(s) and delivered these presents the date first above written.

/s/ (SEAL) Grantor Signed, sealed and delivered in the presence of:

Witness Notary Public

Exhibit D. INSPECTION, OPERATION AND MAINTENANCE REQUIREMENTS OF APPROVED

STORMWATER MANAGEMENT CONTROL STRUCTURE

[To be provided by the Design Engineer based on the GA Stormwater Management Design Manual or Designers of County-approved Proprietary Device] (Ord. of 2-27-2006(1), § 3(3.4); Res. of 3-25-2019, § 1) Sec. 26-205. Reserved.

Sec. 26-206. Application procedure.

(a) Applications for land development permits shall be filed with the Madison County Planning and Zoning Department.

(b) Permit applications shall include the items set forth in section 26-201 above (two copies of the stormwater management plan and the inspection maintenance agreement, if applicable, shall be included).

(c) The Madison County Planning and Zoning Department shall inform the applicant whether the application, stormwater management plan and inspection and maintenance agreement are approved or disapproved.

(d) If either the permit application, stormwater management plan or inspection and maintenance agreement are disapproved, the

Madison County Planning and Zoning Department shall notify the applicant of such fact in writing. The applicant may then revise any item

not meeting the requirements hereof and resubmit the same, in which event subsection (c) above and this subsection shall apply to such resubmittal.

(e) Upon a finding by the Madison County Planning and Zoning Department that the permit application, stormwater management plan and inspection and maintenance agreement, if applicable, meet the requirements of this article, the planning and zoning department may issue a

permit for the land development project, provided all other legal requirements for the issuance of such permit have been met.

(f) Notwithstanding the issuance of the permit, in conducting the land development project, the applicant or other responsible person shall be subject to the following requirements:

(1) The applicant shall comply with all applicable requirements of the approved plan and this article and shall certify that all land clearing, construction, land development and drainage will be done according to the approved plan;

(2) The land development project shall be conducted only within the area specified in the approved plan;

(3) Madison County shall be allowed to conduct periodic inspections of the project;

(4) No changes may be made to an approved plan without review and written approval by the Madison County Planning and Zoning Department; and,

(5) Upon completion of the project, the applicant or other responsible person shall submit the engineer's report and certificate and as-built plans required by section 26-272.

(Ord. of 2-27-2006(1), § 3(3.6)) Sec. 26-207. Application review fees.

The fee for review of any stormwater management application shall be based on the fee structure established by Madison County and

shall be made prior to the issuance of any building permit for the development.

(Ord. of 2-27-2006(1), § 3(3.7)) Sec. 26-208. Modifications for off-site facilities.

The stormwater management plan for each land development project shall provide for stormwater management measures located on the site of the project, unless provisions are made to

manage stormwater by an off-site or regional facility. The off-site or regional facility must be located on property legally dedicated for the

purpose, must be designed and adequately sized to provide a level of stormwater quantity and quality control that is equal to or greater than that which would be afforded by on-site practices and there must be a legally-obligated entity responsible for long-term operation and maintenance of the off-site or regional stormwater facility. In addition, on-site measures shall be implemented, where necessary, to protect

upstream and downstream properties and drainage channels from the site to the off-site facility.

A stormwater management plan must be submitted to the Madison County Planning and Zoning Department which shows the adequacy of the off-site or regional facility.

To be eligible for a modification, the applicant must demonstrate to the satisfaction of the Madison County Planning and Zoning Department that the use of an off-site or regional facility will not result in the following impacts to upstream or downstream areas:

(1) Increased threat of flood damage to public health, life, and property;

(2) Deterioration of existing culverts, bridges, dams, and other structures;

(3) Accelerated streambank or streambed erosion or siltation;

(4) Degradation of in-stream biological functions or habitat; or

(5) Water quality impairment in violation of State water quality standards, and/or violation of any state or federal regulations.

(Ord. of 2-27-2006(1), § 3(3.8)) Secs. 26-209—26-239. Reserved.

DIVISION 3. POST-DEVELOPMENT

STORMWATER MANAGEMENT

PERFORMANCE CRITERIA

Sec. 26-240. [Performance criteria.]

The following performance criteria shall be applicable to all stormwater management plans, unless otherwise provided for in this article.

(Ord. of 2-27-2006(1), § 4) Sec. 26-241. Water quality.

All stormwater runoff generated from a site shall be adequately treated before discharge. It will be presumed that a stormwater management system complies with this requirement if:

(1) It is sized to treat the prescribed water quality treatment volume from the site, as defined in the Georgia Stormwater Management Manual;

(2) Appropriate structural stormwater controls or nonstructural practices are selected, designed, constructed or preserved, and maintained according to the specific criteria in the Georgia Stormwater Management Manual; and,

(3) Runoff from hotspot land uses and activities identified by the Madison County Planning and Zoning Department are

adequately treated and addressed through the use of appropriate structural stormwater controls, nonstructural practices and pollution prevention practices.

(Ord. of 2-27-2006(1), § 4(4.1)) Sec. 26-242. Stream channel protection.

Protection of stream channels from bank and bed erosion and degradation shall be provided by using all of the following three approaches:

(1) Preservation, restoration and/or reforestation (with native vegetation) of the applicable stream buffer;

(2) Twenty-four hour extended detention storage of the one-year, 24-hour return frequency storm event;

(3) Erosion prevention measures such as energy dissipation and velocity control.

(Ord. of 2-27-2006(1), § 4(4.2)) Sec. 26-243. Overbank flooding protection.

Downstream overbank flood and property protection shall be provided by controlling (attenuating) the post-development peak discharge rate to the pre-development rate for the 25-year, 24-hour return frequency storm event. If control of the one-year, 24-hour storm under section 26-242 is exempted, then peak discharge rate attenuation of the two-year through the 25-year return frequency storm event must be provided.

(Ord. of 2-27-2006(1), § 4(4.3)) Sec. 26-244. Extreme flooding protection.

Extreme flood and public safety protection shall be provided by controlling and safely conveying the 100-year, 24 hour return frequency storm event such that flooding is not exacerbated.

(Ord. of 2-27-2006(1), § 4(4.4)) Sec. 26-245. Structural stormwater controls.

All structural stormwater management facilities shall be selected and designed using the appropriate criteria from the Georgia Stormwater Management Manual. All structural stormwater controls must be designed appropriately to meet their intended function. For other structural stormwater controls not included in the Georgia

Stormwater Management Manual, or for which pollutant removal rates have not been provided, the effectiveness and pollutant removal of the structural control must be documented through prior studies, literature reviews, or other means and receive approval from the Madison County Planning and Zoning Department before being included in the design of a stormwater management system. In addition, if hydrologic or topographic conditions, or land use activities

warrant greater control than that provided by the minimum control requirements, the Madison County Planning and Zoning Department may impose additional requirements deemed necessary to protect upstream and downstream properties and aquatic resources from damage due to increased volume, frequency, and rate of stormwater runoff or increased nonpoint source pollution loads created on the site in question.

Applicants shall consult the Georgia Stormwater Management Manual for guidance on the factors that determine site design feasibility

when selecting and locating a structural stormwater control.

(Ord. of 2-27-2006(1), § 4(4.5)) Sec. 26-246. Stormwater credits for nonstructural measures.

The use of one or more site design measures by the applicant may allow for a reduction in the water quality treatment volume required under section 26-241. The applicant may, if approved by Madison County, take credit for the use of stormwater better site design practices and reduce the water quality volume requirement. For each

potential credit, there is a minimum set of criteria and requirements which identify the conditions or circumstances under which the credit may be applied. The site design practices that qualify for this credit and the criteria and procedures for applying and calculating the credits are included in the Georgia Stormwater Management Manual.

(Ord. of 2-27-2006(1), § 4(4.6)) Sec. 26-247. Drainage system guidelines.

Stormwater conveyance facilities, which may include but are not limited to culverts, stormwater drainage pipes, catch basins, drop inlets, junction boxes, headwalls, gutter, swales, channels, ditches, and energy dissipaters shall be provided when necessary for the protection of

public right-of-way and private properties adjoining project sites and/or public right-of-ways.

Stormwater conveyance facilities that are designed to carry runoff from more than one parcel,

existing or proposed, shall meet the following requirements:

(1) Methods to calculate stormwater flows shall be in accordance with the stormwater design manual;

(2) All culverts, pipe systems and open channel flow systems shall be sized in accordance with the stormwater management plan using the methods included in the stormwater design manual; and,

(3) Design and construction of stormwater conveyance facilities shall be in accordance with the criteria and specifications found in the stormwater design manual.

(Ord. of 2-27-2006(1), § 4(4.7)) Sec. 26-248. Dam design guidelines.

Any land disturbing activity that involves a site which proposes a dam shall comply with the Georgia Safe Dams Act and Rules for Dam Safety as applicable.

(Ord. of 2-27-2006(1), § 4(4.8)) Secs. 26-249—26-270. Reserved.

DIVISION 4. CONSTRUCTION

INSPECTIONS OF POST-DEVELOPMENT

STORMWATER MANAGEMENT SYSTEM

Sec. 26-271. Inspections to ensure plan compliance during construction.

Periodic inspections of the stormwater management system construction may be conducted by the staff of the Madison County Planning and

Zoning Department or conducted and certified by a professional engineer who has been approved by the planning and zoning department. Construction inspections shall utilize the approved stormwater management plan for establishing compliance.

All inspections shall be documented with written reports that contain the following information:

(1) The date and location of the inspection;

(2) Whether construction is in compliance with the approved stormwater management plan;

(3) Variations from the approved construction specifications; and,

(4) Any other variations or violations of the conditions of the approved stormwater management plan.

If any violations are found, the applicant shall be notified in writing of the nature of the violation and the required corrective actions.

(Ord. of 2-27-2006(1), § 5(5.1)) Sec. 26-272. Final inspection and as built plans.

Upon completion of a project, and before a certificate of occupancy shall be granted, the applicant is responsible for certifying that the completed project is in accordance with the approved stormwater management plan. All applicants are required to submit actual as built plans for any stormwater management facilities or practices after final construction is completed. The plan must show the final design

specifications for all stormwater management facilities and practices and must be certified by a professional engineer. A final inspection by

Madison County is required before the release of any performance securities can occur.

(Ord. of 2-27-2006(1), § 5(5.2)) Secs. 26-273—26-300. Reserved.

DIVISION 5. ONGOING INSPECTION AND

MAINTENANCE OF STORMWATER

FACILITIES AND PRACTICES

Sec. 26-301. Long-term maintenance inspection of stormwater facilities and practices.

Stormwater management facilities and practices included in a stormwater management plan which are subject to an inspection and maintenance agreement must undergo ongoing inspections to document maintenance and repair needs and ensure compliance with the requirements of the agreement, the plan and this article.

A stormwater management facility or practice shall be inspected on a periodic basis by the responsible person in accordance with the approved inspection and maintenance agreement. In the event that the stormwater management facility has not been maintained and/or becomes a danger to public safety or public

health, Madison County shall notify the person responsible for carrying out the maintenance plan by registered or certified mail to the person specified in the inspection and maintenance

agreement. The notice shall specify the measures needed to comply with the agreement and the plan and shall specify the time within which such measures shall be completed. If the responsible person fails or refuses to meet the requirements of the inspection and maintenance agreement, the Madison County, may correct the violation as provided in section 26-304 hereof.

Inspection programs by Madison County may be established on any reasonable basis, including but not limited to: routine inspections; random inspections; inspections based upon complaints

or other notice of possible violations; and joint inspections with other agencies inspecting under environmental or safety laws. Inspections may include, but are not limited to: reviewing maintenance and repair records; sampling discharges, surface water, groundwater, and material or water in stormwater management facilities; and evaluating the condition of stormwater management facilities and practices.

(Ord. of 2-27-2006(1), § 6(6.1)) Sec. 26-302. Right-of-entry for inspection.

The terms of the inspection and maintenance agreement shall provide for the Madison County to enter the property at reasonable times and in a reasonable manner for the purpose of inspection. This includes the right to enter a property when it has a reasonable basis to believe that a

violation of this article is occurring or has occurred and to enter when necessary for abatement of a

public nuisance or correction of a violation of this article.

(Ord. of 2-27-2006(1), § 6(6.2)) Sec. 26-303. Records of maintenance activities.

Parties responsible for the operation and maintenance of a stormwater management facility shall provide records of all maintenance and repairs to Madison County.

(Ord. of 2-27-2006(1), § 6(6.3)) Sec. 26-304. Failure to maintain.

If a responsible person fails or refuses to meet the requirements of the inspection and maintenance agreement, Madison County, after 30 days written notice (except, that in the event the violation constitutes an immediate danger to public health or public safety, 24 hours notice shall be sufficient), may correct a violation of the design standards or maintenance requirements

by performing the necessary work to place the facility or practice in proper working condition.

Madison County may assess the owner(s) of the facility for the cost of repair work which shall be a lien on the property, and may be placed on the

ad valorum tax bill for such property and collected in the ordinary manner for such taxes.

(Ord. of 2-27-2006(1), § 6(6.4)) Secs. 26-305—26-329. Reserved.

DIVISION 6. VIOLATIONS, ENFORCEMENT

AND PENALTIES

Sec. 26-330. [Violations.]

Any action or inaction which violates the provisions of this article or the requirements of an approved stormwater management plan or permit, may be subject to the enforcement actions outlined in this division. Any such action or inaction which is continuous with respect to time is deemed to be a public nuisance and may be abated by injunctive or other equitable relief.

the imposition of any of the penalties described below shall not prevent such equitable relief. the imposition of any of the penalties described

below shall not prevent such equitable relief.

(Ord. of 2-27-2006(1), § 7) Sec. 26-331. Notice of violation.

If Madison County determines that an applicant or other responsible person has failed to comply with the terms and conditions of a permit, an approved stormwater management plan or the provisions of this article, it shall issue a written notice of violation to such applicant or other

responsible person. Where a person is engaged in activity covered by this article without having first secured a permit therefore, the notice of

violation shall be served on the owner or the responsible person in charge of the activity being conducted on the site.

The notice of violation shall contain:

(1) The name and address of the owner or the applicant or the responsible person;

(2) The address or other description of the site upon which the violation is occurring;

(3) A statement specifying the nature of the violation;

(4) A description of the remedial measures necessary to bring the action or inaction into compliance with the permit, the stormwater management plan or this article and the date for the completion of such remedial action;

(5) A statement of the penalty or penalties that may be assessed against the person to whom the notice of violation is directed;

and,

(6) A statement that the determination of violation may be appealed to Madison County by filing a written notice of appeal within 30 days after the notice of violation (except, that in the event the violation constitutes an immediate danger to public health or public safety, 24 hours

notice shall be sufficient).

(Ord. of 2-27-2006(1), § 7(7.1)) Sec. 26-332. Penalties.

In the event the remedial measures described in the notice of violation have not been completed by the date set forth for such completion in the

notice of violation, any one or more of the following actions or penalties may be taken or assessed against the person to whom the notice of violation was directed. Before taking any of the following actions or imposing any of the following penalties, Madison County shall first notify the applicant or other responsible person in writing of its intended action, and shall provide a reasonable opportunity, of not less than ten days (except, that in the event the violation constitutes an immediate danger to public health or public safety, 24 hours notice shall be sufficient) to cure such violation. In the event the applicant or other responsible person

fails to cure such violation after such notice and cure period, Madison County may take any one

or more of the following actions or impose any one or more of the following penalties.

(1) Stop work order—Madison County may issue a stop work order which shall be served on the applicant or other responsible person. The stop work order shall remain in effect until the applicant or other responsible person has taken the remedial measures set forth in the notice of violation or has otherwise cured the violation or violations described therein, provided the stop work order may be withdrawn or modified to enable the applicant or other responsible person to take the necessary remedial measures to cure such violation or violations.

(2) Withhold certificate of occupancy— Madison County may refuse to issue a certificate of occupancy for the building or other improvements constructed or being constructed on the site until the applicant or other responsible person has taken the remedial measures set forth in the notice of violation or has otherwise cured the violations described therein.

(3) Suspension, revocation or modification of permit—Madison County may suspend, revoke or modify the permit authorizing the land development project. A suspended, revoked or modified permit may be reinstated after the applicant or other responsible person has taken the remedial measures set forth in the notice of violation or has otherwise cured the violations described therein, provided such permit may be reinstated [upon such conditions as Madison County may deem necessary] to enable the applicant or other responsible person to take the necessary remedial measures to cure such violations.

(4) Civil penalties—In the event the applicant or other responsible person fails to take the remedial measures set forth in the notice of violation or otherwise fails to cure the violations described therein within ten days, or such greater period as the Madison County shall deem appropriate (except, that in the event the violation constitutes an immediate danger to public health or public safety, 24 hours

notice shall be sufficient) after Madison County has taken one or more of the actions described above, Madison County may impose a penalty not to exceed $1,000.00 (depending on the severity of the violation) for each day the violation remains unremedied after receipt of the notice of violation.

(5) Criminal penalties—For intentional and flagrant violations of this article, the Madison County may issue a citation to the applicant or other responsible person, requiring such person to appear in Madison County Superior Court to answer charges for such violation. Upon conviction, such person shall be punished by a fine not to exceed $1,000.00 or imprisonment for 60 days or both. Each act of violation and each day upon which any

violation shall occur shall constitute a separate offense.

(Ord. of 2-27-2006(1), § 7(7.2)) Chapters 27—29

RESERVED

Chapter 30

FLOODS*

ARTICLE I. IN GENERAL

Secs. 30-1—30-30. Reserved.

ARTICLE II. FLOOD DAMAGE

PREVENTION*

DIVISION 1. STATUTORY AUTHORIZATION,

FINDINGS OF FACT, PURPOSE AND

OBJECTIVES

Sec. 30-31. Authorization.

Article IX, Section II of the Constitution of the State of Georgia and Section 36-1-20(a) of the Official Code of Georgia Annotated have delegated the responsibility to local governmental units to adopt regulations designed to promote

the public health, safety, and general welfare of its citizenry. Therefore, the Board of Commissioners of Madison County, Georgia, does ordain as follows.

(Ord. of 7-5-2010, art. 1, § A) Sec. 30-32. Findings of fact.

(a) The flood hazard areas of the Madison County, Georgia, are subject to periodic inundation which results in loss of life and property, health and safety hazards, disruption of commerce and governmental services, extraordinary public expenditures for flood relief and protection, and impairment of the tax base, all of which

adversely affect the public health, safety and general welfare.

(b) These flood losses are caused by the occupancy in flood hazard areas of uses vulnerable to floods, which are inadequately elevated,

floodproofed, or otherwise unprotected from flood damages, and by the cumulative effect of obstructions in floodplains causing increases in flood heights and velocities.

(Ord. of 7-5-2010, art. 1, § B) Sec. 30-33. Statement of purpose.

It is the purpose of this article to promote the public health, safety and general welfare and to minimize public and private losses due to flood conditions in specific areas by provisions designed to:

(1) Require that uses vulnerable to floods, including facilities, which serve such uses, be protected against flood damage at the time of initial construction;

(2) Restrict or prohibit uses which are dangerous to health, safety and property due to water or erosion hazards, or which

increase flood heights, velocities, or erosion;

(3) Control filling, grading, dredging and other development which may increase flood damage or erosion; and

(4) Prevent or regulate the construction of flood barriers which will unnaturally divert floodwaters or which may increase flood hazards to other lands;

(5) Control the alteration of natural floodplains, stream channels, and natural protective barriers, which are involved in the accommodation of floodwaters.

(Ord. of 7-5-2010, art. 1, § C) Sec. 30-34. Objectives.

The objectives of this article are:

(1) To protect human life and health;

(2) To minimize damage to public facilities and utilities such as water and gas mains, electric, telephone and sewer lines, streets and bridges located in floodplains;

(3) To help maintain a stable tax base by providing for the sound use and development of floodprone areas in such a manner as to minimize flood blight areas,

(4) To minimize expenditure of public money for costly flood control projects;

(5) To minimize the need for rescue and relief efforts associated with flooding and generally undertaken at the expense of the general public;

(6) To minimize prolonged business interruptions; and

(7) To insure that potential homebuyers are notified that property is in a flood area.

(Ord. of 7-5-2010, art. 1, § D) Secs. 30-35—30-40. Reserved.

DIVISION 2. GENERAL PROVISIONS

Sec. 30-41. Lands to which this article applies.

This article shall apply to all areas of special flood hazard within the jurisdiction of Madison County, Georgia.

(Ord. of 7-5-2010, art. 2, § A) Sec. 30-42. Basis for area of special flood hazard.

The areas of special flood hazard identified by the Federal Emergency Management Agency in its flood insurance study (FIS), dated September 17, 2010, with accompanying maps and other supporting data and any revision thereto, are adopted by reference and declared a part of this article.

For those land areas acquired by a municipality through annexation, the current effective FIS dated September 17, 2010, with accompanying

maps and other supporting data and any revision thereto, for Madison County are hereby adopted by reference.

Areas of special flood hazard may also include those areas known to have flooded historically or defined through standard engineering analysis by governmental agencies or private parties but not yet incorporated in a FIS.

The repository for public inspection of the flood insurance study (FIS), accompanying maps and other supporting data is located: Madison County Planning and Zoning Department.

(Ord. of 7-5-2010, art. 2, § B) Sec. 30-43. Establishment of development permit.

A development permit shall be required in conformance with the provisions of this article prior to the commencement of any development activities.

(Ord. of 7-5-2010, art. 2, § C) Sec. 30-44. Compliance.

No structure or land shall hereafter be located, extended, converted or altered without full compliance with the terms of this article and other applicable regulations.

(Ord. of 7-5-2010, art. 2, § D) Sec. 30-45. Abrogation and greater restrictions.

This article is not intended to repeal, abrogate, or impair any existing ordinance, easements, covenants, or deed restrictions. However, where this article and another conflict or overlap, whichever imposes the more stringent restrictions shall prevail.

(Ord. of 7-5-2010, art. 2, § E) Sec. 30-46. Interpretation.

In the interpretation and application of this article, all provisions shall be: (1) considered as minimum requirements; (2) liberally construed in

favor of the governing body, and; (3) deemed neither to limit nor repeal any other powers granted under state statutes.

(Ord. of 7-5-2010, art. 2, § F) Sec. 30-47. Warning and disclaimer of liability.

The degree of flood protection required by this article is considered reasonable for regulatory purposes and is based on scientific and engineering considerations. Larger floods can and will occur; flood heights may be increased by manmade

or natural causes. This article does not imply that land outside the areas of special flood hazard or

uses permitted within such areas will be free from flooding or flood damages. This article shall not

create liability on the part of Madison County or by any officer or employee thereof for any flood damages that result from reliance on this article or any administrative decision lawfully made hereunder.

(Ord. of 7-5-2010, art. 2, § G) Sec. 30-48. Penalties for violation.

Failure to comply with the provisions of this article or with any of its requirements, including conditions and safeguards established in connection with grants of variance or special exceptions shall constitute a violation. Any person who violates this article or fails to comply with any of its requirements shall, upon conviction thereof, be

fined not more than $1,000.00 or imprisoned for not more than 60 days, or both, and in addition, shall pay all costs and expenses involved in the case. Each day such violation continues shall be considered a separate offense. Nothing herein contained shall prevent the Madison County from taking such other lawful actions as is necessary to prevent or remedy any violation.

(Ord. of 7-5-2010, art. 2, § H) Secs. 30-49—30-60. Reserved.

DIVISION 3. ADMINISTRATION

Sec. 30-61. Designation of ordinance [article] administrator.

The zoning administrator is hereby appointed to administer and implement the provisions of this article.

(Ord. of 7-5-2010, art. 3, § A) Sec. 30-62. Permit procedures.

Application for a development permit shall be made to the zoning administrator on forms furnished by the community prior to any development activities, and may include, but not be limited to, the following: plans in duplicate drawn to scale showing the elevations of the area in

question and the nature, location, dimensions, of existing or proposed structures, earthen fill placement, storage of materials or equipment, and drainage facilities.

Specifically, the following information is required:

(1) Application stage.

a. Elevation in relation to mean sea level (or highest adjacent grade) of the lowest floor, including basement, of all proposed structures;

b. Elevation in relation to mean sea level to which any non-residential structure will be floodproofed;

c. Design certification from a registered professional engineer or architect that any proposed non-residential floodproofed structure will meet the floodproofing criteria of division

4, subsection 30-72(2);

d. Description of the extent to which any watercourse will be altered or relocated as a result of a proposed development; and

(2) Construction stage. For all new construction and substantial improvements, the permit holder shall provide to the administrator an as-built certification of the regulatory floor elevation or floodproofing

level immediately after the lowest floor or floodproofing is completed. Any lowest floor certification made relative to mean sea level shall be prepared by or under the direct supervision of a registered land surveyor or professional engineer and certified by same. When floodproofing is utilized for non-residential structures, said certification shall be prepared by or under

the direct supervision of a professional engineer or architect and certified by same.

Any work undertaken prior to submission of these certifications shall be at the permit holder's risk.

The zoning administrator shall review the above referenced certification data submitted. Deficiencies detected by such review shall be corrected by the permit holder immediately and prior to further progressive work being allowed to proceed.

Failure to submit certification or failure to make said corrections required hereby, shall be cause to issue a stop-work order for the project.

(Ord. of 7-5-2010, art. 3, § B) Sec. 30-63. Duties and responsibilities of the administrator.

Duties of the zoning administrator shall include, but shall not be limited to:

(1) Review proposed development to assure that the permit requirements of this article have been satisfied.

(2) Review proposed development to assure that all necessary permits have been received from governmental agencies from which approval is required by federal or

state law, including section 404 of the Federal Water Pollution Control Act Amendments of 1972, 33 U.S.C. 1334.

Require that copies of such permits be provided and maintained on file.

(3) Review all permit applications to determine whether proposed building sites will be reasonably safe from flooding.

(4) When base flood elevation data or floodway data have not been provided in accordance with section 30-42, then the zoning administrator shall obtain, review and

reasonably utilize any base flood elevation and floodway data available from a federal, state or other sources in order to

administer the provisions of division 4.

(5) Review and record the actual elevation in relation to mean sea level (or highest adjacent grade) of the lowest floor, including basement, of all new or substantially improved structures in accordance with

division 3, subsection 30-62(2).

(6) Review and record the actual elevation, in relation to mean sea level to which any new or substantially improved structures have been floodproofed, in accordance with division 3, subsection 30-62(2).

(7) When floodproofing is utilized for a structure, the zoning administrator shall obtain certification of design criteria from a registered professional engineer or architect in accordance with 30-62(1)c. and division 4, subsection 30-72(2) or 30-74(2).

(8) Make substantial damage determinations following a flood event or any other event that causes damage to structures in flood hazard areas.

(9) Notify adjacent communities and the Georgia Department of Natural Resources prior to any alteration or relocation of a watercourse and submit evidence of such notification to the Federal Emergency Management Agency (FEMA).

(10) For any altered or relocated watercourse, submit engineering data/analysis within six months to the FEMA to ensure accuracy of community flood maps through the letter of map revision process. Assure

flood-carrying capacity of any altered or relocated watercourse is maintained.

(11) Where interpretation is needed as to the exact location of boundaries of the areas of special flood hazard (for example, where there appears to be a conflict between a mapped boundary and actual field conditions) the zoning administrator shall make the necessary interpretation. Any person

contesting the location of the boundary shall be given a reasonable opportunity to appeal the interpretation as provided in this division.

(12) All records pertaining to the provisions of this article shall be maintained in the office of the zoning administrator and shall be open for public inspection.

(Ord. of 7-5-2010, art. 3, § C) Secs. 30-64—30-70. Reserved.

DIVISION 4. PROVISIONS FOR FLOOD

HAZARD REDUCTION

Sec. 30-71. General standards.

In all areas of special flood hazard, the following provisions are required:

(1) New construction and substantial improvements of existing structures shall be anchored to prevent flotation, collapse or lateral movement of the structure;

(2) New construction and substantial improvements of existing structures shall be constructed with materials and utility equipment resistant to flood damage;

(3) New construction or substantial improvements of existing structures shall be constructed by methods and practices that minimize flood damage;

(4) Elevated buildings. All new construction or substantial improvements of existing structures that include any fully-enclosed area located below the lowest floor formed by foundation and other exterior walls shall be designed so as to be an unfinished or flood-resistant enclosure. The enclosure shall be designed to equalize hydrostatic flood forces on exterior walls by allowing for the automatic entry and exit

of floodwater.

a. Designs for complying with this requirement must either be certified by a professional engineer or architect or meet the following minimum criteria:

1. Provide a minimum of two openings having a total net area of not less than one square inch

for every square foot of enclosed area subject to flooding;

2. The bottom of all openings shall be no higher than one foot above grade; and

3. Openings may be equipped with screens, louvers, valves or other coverings or devices provided they permit the automatic flow of floodwater in both direction.

b. So as not to violate the "lowest floor" criteria of this article, the unfinished or flood-resistant enclosure shall only be used for parking of vehicles, limited storage of maintenance equipment used in connection with the premises, or entry to the elevated

area, and

c. The interior portion of such enclosed area shall not be partitioned or finished into separate rooms.

(5) All heating and air conditioning equipment and components (including ductwork), all electrical, ventilation, plumbing, and other service facilities shall be designed and/or located so as to prevent

water from entering or accumulating within the components during conditions of flooding.

(6) Manufactured homes shall be anchored to prevent flotation, collapse, or lateral movement. Methods of anchoring may include, but are not limited to, use of over-the-top

or frame ties to ground anchors. This standard shall be in addition to and consistent with applicable state requirements for resisting wind forces.

(7) New and replacement water supply systems shall be designed to minimize or eliminate infiltration of floodwaters into

the system;

(8) New and replacement sanitary sewage systems shall be designed to minimize or eliminate infiltration of floodwaters into the systems and discharges from the systems into floodwaters;

(9) On-site waste disposal systems shall be located and constructed to avoid impairment to them or contamination from them during flooding; and

(10) Any alteration, repair, reconstruction or improvement to a structure, which is not compliant with the provisions of this article, shall be undertaken only if the nonconformity is not furthered, extended or replaced.

(Ord. of 7-5-2010, art. 4, § A) Sec. 30-72. Specific standards.

In all areas of special flood hazard, the following provisions are required:

(1) New construction and/or substantial improvements. Where base flood elevation data are available, new construction and/or

substantial improvement of any structure or manufactured home shall have the lowest floor, including basement, elevated no lower than one foot above the base flood elevation. Should solid foundation perimeter walls be used to elevate a structure, openings sufficient to facilitate equalization of flood hydrostatic forces on both sides of exterior walls shall be provided in

accordance with standards of subsection 30-71(4), "elevated buildings".

a. All heating and air conditioning equipment and components (including ductwork), all electrical, ventilation, plumbing, and other service facilities shall be elevated at or above

one foot above the base flood elevation.

(2) Non-residential construction. New construction and/or the substantial improvement of any structure located in A1-30, AE, or AH zones, may be floodproofed in

lieu of elevation. The structure, together with attendant utility and sanitary facilities, must be designed to be watertight to one foot above the base flood elevation,

with walls substantially impermeable to the passage of water, and structural components having the capability of resisting hydrostatic and hydrodynamic loads and

the effect of buoyancy. A registered professional engineer or architect shall certify that the design and methods of construction are in accordance with accepted standards of practice for meeting the provisions above, and shall provide such certification to the official as set forth

above and in subsection 30-63(6).

(3) Standards for manufactured homes and recreational vehicles. Where base flood elevation data are available.

a. All manufactured homes placed and/or substantially improved on: (1) individual lots or parcels, (2) in new and/or substantially improved manufactured home parks or subdivisions, (3) in expansions to existing manufactured home parks or subdivisions, or (4) on a site in an existing manufactured home park or subdivision where a manufactured home has incurred "substantial damage"

as the result of a flood, must have the lowest floor including basement, elevated no lower than one foot above the base flood elevation.

b. Manufactured homes placed and/or substantially improved in an existing manufactured home park or subdivision may be elevated so that either:

1. The lowest floor of the manufactured home is elevated no lower than one foot above the

level of the base flood elevation, or

2. The manufactured home chassis is elevated and supported by reinforced piers (or other

foundation elements of at least an equivalent strength) of no less than 36 inches in height above grade.

c. All manufactured homes must be securely anchored to an adequately anchored foundation system to resist flotation, collapse and lateral movement. (Ref. subsection 30-71(6)

above)

d. All recreational vehicles placed on sites must either:

1. Be on the site for fewer than 180 consecutive days.

2. Be fully licensed and ready for highway use, (a recreational vehicle is ready for highway use if it is licensed, on its wheels or

jacking system, attached to the site only by quick-disconnecttype utilities and security devices, and has no permanently attached structures or additions), or

3. The recreational vehicle must meet all the requirements for "new construction", including the anchoring and elevation requirements of subsections 30- 72(3)a—c., above.

(4) Floodway. Located within areas of special flood hazard established in section 30-42, are areas designated as floodway. A floodway may be an extremely hazardous area due to velocity floodwaters, debris or erosion potential. In addition, the area must remain free of encroachment in order to allow for the discharge of the base flood without increased flood heights.

Therefore, the following provisions shall apply:

a. Encroachments are prohibited, including earthen fill, new construction, substantial improvements or other development within the regulatory floodway. Development may be permitted, however, provided it is

demonstrated through hydrologic and hydraulic analyses performed in accordance with standard engineering practice that the encroachment shall

not result in any increase in flood levels or floodway widths during a base flood discharge. A registered professional engineer must provide supporting technical data and certification thereof.

b. Only if subsection 30-72(4)a. above is satisfied, then any new construction or substantial improvement shall comply with all other applicable flood

hazard reduction provisions of division 4.

(Ord. of 7-5-2010, art. 4, § B) Sec. 30-73. Building standards for streams without established base flood elevations and/or floodway (Azones).

Located within the areas of special flood hazard established in section 30-42, where streams exist but no base flood data have been provided

(A-zones), or where base flood data have been provided, but a floodway has not been delineated, the following provisions apply:

(1) When base flood elevation data or floodway data have not been provided in accordance with section 30-42, then the zoning administrator shall obtain, review, and

reasonably utilize any scientific or historic base flood elevation and floodway data available from a federal, state, or

other source, in order to administer the provisions of division 4. Only if data are not available from these sources, then the following provisions (2) and (3) shall apply:

(2) No encroachments, including structures or fill material, shall be located within an area equal to the width of the stream or 20 feet, whichever is greater, measured from the top of the stream bank, unless certification by a registered professional engineer is provided demonstrating that such encroachment shall not result in more than a one foot increase in flood levels during the occurrence of the base flood discharge.

(3) In special flood hazard areas without base flood elevation data, new construction and substantial improvements of existing structures shall have the lowest floor of the lowest enclosed area (including basement) elevated no less than three feet above the highest adjacent grade at the

building site. (NOTE: Require the lowest floor to be elevated one foot above the estimated base flood elevation in A-zone areas where a limited detail study has been completed). Openings sufficient to facilitate the unimpeded movements of floodwaters shall be provided in accordance with standards of subsection 30- 71(4) "elevated buildings".

a. All heating and air conditioning equipment and components (including ductwork), all electrical, ventilation, plumbing, and other service facilities shall be elevated no less

than three feet above the highest adjacent grade at the building site.

The zoning administrator shall certify the lowest floor elevation level and the record shall become a permanent part of the permit file.

(Ord. of 7-5-2010, art. 4, § C) Sec. 30-74. Standards for areas of special flood hazard (zones AE) with established base flood elevations without designated floodways.

Located within the areas of special flood hazard established in section 30-42 where streams with base flood elevations are provided but no

floodways have been designated, (zones AE) the following provisions apply:

(1) No encroachments, including fill material, new structures or substantial improvements shall be located within areas of special flood hazard, unless certification by a registered professional engineer is provided demonstrating that the cumulative effect of the proposed development, when combined with all other existing

and anticipated development, will not increase the water surface elevation of the base flood more than one foot at any point

within the community. The engineering certification should be supported by technical data that conforms to standard hydraulic engineering principles.

(2) New construction or substantial improvements of buildings shall be elevated or floodproofed to elevations established in

accordance with section 30-72.

(Ord. of 7-5-2010, art. 4, § D) Sec. 30-75. Standards for areas of shallow flooding (AO zones).

Areas of special flood hazard established in section 30-42 may include designated "AO" shallow flooding areas. These areas have base flood depths of one to three feet above ground, with no

clearly defined channel. The following provisions apply:

(1) All new construction and substantial improvements of residential and non-residential structures shall have the lowest floor, including basement, elevated to the

flood depth number specified on the flood insurance rate map (FIRM), above the highest adjacent grade. If no flood depth number is specified, the lowest floor, including basement, shall be elevated at least three feet above the highest adjacent grade. Openings sufficient to facilitate the unimpeded movements of floodwaters shall be provided in accordance with standards of subsection 30-71(4), "elevated buildings".

The zoning administrator shall certify the lowest floor elevation level and the record shall become a permanent part of the permit file.

(2) New construction or the substantial improvement of a non-residential structure may be floodproofed in lieu of elevation.

The structure, together with attendant utility and sanitary facilities, must be designed to be watertight to the specified FIRM flood level plus one foot, above highest adjacent grade, with walls substantially impermeable to the passage of water, and structural components having

the capability of resisting hydrostatic and hydrodynamic loads and the effect of buoyancy. A registered professional engineer or architect shall certify that the design

and methods of construction are in accordance with accepted standards of practice for meeting the provisions above, and

shall provide such certification to the official as set forth above and as required in subsections 30-62(1)c. and (2).

(3) Drainage paths shall be provided to guide floodwater around and away from any proposed structure.

(Ord. of 7-5-2010, art. 4, § E) Sec. 30-76. Standards for subdivisions.

(a) All subdivision and/or development proposals shall be consistent with the need to minimize flood damage;

(b) All subdivision and/or development proposals shall have public utilities and facilities such as sewer, gas, electrical and water systems located and constructed to minimize flood damage;

(c) All subdivision and/or development proposals shall have adequate drainage provided to reduce exposure to flood hazards; and

(d) For subdivisions and/or developments greater than 50 lots or five acres, whichever is less, base flood elevation data shall be provided for subdivision and all other proposed development, including manufactured home parks and subdivisions. Any changes or revisions to the flood data adopted herein and shown on the FIRM shall

be submitted to FEMA for review as a conditional letter of map revision (CLOMR) or conditional letter of map amendment (CLOMA), whichever is applicable. Upon completion of the project, the developer is responsible for submitting the "asbuilt" data to FEMA in order to obtain the final

LOMR.

(Ord. of 7-5-2010, art. 4, § F) Sec. 30-77. Standards for critical facilities.

(a) Critical facilities shall not be located in the 100-year floodplain or the 500-year floodplain.

(b) All ingress and egress from any critical facility must be protected to the 500-year flood elevation.

(Ord. of 7-5-2010, art. 4, § G) Secs. 30-78—30-90. Reserved.

DIVISION 5. VARIANCE PROCEDURES

Sec. 30-91. [Requests for appeals or variances.]

(a) The Madison County Planning Commission, as established by Madison County, shall hear and decide requests for appeals or variance

from the requirements of this article.

(b) The board shall hear and decide appeals when it is alleged an error in any requirement, decision, or determination is made by the zoning administrator in the enforcement or administration of this article.

(c) Any person aggrieved by the decision of the zoning administrator may appeal such decision to the Superior Court of Madison County, as provided in O.C.G.A. § 5-4-1.

(d) Variances may be issued for the repair or rehabilitation of historic structures upon a determination that the proposed repair or rehabilitation will not preclude the structure's continued designation as a historic structure and the variance is the minimum to preserve the historic character and design of the structure.

(e) Variances may be issued for development necessary for the conduct of a functionally dependent use, provided the criteria of this article are met, no reasonable alternative exists, and the

development is protected by methods that minimize flood damage during the base flood and create no additional threats to public safety.

(f) Variances shall not be issued within any designated floodway if any increase in flood levels during the base flood discharge would result.

(g) In reviewing such requests, the Madison County Planning Commission shall consider all technical evaluations, relevant factors, and all standards specified in this and other sections of this article.

(h) Conditions for variances.

(1) A variance shall be issued only when there is:

a. A finding of good and sufficient cause;

b. A determination that failure to grant the variance would result in exceptional hardship; and

c. A determination that the granting of a variance will not result in increased flood heights, additional threats to public safety, extraordinary public expense, create nuisance, cause fraud on or victimization of the public, or conflict with existing local laws or ordinances.

(2) The provisions of this article are minimum standards for flood loss reduction;

therefore any deviation from the standards must be weighed carefully. Variances shall only be issued upon a determination that the variance is the minimum necessary, considering the flood hazard, to

afford relief; and, in the instance of an historic structure, a determination that the variance is the minimum necessary so as not to destroy the historic character and design of the building.

(3) Any applicant to whom a variance is granted shall be given written notice specifying the difference between the base flood elevation and the elevation of the

proposed lowest floor and stating that the cost of flood insurance will be commensurate with the increased risk to life and property resulting from the reduced lowest floor elevation.

(4) The zoning administrator shall maintain the records of all appeal actions and report any variances to the Federal Emergency Management Agency upon request.

(i) Upon consideration of the factors listed above and the purposes of this article, the Madison County Planning Commission may attach such conditions to the granting of variances as it deems necessary to further the purposes of this

article.

(Ord. of 7-5-2010, art. 5, § A) Secs. 30-92—30-100. Reserved.

DIVISION 6. DEFINITIONS (note: * date must be inserted) Sec. 30-101. Definitions.

Unless specifically defined below, words or phrases used in this article shall be interpreted so as to give them the meaning they have in common

usage and to give this article its most reasonable application.

Accessory structure means a structure having minimal value and used for parking, storage and other non-habitable uses, such as garages, carports, storage sheds, pole barns, hay sheds and the like.

Addition (to an existing building) means any walled and roofed expansion to the perimeter of a building in which the addition is connected by a common load-bearing wall other than a firewall.

Any walled and roofed addition, which is connected by a firewall or is separated by an independent perimeter load-bearing wall, shall be considered "new construction".

Appeal means a request for a review of the zoning administrator's interpretation of any provision of this article.

Area of shallow flooding means a designated AO or AH zone on a community's flood insurance rate map (FIRM) with base flood depths from one to three feet, and/or where a clearly defined channel does not exist, where the path of flooding is unpredictable and indeterminate, and where

velocity flow may be evident.

Area of special flood hazard means the land in the floodplain within a community subject to a one-percent-or-greater chance of flooding in any given year. In the absence of official designation by the Federal Emergency Management Agency,

areas of special flood hazard shall be those designated by the local community and referenced in section 30-42.

Base flood means the flood having a onepercent chance of being equaled or exceeded in any given year.

Base flood elevation (BFE) means the elevation shown on the flood insurance rate map for zones

AE, AH, A1-A30, AR, AR/A, AR/AE, AR/A1-A30,

AR/AH, AR/AO, V1-V30, and VE that indicates the water surface elevation resulting from a flood that has a one-percent chance of equaling or

exceeding that level in any given year.

Basement means that portion of a building having its floor subgrade (below ground level) on all sides.

Building means any structure built for support, shelter, or enclosure for any occupancy or storage.

Critical facility means any public or private facility, which, if flooded, would create an added dimension to the disaster or would increase the

hazard to life and health. Critical facilities include:

(1) Structures or facilities that produce, use, or store highly volatile, flammable, explosive, toxic, or water-reactive materials;

(2) Hospitals and nursing homes, and housing for the elderly, which are likely to contain occupants who may not be sufficiently mobile to avoid the loss of life or injury during flood and storm events;

(3) Emergency operation centers or data storage centers which contain records or services that may become lost or inoperative during flood and storm events; and

(4) Generating plants and other principal points of utility lines.

Development means any manmade change to improved or unimproved real estate, including, but not limited to, buildings or other structures, mining, dredging, filling, grading, paving, excavating, drilling operations, and storage of materials or equipment.

Elevated building means a non-basement building built to have the lowest floor of the lowest enclosed area elevated above the ground level by

means of fill, solid foundation perimeter walls, pilings, columns, piers, or shear walls adequately anchored so as not to impair the structural integrity of the building during a base flood event.

*Existing construction means for the purposes of determining rates, structures for which the start of construction commenced before August 1, 1987 [the effective date of the initial FIRM for that community].

*Existing manufactured home park or subdivision means a manufactured home park or subdivision for which the construction of facilities for servicing the lots on which the manufactured

homes are to be affixed (including at a minimum the installation of utilities, the construction of streets, and final site grading or the pouring of

concrete pads) is completed before November 18, 1986. [the effective date of the FIRST floodplain management regulations adopted by a community].

Expansion to an existing manufactured home park or subdivision means the preparation of additional sites by the construction of facilities for servicing the lots on which the manufactured

homes are to be affixed, including the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads.

Flood or flooding means a general and temporary condition of partial or complete inundation of normally dry land areas from:

(1) The overflow of inland or tidal waters; or

(2) The unusual and rapid accumulation or runoff of surface waters from any source.

Flood hazard boundary map (FHBM) means an official map of a community, issued by the Federal Insurance Administration, where the boundaries of areas of special flood hazard have been defined as zone A.

Flood insurance rate map (FIRM) means an official map of a community, issued by the Federal Insurance Administration, delineating the areas

of special flood hazard and/or risk premium zones applicable to the community.

Flood insurance study means the official report by the Federal Insurance Administration evaluating flood hazards and containing flood profiles and water surface elevations of the base flood.

Floodplain means any land area susceptible to flooding.

Floodproofing means any combination of structural and non-structural additions, changes, or adjustments to structures, which reduce or eliminate flood damage to real estate or improved real property, water and sanitary facilities, structures and their contents.

Floodway means the channel of a river or other watercourse and the adjacent land areas that must be reserved in order to discharge the base flood without cumulatively increasing the water surface elevation more than a designated height.

Freeboard means a factor of safety usually expressed in feet above a flood level for purposes of floodplain management. "Freeboard" tends to

compensate for the many unknown factors that could contribute to flood heights greater than the height calculated for a selected size flood and

floodway conditions, such as wave action, bridge openings, and the hydrological effect of urbanization of the watershed.

Highest adjacent grade means the highest natural elevation of the ground surface, prior to construction, adjacent to the proposed foundation

of a building.

Historic structure means any structure that is;

a. Listed individually in the National Register of Historic Places (a listing maintained by the U.S. Department of Interior) or preliminarily determined by the Secretary of the Interior as meeting the

requirements for individual listing on the National Register;

b. Certified or preliminarily determined by the Secretary of the Interior as contributing to the historical significance of a registered historic district or a district preliminarily determined by the Secretary to qualify as a registered historic district;

c. Individually listed on a state inventory of historic places and determined as eligible by states with historic preservation programs which have been approved by the Secretary of the Interior; or

d. Individually listed on a local inventory of historic places and determined as eligible by communities with historic preservation programs that have been certified either:

1. By an approved state program as determined by the Secretary of the Interior, or

2. Directly by the Secretary of the Interior in states without approved programs.

Lowest floor means the lowest floor of the lowest enclosed area, including basement. An unfinished or flood-resistant enclosure used solely for parking of vehicles, building access, or storage, in an area other than a basement, is not considered a building's lowest floor, provided that such enclosure is not built so as to render the

structure in violation of other provisions of this Code.

Manufactured home means a building, transportable in one or more sections, built on a permanent chassis and designed to be used with or without a permanent foundation when connected

to the required utilities. The term also includes park trailers, travel trailers, and similar transportable structures placed on a site for 180 consecutive days or longer and intended to be improved property.

Manufactured home park or subdivision means a parcel (or contiguous parcels) of land divided into two or more manufactured home lots for rent or sale.

Mean sea level means the average height of the sea for all stages of the tide. It is used as a reference for establishing various elevations within the floodplain. For purposes of the National Flood Insurance Program, the National Geodetic Vertical Datum (NGVD) of 1929 or other datum, to which base flood elevations shown on a community's flood insurance rate map are referenced.

National Geodetic Vertical Datum (NGVD) as corrected in 1929 is a vertical control used as a reference for establishing varying elevations within the floodplain.

*New construction means, for the purposes of determining insurance rates, structures for which the "start of construction" commenced after August 1, 1987 [the effective date of the initial FIRM] and includes any subsequent improvements to such structures. For floodplain management purposes, "new construction" means structures for which the "start of construction" commenced after November 18, 1986 [the effective date of the first floodplain management ordinance adopted by the community] and includes any subsequent improvements to such structures.

*New manufactured home park or subdivision means a manufactured home park or subdivision for which the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including at a minimum, the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads) is completed after November 18, 1986. [the

effective date of the first floodplain management regulations adopted by a community].

North American Vertical Datum (NAVD) has replaced the National Geodetic Vertical Datum of 1929 in existing and future FEMA flood modernization maps.

Recreational vehicle means a vehicle, which is:

(1) Built on a single chassis;

(2) Four hundred square feet or less when measured at the largest horizontal projection;

(3) Designed to be self-propelled or permanently towable by a light-duty truck; and

(4) Designed primarily not for use as a permanent dwelling but as temporary living quarters for recreational, camping, travel,

or seasonal use.

Start of construction means the date the development permit was issued, provided the actual start of construction, repair, reconstruction, or

improvement was within 180 days of the permit date. The actual start means the first placement of permanent construction of the structure such as the pouring of slabs or footings, installation of piles, construction of columns, or any work beyond the stage of excavation, and includes the placement of a manufactured home on a foundation. (Permanent construction does not include initial land preparation, such as clearing, grading and filling; nor does it include the installation of streets and/or walkways; nor does it include excavation for a basement, footings, piers or foundations or the erection of temporary forms; nor does it include the installation on the property of buildings appurtenant to the permitted structure,

such as garages or sheds not occupied as dwelling units or part of the main structure. (NOTE:

accessory structures are not exempt from any ordinance requirements) For a substantial improvement, the actual start of construction means the first alteration of any wall, ceiling, floor, or other structural part of a building, whether or not that alteration affects the external dimensions of the building.

Structure means a walled and roofed building that is principally above ground, a manufactured home, a gas or liquid storage tank.

Subdivision means the division of a single lot into two or more lots for the purpose of sale or development.

Substantial damage means damage of any origin sustained by a structure whereby the cost of restoring the structure to its before damaged

condition would equal or exceed 50 percent of the market value of the structure before the damage occurred.

Substantial improvement means any reconstruction, rehabilitation, addition, or other improvement of a structure, taking place during a fiveyear period, in which the cumulative cost equals or exceeds 50 percent of the market value of the

structure prior to the "start of construction" of the improvement. NOTE: The market value of the

structure should be (1) the appraised value of the structure prior to the start of the initial repair or improvement, or (2) in the case of damage, the

value of the structure prior to the damage occurring. This term includes structures, which have incurred "substantial damage", regardless of the

actual amount of repair work performed.

For the purposes of this definition, "substantial improvement" is considered to occur when the first alteration of any wall, ceiling, floor, or other structural part of the building commences, whether or not that alteration affects the external dimensions of the building. The term does not, however, include (1) those improvements of a structure

required to comply with existing violations of state or local health, sanitary, or safety code specifications which are solely necessary to assure safe living conditions and which have been identified by the code enforcement official, and not solely triggered by an improvement or repair

project, or (2) any alteration of a "historic structure" provided that the alteration will not preclude the structure's continued designation as a "historic structure".

Substantially improved existing manufactured home parks or subdivisions means where the repair, reconstruction, rehabilitation or improvement of the streets, utilities and pads equals or exceeds 50 percent of the value of the streets,

utilities and pads before the repair, reconstruction or improvement commenced.

Variance means a grant of relief from the requirements of this article, which permits construction in a manner otherwise prohibited by this article.

Violation means the failure of a structure or other development to be fully compliant with the community's floodplain management regulations.

A structure or other development without the elevation certificate, or other certifications, or other evidence of compliance required by this

article is presumed to be in violation until such time as that documentation is provided.

(Ord. of 7-5-2010, § art. 6) Chapter 31

RESERVED

Chapter 32

HEALTH AND SANITATION

ARTICLE I. IN GENERAL

Sec. 32-1. Food service regulations adopted.

This board hereby adopts, for enforcement purposes, the "Rules and Regulations for Food Service Chapter 290-5-14 adopted by the Georgia Department of Human Resources", as amended to

date (a copy of which is attached hereto and incorporated herein) and as hereafter amended by the Environmental Health Section of the Georgia Department of Human Resources.

(Ord. of 2-13-2003, § 1; Ord. of 11-8-2007) Secs. 32-2—32-11. Reserved.

ARTICLE II. BOARD OF HEALTH

DIVISION 1. GENERALLY

Secs. 32-12—32-30. Reserved.

DIVISION 2. RULES OF PRACTICE AND

PROCEDURE

Sec. 32-31. Definitions.

The following words, terms and phrases, when used in this article, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning:

The words "shall," "must," and "will" mean mandatory action. The words "may," "might," "can," and "could" mean discretionary action.

Board means the county board of health.

Department means the department of human resources of the state.

Director means the chief executive officer of the board as defined in O.C.G.A. §§ 31-3-11 and 31-3-15.

Health authority means the department of human resources, the county board of health and their agents.

Hearing means a right of the county board of health and persons and parties affected by an action or an intended action of the board to present testimony, documentary evidence and arguments as to why such action should or should not be taken.

Hearing officer means the director or the director's appointee.

License means and includes the whole or part of any permit, certificate, approval, registration or similar form of permission granted by the

health authority.

Notice of hearing, for the purpose of enforcement of rules or rule making, means a written statement of either the substance of a specific

charge alleging violation of any rule or statute or the substance of a proposed rule to be considered, which will afford actual notice to affected persons.

Party means each person or agency named or admitted as a party, or properly seeking and entitled as a right to be admitted as a party.

Person means any individual, partnership, corporation and association and may be extended and applied to bodies politic and corporate.

Rule means any regulation, standard or statement of general or particular applicability that implements, interprets or prescribes procedure or

practice requirements.

(Ord. of 2-13-2003, § I) Sec. 32-32. Informal hearings.

Informal hearings may be held for the limited purposes of education, warning, seeking voluntary compliance or for the gathering of data or information. An informal hearing shall not result

in administrative action and the formality of legal notice, taking testimony under oath and a transcript may be dispensed with. Unless precluded by law, disposition may be made at any time by

the health authority and the parties affected by an action of the health authority by settlement or mutual agreement to bring the parties into compliance with the Health Code and the applicable rules and regulations.

(Ord. of 2-13-2003, § II) Sec. 32-33. Duties and authority of the hearing officer.

The hearing officer shall have the authority and duty to:

(1) Administer oaths and affirmations;

(2) Sign and issue subpoenas and other compulsory processes;

(3) Rule upon offers of proof;

(4) Regulate the course of the hearing;

(5) Set the time and place for continuances and fix the time for filing briefs;

(6) Dispose of motions to dismiss for lack of legal authority over the matter in controversy, or motions to dismiss for any other ground before the hearing starts; however, motions on technical grounds to dismiss claims, charges and proceedings during the hearing will not be entertained by the hearing officer;

(7) Dispose of motions to amend or intervene;

(8) Approve the taking of testimony by deposition or interrogatory;

(9) Reprimand or exclude from the hearing any person for improper conduct during the hearing or adjourn the hearing if unable to obtain reasonable order;

(10) Submit findings, recommendations and reports to the board pursuant to O.C.G.A.

§ 31-5-2.

If the director will be acting for the board in making a final decision on the outcome of a hearing, the director shall not also act as the hearing officer on that hearing, but shall appoint another capable person as hearing officer.

(Ord. of 2-13-2003, § III) Sec. 32-34. Formal hearings on licenses and similar rights.

Any action to revoke, suspend or deny a license or similar right to any party or person cannot be taken without giving the affected party notice of the intended action and offering an opportunity for a hearing.

(1) Procedure prior to a formal hearing.

a. Notice required. The health authority shall give the affected party or parties at least five business days

notice in person or by certified or registered mail or statutory overnight delivery of its intentions to revoke, suspend, or deny a license or

similar right. If the board finds that the public health or safety requires emergency action, notice shall be given and an emergency hearing offered without the necessity of conforming to the normal time limits.

b. Contents of notice. The notice for all hearings shall include:

1. The time and place of the hearing, giving due regard to the convenience and necessity of the

parties.

2. The purpose of the hearing and a statement of the facts alleged so that the parties may adequately prepare for the hearing.

3. A statement of the legal authority under which the hearing is to be held.

4. A reference to the particular section or sections of the statute, rule or regulation involved.

5. A statement as to the right of the parties to subpoena witnesses and documentary evidence through the hearing officer.

6. A statement that all parties may be represented by legal counsel and present evidence on all the issues involved.

(2) Procedure during formal hearings.

a. Opening formalities. The hearing shall be opened promptly at the time fixed in the notice of the hearing. At the beginning of the hearing, the hearing officer should make a brief summary of the issues involved and the purpose of the hearing.

b. Course of hearing. The order of presentation at the hearing shall be somewhat flexible. Generally, the following procedure will be adhered to:

a. The board's agent who asserts the claim or makes the charge shall present proof and examine their first witness;

b. The opposing party and their witness shall then be heard;

c. The giving of testimony by each respective party and their witnesses is subject to appropriate cross-examination by the other

party;

d. The hearing officer may call or recall a witness as the necessity of a case dictates. Each party shall be given reasonable

and adequate time to complete their case. The hearing is not considered complete until all parties to the controversy have completed giving testimony and arguments.

c. Rules of evidence. The rules of evidence as applies in civil cases in the superior courts of the state shall be

reasonably followed, though the strict rules of evidence and technical procedures will not be applied.

d. Record of hearing. A record of the hearing shall be kept including:

1. All pleadings, motions, and intermediate rulings;

2. All other evidence received or considered, including a written summary of the oral testimony, except that oral testimony or any part thereof shall be actually recorded and transcribed if any party requests it, and agrees

to pay for such, transcription.

3. A statement of the matters officially noticed;

4. Any opinion or report of the hearing officer;

5. All staff memoranda or data submitted to the hearing officer or members of the board in connection with their consideration of the case;

6. Documents, reports, data and other information obtained during a hearing from any person, firm, county and other public

authority or political subdivision. Where such matters relate to secret processes or formulas, or where such matters were obtained on a confidential

basis they shall be classified as confidential and privileged documents and upon their receipt the hearing officer shall label

each of these documents "Confidential and Privileged - Not for Release". Such documents

shall be maintained in a safeguarded file and shall not be included in the record of the

hearing.

(3) Procedure following formal hearings.

a. Findings and recommendations. At the conclusion of the hearing, the hearing officer shall write an opinion giving their finding of facts and their recommendations for board action.

In addition, the hearing officer shall furnish each party a copy of this opinion within fifteen calendar days after the hearing.

b. Exceptions to findings. All parties to the hearing have the right to file with the board a written exception to the finding of facts within ten calendar days after receiving a copy of the hearing officer's opinion.

c. Decision on hearings. The board, or chief executive officer acting for the Board, shall make a final decision in writing, stating the facts supporting the decision, within thirty calendar days following the date of receipt of the opinion of the hearing officer and shall send by certified mail a copy of this final decision to the parties affected by the decision except that:

1. When the complexities of the issues or the length of the record require more than thirty calendar days in which to make

a decision, the board or chief executive officer acting for the board, upon written notification to the parties, may extend the period and shall render the

decision at the earliest date practicable;

2. When an emergency action is instituted, the board or the director acting for the board is empowered to immediately render the final decision after a hearing thereon. The final decision of the board or the director acting for the board shall be expressed in clear and simple

terms so that all parties receiving a copy of the decision will have no doubts as to the outcome of the hearing or the action required to be taken as a result.

d. Appeal from the decision. Any party aggrieved or adversely affected by any final order or action of the board may have a review of that decision by appeal to the department of human resources. That appeal, and any subsequent appeal to the superior

court, shall be in accordance with O.C.G.A. § 31-5-3 and other applicable law.

(Ord. of 2-13-2003, § IV) Sec. 32-35. Rulemaking.

The applicable provisions of O.C.G.A. title 31, article 5 shall apply to adoption of rules and regulations by the board of health and except where these rules afford longer notice to affected parties, the statutes shall govern when there is

conflict between these rules and the statutes.

(1) Procedure prior to hearings on rules.

a. Preparation of draft for adoption or amendment of rules. When in the judgment of the board it is deemed desirable or necessary to adopt or amend rules, the director shall prepare or cause to be prepared a draft of such rules or amendments and

such draft shall:

1. Contain only rules that reasonably adapt to the purposes intended and be within the scope of the powers and duties of the

board as determined by O.C.G.A.

title 31;

2. State the legal authority empowering the board to adopt and promulgate rules;

3. State the title and purpose of the rules;

4. Provide such definitions as are necessary to assure reasonable uniformity in interpretation and enforcement of the rules.

b. Preparation of draft for repeal of rules. When in the judgment of the board it is deemed desirable or necessary to adopt a rule or amendment to a rule which adoption includes the

repeal of a rule already in existence, the proposed rule or amendment together with the repealing language will be the subject of a formal hearing. If the board wishes to repeal a rule already in existence without substituting another in its place, that repeal alone must be the subject of a

formal hearing. The director shall prepare or cause to be prepared a draft of the motion of repeal with the reasons advanced for such repeal, and such drafts shall:

1. Contain only the motions to repeal that reasonably adapt to the purposes intended and must

be within the scope of the powers and duties of the board as determined by O.C.G.A. title

31;

2. State the legal authority empowering the board to repeal the rule or rules;

3. State the title and purpose of the rule or rules to be repealed.

c. Review of draft. The board in regular session or in a special session called for that purpose, shall review the draft and make additions, deletions or amendments thereto, as are agreed to be a majority vote of a quorum of the board; provided, however, at the discretion of the board's chairperson, notice may be given to affected parties and a hearing may be held

prior to the board's review.

d. Petition for rule making. An interested person may petition the board requesting the promulgation, amendment or repeal of a rule. Within 30 days after submission of a petition,

the board shall either deny the petition in writing, stating the reasons for that denial, or shall initiate its

normal rule making or repeal proceedings in accordance with the request.

e. Notice. Prior to the adoption, amendment or repeal of any rule, other than an interpretive rule or a general statement of policy, the board shall give seven calendar days notice

of hearing of its intended rule making. Such notice shall include a statement of the substance of the proposed rule or the rule to be repealed, and the time, the place, and the

manner in which interested persons may present their views thereon.

The notice of the hearing shall be given to:

1. Affected parties, except when the parties are so numerous as to make individual notices impracticable; notice then shall be given by publication in one

or more newspapers calculated to afford actual notice to affected parties;

2. The secretary of any association, corporation or organization having a membership likely to be affected by the intended

action;

3. All persons who have requested in writing that they be placed on a mailing list for advance notice of the board's rule making proceedings, and who have paid the administration charge

set by the board, for postage and handling.

If the board finds that an imminent threat to the public health requires adoption of a rule upon fewer than seven calendar days notice of hearing and states in writing reasons for that finding, the board may proceed

with an emergency notice of hearing and with an immediate hearing. After the hearing the board may take such action as it deems necessary

relative to the adoption of the emergency rule, stating in writing the reasons for the particular action

taken.

(2) Procedure during hearings on rules.

a. Opening formalities. The hearing shall be opened promptly at the time fixed in the notice of hearing. At the beginning of the hearing, the hearing officer shall make a brief summary of the purpose of the hearing and the rules involved.

b. Course of hearing. The order of presentation in the hearing shall be flexible. The hearing officer shall afford to all affected persons reasonable opportunity at the hearing to submit testimony, documentary evidence, and arguments orally or in writing. All persons shall be afforded

a reasonable opportunity to be heard, but the hearing officer may impose reasonable guidelines for the orderly conduct of the hearing when necessary due to time limitations, number of persons wishing to speak, and

other factors.

c. Record of hearing. The board shall provide secretarial services at hearings to record data, pertinent views, and argument presented, or, in place

of this, a recording device to record all orally submitted data, views, and arguments. When a recording device is used, the hearing officer shall prepare or have prepared, a written summary of all the pertinent data

which shall be retained in the file of record.

C. Procedure following hearings on rules.

a. Report to the board. The hearing officer shall consider all written and oral submissions with respect to the proposed rule, amendment or repeal and shall summarize the same in writing in a report to the board. The hearing officer shall also furnish upon request a copy of this report to any party affected by the rule, amendment, or repeal.

b. Adoption of the rule. After the hearing and review as set forth above, the board in a regular or special

called session shall consider the report submitted by the hearing officer and take such action as it deems

appropriate. Upon majority vote favoring the adoption of the proposed rule, amendment or repeal, the secretary of the board shall insert or shall have inserted in the appropriate place on the record:

1. The date and method by which notice of hearing was given;

2. The time and the place of the hearing;

3. The date of the adoption of the rule, amendment, or repeal;

4. The date the action shall become effective; provided that no rule or amendment of a rule

shall become effective until at least 30 days after its adoption, except an emergency rule shall become effective upon its adoption and remain in force for a period of not longer than 120

days. The board must also state in writing the conditions warranting immediate effectiveness. Subsequent adoption of the same rule under the general provisions is not precluded.

c. Permanent record of rules. The chairperson and the secretary of the board shall sign the rule, amendment, or

repeal and the board's secretary shall assure its placement in a book maintained for the purpose of keeping an orderly, properly indexed copy of each

rule. This book shall be available for reasonable inspection by any person during regular business hours. Copies of board adopted rules and regulations shall be made available for distribution to persons interested in

or affected thereby. The board is authorized to provide for the duplication, printing or other reproduction of its rules and regulations and the

distribution thereof.

(Ord. of 2-13-2003, § V) Secs. 32-36—32-50. Reserved.

DIVISION 3. BY-LAWS OF THE COUNTY

BOARD OF HEALTH

Sec. 32-51. Name.

This board is created pursuant to the provisions of O.C.G.A. ch. 31-3, pertaining to county boards of health. This board shall be named the

"Madison County Board of Health" and shall be referred to hereinafter as the "board of health".

(Ord. of 2-13-2003, art. I) Sec. 32-52. Functions and powers.

The functions and powers of the board of health are those specifically bestowed on it by O.C.G.A.

ch. 31-3 and other applicable law, together with all implied functions and powers. These by-laws are adopted for the governance of the Board pursuant to authority of O.C.G.A. § 31-3-4.

(Ord. of 2-13-2003, art. II) Sec. 32-53. Membership.

The board of health shall comprise seven members as provided in O.C.G.A. § 31-3-2. Composition of the board, appointments, terms of members, notification of vacancies, and appointment and qualification of members to fill vacancies

shall all be according to that section and other applicable law.

(Ord. of 2-13-2003, art. III) Sec. 32-54. Oath of office.

As prescribed by O.C.G.A. ch. 45-3, the oath of office shall be administered by an appropriate officer to each newly appointed board of health member. Oaths shall be filed in the office of the appropriate county official as specified in O.C.G.A.

§ 45-3-5.

(Ord. of 2-13-2003, art. IV) Sec. 32-55. Officers.

(a) Titles of officers. The officers of the board of health shall be the chairperson, vice-chairperson, and the secretary.

(b) Election of officers. The officers shall be elected at the first regular meeting of each new calendar year. Officers will hold office until successors are elected. If an office is vacated prior to the expiration of the officer's term, an election

shall be held at the next scheduled meeting of the Board in order to elect a member to fill the

vacancy. This election shall precede the discussion or conduct of any other business. The board may, if it so desires, call a special meeting for the purpose of electing a board member to fill the

vacancy.

(c) Duties of officers.

(1) Except as otherwise provided in these by-laws, the chairperson shall call and preside at all meetings and shall be a member ex officio of any or all board appointed committees.

(2) The vice-chairperson, in the absence of the chairperson, shall assume all the duties and authority of the chairperson.

(3) The secretary shall ensure that accurate and complete minutes of all meetings are kept and preserved in accordance with O.C.G.A. § 31-3-8, shall call meetings on order of the chairperson or others authorized by these by-laws to call meetings, attend to all correspondence, and perform

such other duties as ordinarily pertain to the office, or as are assigned or delegated by the chairperson.

(Ord. of 2-13-2003, art. V) Sec. 32-56. Meetings.

(a) Generally. All meetings of the board shall be conducted in accordance with the provisions of O.C.G.A. ch. 50-14, concerning open meetings.

The provisions of these by-laws shall control where they require more notice.

(b) Regular meetings. Regular meetings shall be held no less frequently than quarterly at a date, time, and location agreed upon by a majority of the board members and entered upon the

minutes. Notice of this schedule of regular meetings shall be posted and maintained in a conspicuous place available to the public at the meeting place specified in the minutes.

(c) Special meetings.

(1) Special meetings of or by the board may be called at any time by the chairperson;

any four members of the board; or, by the director of the northeast health district.

At any special meeting, no business shall be transacted except that stated in the notice calling the meeting.

(2) Due notice (as defined in O.C.G.A. § 50- 14-1(d) shall be given of any special meeting to be held, which shall include the posting of a written notice for at least 24

hours at the place of regular meetings and giving of written or oral notice at least 24 hours in advance of the meeting to the legal organ in which notice of sheriff's sales are published in the county where regular meetings are held or, at the option of the board, to a newspaper having a general circulation in that county at least equal to that of the legal organ. When special circumstances occur and are so declared by the board, the board may hold a meeting with less than 24 hours notice upon giving such notice of the meeting and the subjects expected to be considered at that meeting as may be reasonable under the circumstances, including notice to said county legal organ or newspaper having a general circulation in the county at least equal to that of the legal organ, in which event reason for holding the meeting within 24 hours and the nature of the notice shall be recorded in the minutes.

(3) Whenever notice is given to a legal organ or other newspaper, that publication shall immediately make the information available upon inquiry to any member of the public. Any oral notice required or permitted by this subsection may be given by telephone.

(d) Quorum. Four members of the board shall comprise a quorum for the conduct of business.

(e) Open meetings.

(1) All meetings, as defined by O.C.G.A. § 50- 14-1, shall be open to the public and visual, sound, and visual and sound recording during open meetings shall be permitted, except that meetings may be

closed in the circumstances set forth in subsection (2) hereinafter, upon the following procedure. No meeting shall be closed to the public except by a majority

vote of the quorum present for the meeting and the minutes of the meeting shall reflect the names of the members present

and the names of those voting for closure.

The specific reasons for such closure shall be entered upon the official minutes. Where a meeting of the board is devoted in part to matters in the exception set forth below, any portion of the meeting not subject to any such exception, privilege, or confidentiality shall be open to the public and the minutes of such portions not subject

to any such exception shall be taken and recorded and open to public inspection.

(2) The board may close a meeting pursuant to the procedures set forth in subsection (1), above, when:

a. The board wishes to consult and meet with legal counsel pertaining to pending or potential litigation, settlement, claims, administrative proceedings, or other judicial actions brought or to be brought by or against the board or any officer or employee or in which the board or any officer or employee may be directly involved; provided, however, the meeting may not be closed to advice or consultation on whether to close a

meeting;

b. Staff meetings are held for investigative purposes under duties or responsibilities imposed by law;

c. The board is meeting to discuss the future acquisition of real estate, except that such meetings shall be subject to the requirements of law

for the giving of notice of such a meeting to the public and preparing the minutes of such a meeting; provided, however, the disclosure of such portions of the minutes as would

identify real estate to be acquired may be delayed until such time as the acquisition of the real estate has been completed, terminated, or abandoned, or court proceedings with respect thereto initiated;

d. When the board is meeting to discuss or deliberate upon the appointment, employment compensation, hiring, disciplinary action or dismissal, or periodic evaluation or rating of a

public officer or employee but not when receiving evidence or hearing argument on charges filed to determine disciplinary action or dismissal of the public officer or employee. The

vote on any matter covered by this subsection shall be taken in public and the minutes of the meeting will be made available. Meetings by the board to discuss or take action on the filling of a vacancy and the membership of the board itself shall at all times be open to the public as provided by law.

(f) Agenda and minutes.

(1) The agenda at any regular meeting shall be as follows:

a. Call to order.

b. Election of officers (when applicable).

c. Acceptance of the minutes of the last regular and all intervening special meetings.

d. Old business.

e. Reporting of committees.

f. New business.

g. Review and analysis of the services of the county health department.

h. Discussion and recommendations.

i. Adjournment.

(2) The agenda at a special meeting shall be as follows:

a. Reading of the notice calling the meeting.

b. Discussion and enactment of the business for which the meeting was called.

c. Adjournment.

An agenda of the subjects acted on and those members present at a meeting of the board shall be written and made available to the public for inspection within two business days of the adjournment of a meeting of the board. The minutes of the meeting of the board shall be properly

recorded and such records shall be open to public inspection once approved as official by the board, but in no case later than immediately following

the next regular meeting of the board; provided, however, nothing contained herein shall prohibit the earlier release of minutes, whether approved by the board or not. Said minutes shall, as a minimum, include the names of the members present at the meeting, an accurate transcription of each motion or other proposal made, and a record of all votes. In the case of a roll call vote, the name of each person voting for or against a

proposal shall be recorded and, in all other cases, it shall be presumed that the action taken was

approved by each person in attendance unless the minutes reflect the names of the persons voting against the proposal or abstaining.

(Ord. of 2-13-2003, art. VI) Sec. 32-57. Amendments.

The by-laws may be amended by majority vote at a regular meeting following a meeting at which notice of proposed amendments is given. At the discretion of the board, a special committee of board members may be appointed by the chairperson to report on the amendments prior to their adoption. Amendments shall be effective when

adopted by the board.

(Ord. of 2-13-2003, art. VII) Sec. 32-58. Adoption.

These by-laws shall be adopted by majority vote at any regular meeting of the board and shall replace any previous bylaws. They shall become

effective upon board adoption.

(Ord. of 2-13-2003, art. VIII) Secs. 32-59—32-70. Reserved.

ARTICLE III. RABIES CONTROL RULES

AND REGULATIONS OF MADISON

COUNTY

Sec. 32-71. Title.

[This article shall be referred to as] Rabies Control Rules and Regulations of Madison County.

(Ord. of 8-12-2010, § 1) Sec. 32-72. Legal authority.

Pursuant to the authority vested in the Madison County Board of Health under O.C.G.A. tit.

31, ch. 3, and more particularly by ch. 19, the Madison County Board of Health adopts the following rules and regulations for the control of rabies within said county.

(Ord. of 8-12-2010, § 2) Sec. 32-73. Purpose.

[The purpose of this article is] to prescribe regulations for the prevention, control and reporting of rabies within Madison County by providing for the vaccination, tagging, and certification of dogs, cats and ferrets; the confinement or other

disposition of dogs, cats, ferrets and other animals; to specify reporting procedures, quarantine measures; and to establish a rabies control officer.

(Ord. of 8-12-2010, § 3) Sec. 32-74. Definitions.

The following terms as used in this article shall have the meanings hereinafter respectively ascribed to them:

Board means the Madison County Board of Health, State of Georgia.

Cat means Felis domesticus of either sex, vaccinated or not vaccinated against rabies.

Certificate means the National Association of State Public Health Veterinarians Form NASPHV# 51, Rabies Vaccination Certificate, or any other forms containing the same information approved by the board.

Department means the Department of Community Health, State of Georgia.

Director means the chief executive of the board as defined in O.C.G.A. tit. 31, ch. 3, or in his absence, subject to approval of the board, a member of said board appointed by the chairman for the purposes enumerated herein.

Dog means Canis familiaris, of either sex, vaccinated or not vaccinated against rabics.

Exposure means the introduction or possible introduction of the rabies virus into bite wounds or open cuts in skin or onto mucous membranes.

There are two categories of exposure, bite and non-bite:

Bite: Any penetration of the skin by the teeth of an animal.

Non-bite: The contamination of open wounds, abrasions, mucous membranes, or scratches with saliva or other potentially infectious material (such as neural tissue) from an animal.

Scratches from cats are included.

Ferret means Mustela putorius furo, of either sex, vaccinated or not vaccinated against rabies.

Owner means any person having a right of property in a dog, cat, ferret or other domesticated animal, and any person who permits a dog, cat, ferret or other domesticated animal to remain on his or her premises for more than three days.

Person means any individual, firm, caretaker, corporation, partnership, municipality, county, society, or association.

Rabies vaccination tag means a tag meeting the standard tag system for year, color and shape determined by the National Association of State Public Health Veterinarians, furnished by the veterinarian, for vaccinated dogs, cats and ferrets, and to be worn by the vaccinated animal as specified in subsection 32-75(c). The tag shall

include the veterinarian's or clinic's name and phone number on it.

Stray means any unlicensed and/or unattended animal off the premises of its owner with no identification tags or marked collars.

Vaccinate or inoculate means the injection of antirabic vaccine by a veterinarian into the proper site of the animal. The injected dose shall be in

accordance with the amount and schedule prescribed by the manufacturer's instructions.

Vaccine means an injectable material containing inactivated or attenuated rabies virus, licensed by the United States Department of Agriculture, Biological Control Section and approved by the Georgia Department of Community Health.

Vaccine used for the purposes of this regulation shall be stored at the temperature prescribed on the package label. Outdated vaccine or vaccine showing any signs of spoilage or appearing otherwise unfit for producing immunity against rabies shall not be used.

Veterinarian means any person who holds a license to practice the profession of veterinary medicine in the State of Georgia.

(Ord. of 8-12-2010, § 4) Sec. 32-75. Provisions.

(a) Vaccination of dogs, cats, and ferrets. The owner of a dog, cat, or ferret three months old or older shall cause such dog, cat, or ferret to be

vaccinated against rabies as defined by this article, and if such dog, cat, or ferret is less than one year of age upon vaccination, it shall be revaccinated at least one year from the date of the original vaccination. When dogs or cats one year

of age or older are vaccinated with a vaccine approved by the department as providing threeyear protection, such animals shall be revaccinated within three years. When other approved vaccines are used, yearly inoculations shall be

required for dogs, cats, and ferrets.

(b) Certificate of vaccination.

(1) Any veterinarian is authorized and required in connection with his or her practice to issue certificates of vaccination and vaccination tags. Evidence of vaccination

shall consist of a certificate of vaccination.

The certificate with each item answered shall be prepared in triplicate and signed by the veterinarian administering the vaccine. He or she shall furnish one copy to the animal's owner, one copy to Madison

County Health Department, and retain one copy for his or her files.

(2) The certificates of vaccination furnished to Madison County Health Department, by the veterinarian, shall be maintained by Madison County Health Department in an orderly, indexed file until such certificates have expired.

(c) Vaccination tags.

(1) Coincident with the issuance of the certificates of vaccination, the veterinarian shall also furnish to the owner of the vaccinated dog, cat, or ferret a serially numbered tag meeting the standard tag system, bearing the same number and year thereon as the certificate bears.

(2) The tag shall be securely attached by the owner to the collar or harness worn by the dog for which the certificates and tags have been issued.

(3) In lieu of a cat or ferret wearing a vaccination tag, the owner of a cat or ferret shall be required, upon request of the

Madison County Health Department or Madison County Animal Control, to provide a copy of the animal's certificate of vaccination as proof of current vaccination.

(d) Clinics.

(1) When there are no veterinarian sponsored public clinics provided, the board is authorized to operate or cause to be operated county sponsored clinics for the vaccination of dogs, cats, and ferrets against rabies.

(2) Vaccination shall be performed by a licensed veterinarian.

(3) Vaccination fee for such clinics shall be predetermined by the board. Public notice of the schedule of the clinics shall be given in advance of the first clinic appearing on the schedule. Such notice shall include the day, the hour, the place, and the vaccination fee.

(e) Rabies control officer.

(1) Unless otherwise directed by the board, an employee of the Madison County Health Department shall be the rabies control officer.

(2) The duties of the rabies control officer are:

a. To investigate and maintain a record of animal bites in the county.

b. To insure proper confinement or other disposition of an animal involved in a bite; or if the animal is dead or killed, to submit the animal's head for laboratory examination if required.

c. To enforce proper disposition of animals exposed to known rabid animals.

d. To assist, as needed, in the planning and coordination of rabies vaccination clinics.

e. Such other duties necessitated by these rabies control regulations or as ordered by the director.

(f) Confinement and disposition of dogs, cats, ferrets and other animals involved in bites or having contact with suspected or known rabid animals.

(1) The rabies control officer will maintain enforcement of all regulations pertaining to the confinement or other appropriate disposition of dogs, cats, ferrets or other animals.

(2) The owner of any dog, cat, ferret, or other animal as specified in this section shall confine, cause to be confined or shall dispose of such animal as prescribed herein:

a. A healthy dog, cat or ferret, whether vaccinated or not, which has bitten a person or other domestic animal shall be confined for a period of ten days following the date of the bite. However, in the case of wild animals and domesticated wild animals for which

no safe confinement period has been established, or in the case of feral dogs or cats, or by consent of owner for owned dogs or cats, the animal shall be destroyed promptly, decapitated and its brain tissue analyzed for indication of rabies.

b. A dog, cat, ferret or other animal, whether vaccinated or not, having signs suggestive of rabies, as described by George M. Baer in the Natural History of Rabies, 2nd Edition, CRC Press, 1991, shall be confined and kept in isolation until its death, and otherwise released only

when symptoms have disappeared as adjudged by a veterinarian. However, if confinement is not appropriate or practical, the animal shall be destroyed and its brain tissue analyzed for evidence of rabies.

c. Any healthy dog, cat, ferret or other animal for which rabies vaccination effectiveness has been established and having a current vaccination at least 28 days prior to being exposed to a potentially rabid animal, shall be revaccinated and then confined in a manner approved by the director for 45 days; thereafter, it shall be released to the owner if the animal exhibits no signs of rabies as adjudged by a veterinarian.

d. A dog, cat, ferret or other animal which has not been vaccinated or which was not vaccinated at least 28 days prior to being exposed to a potentially rabid animal shall be immediately destroyed or if the owner is unwilling to destroy the exposed

animal it shall be confined in strict isolation in a location approved by the director for a period of six months.

The confined animal must be vaccinated by a veterinarian five months after the bite.

(g) Establishment of infected area quarantine.

Whenever the department of community health may declare Madison County or any area within an "infected area" pursuant to O.C.G.A. tit. 31, ch.

19, § 2, then every dog, cat or ferret in said infected area shall be quarantined and confined to the owner's or custodian's premises during the

entire period of time for which said declaration of the department is in effect.

(h) Confinement area or facility.

(1) Confinement area or facility to which a dog, cat, ferret or other animal is confined in compliance with the provisions of this article shall be an animal shelter, kennel, animal hospital, or such other place as designated by the director, or in certain cases may be a private residence as specified in subsections (h)(2) and (h)(4) of this section.

(2) A dog, cat or ferret which has a current vaccination certificate and which has bitten a person or other animal may be confined to the owner's residence for ten

days following the bite. It shall be the owner's responsibility to provide proof of vaccination. Where residential confinement is allowed the owner shall confine such animal to a fenced-in area, an enclosed outbuilding, or in the owner's personal dwelling in such a manner as to prevent contact between the confined animal and other animals or persons other than the owner.

(3) Unless otherwise authorized by the director, unvaccinated biting animals and animals to be confined as prescribed in subsections (f)(2)b. and d. herein shall be confined in an animal shelter, kennel or

animal hospital at the owner's expense.

Such facility shall provide for the following:

a. Construction and management which will keep the animal dry, clean, prevent its escape and prevent its contact with both people and other animals.

b. A method and procedure for the identification of the animal and the recording of the date of its admission to the area or facility.

c. Assurance that the animal will have safe and adequate water and food.

d. Adequate space for the animal's exercise.

e. Protection against excessive cold and heat.

f. Space, cages, pens and other necessary equipment to isolate the animal for its protection against injury and

infectious diseases.

(4) Unless ordered otherwise by the director, animals to be confined as prescribed in subsection (f)(2)c. herein may be kept under the owner's control and observed at the owner's residence for 45 days. The

animal shall not be permitted to roam freely and must be restricted to leash walks, if applicable. At the first sign of illness or behavioral change in the animal, the Madison County Health Department shall be notified immediately and the animal shall be evaluated by a veterinarian.

(i) Animal impoundment and control.

(1) Any dog, cat or ferret less than three months old shall be confined to the owner's premises or kept on a leash.

(2) The owner of any dog, cat or ferret brought into Madison County for a permanent stay from outside the county shall cause such dog, cat or ferret to be vaccinated in accordance with these rules and regulations except, however, that when the owner of such dog, cat or ferret produces evidence satisfactory to the director that such dog, cat or ferret has been vaccinated in a manner and by procedures comparable to the requirements of this

regulation, then a Madison County certificate of vaccination and a vaccination tag may be issued in lieu of revaccination.

(3) Any dog, cat or ferret brought into Madison County on temporary stay not exceeding 14 days shall be confined or on a leash at all times.

(4) Any dog, cat, ferret or other animal running at large may be impounded in a manner specified by the city and county

governing bodies. If the animal bears a vaccination tag, a reasonable effort to locate the owner shall be made. Any unvaccinated dog, cat or ferret which is reclaimed by its owner or adopted during the period of impoundment shall be vaccinated against rabies as required by these regulations within 72 hours of release.

Any vaccinated dog, cat or ferret impounded because of lack of rabies vaccination tag may be reclaimed by its owner by furnishing proof of rabies vaccination and

by compliance with impoundment regulations prior to release.

(j) Reporting.

(1) The owner or custodian of any animal having signs suggestive of rabies, as described by George M. Baer in the Natural History of Rabies, 2nd Edition, CRC Press,

1191, shall confine the animal and immediately notify the director, reporting any information regarding any person or animal bitten or attacked by said animal.

(2) Any person bitten by a dog, cat, ferret or other animal or any owner of a dog, cat, ferret or warm blooded animal which has bitten a person shall report the bite to the Madison County Health Department within 24 hours giving all known information relevant to an investigation of the incident by the rabies control officer.

(3) Physicians or other medical personnel including those responsible for hospital emergency rooms shall report incidences of animal bites or scratches treated by them

to the Madison County Health Department within 24 hours.

(4) The director shall report accumulated data relating to rabies in Madison County to the department when in his opinion rabies is prevalent or likely to become prevalent to the extent that quarantine procedures are indicated.

(Ord. of 8-12-2010, § 5) Sec. 32-76. Enforcement.

The enforcement of these rules and regulations shall be in accordance with O.C.G.A. tit. 31, ch. 3, and ch. 19 as amended and with the rules of

practice and procedure of the Madison County Board of Health.

(Ord. of 8-12-2010, § 6) Chapter 33

INDIGENT BURIALS

Sec. 33-1. Establishment of uniform rules for indigent burials.

(a) In accordance with O.C.G.A. § 36-12-5, whenever any person dies in Madison County and the decedent, his family, and his immediate kindred are indigent and unable to provide for his decent interment, the county finance director is

authorized to make available from county funds a sum sufficient to provide a decent interment of the deceased indigent person or to reimburse such person as may have expended the cost thereof voluntarily, up to but not exceeding $500.00.

(b) If the decedent was an inmate under the authority, jurisdiction, or control of the department of corrections, the finance director shall seek reimbursement from the department of corrections pursuant to O.C.G.A. § 36-12-5(b).

(c) A person is "indigent" hereunder if his income is less than 100 percent of the most recent Federal Poverty Guidelines published by the United States Department of Health and Human Services, such guidelines currently being accessible at http://aspe.hhs.gov/poverty/index.shtml#latest.

(Ord. of 1-9-2012(2)) Chapter 34

LAW ENFORCEMENT*

Up-to-date information regarding law enforcement is kept on file and can be viewed in the office of the sheriff.

Chapter 35

CORONER*

Sec. 35-1. [Purpose.]

The Coroner of Madison County in office on the effective date of this ordinance shall be the Coroner of Madison County, Georgia. The coroner shall serve for the same term as provided by law, and compensation shall be fixed as provided by law. Subsequent elections for coroner shall be on the same basis as provided by law for the election of coroners generally. The coroner shall perform the same duties and exercise the same powers as conferred on coroners by the Constitution and laws of Georgia.

(Res. of 9-30-2024, § 2, eff. 1-1-2025) Sec. 35-2. Coroner salary.

(a) The Coroner of Madison County shall receive an annual salary which shall be comprised of the state minimum based off of local population pursuant to O.C.G.A § 45-16-11, and a local supplement amount set by the Madison County

BOC from time to time, payable monthly from county funds.

(b) Local supplements authorized by the Madison County BOC to coroners in addition to the minimum compensation provided by state law may not be reduced or eliminated during any term of office. Local supplements are not subject to longevity increases and COLAs, unless granted by the Madison County BOC.

(c) Pursuant to O.C.G.A § 45-16-27(b) the local supplement salary of the coroner shall be in lieu of all fees, costs, commissions, allowances,

moneys, and all other emoluments and requisites of whatever kind which are allowed coroners by law. All such fees, costs, allowances, moneys, and all other emoluments and perquisites collected

by the coroner shall become funds of the county and shall be paid to the county.

(Res. of 9-30-2024, § 2, eff. 1-1-2025) Sec. 35-3. Collection and remittance of funds.

(a) The Coroner of Madison County shall diligently and faithfully undertake to collect all fees, fines, forfeitures, commissions, costs, allowances, penalties, funds, monies and all other emoluments and perquisites formerly allowed

him as compensation for services in any capacity, and shall receive and hold the same in trust for said county as public monies and shall pay the same into the county treasury on or before the 15th day of each month next following the month in which they were collected or received.

(b) At the time of each such monthly payment into the county treasury, the coroner shall furnish the governing authority of the county a detailed,

itemized statement, under oath, of all such funds received during the preceding month by such officer and paid into the county treasury. The statement shall show the respective amounts of money collected and the source thereof.

(Res. of 9-30-2024, § 2, eff. 1-1-2025) Sec. 35-4. Deputy coroner.

Pursuant to O.C.G.A § 45-16-7(a), "A deputy coroner shall be appointed for each county, and one or more additional deputy coroners may be appointed for any county, in the discretion of the coroner." Pursuant to O.C.G.A. § 45-16-7(c),

"Notwithstanding any law to the contrary, there shall be appointed only one deputy coroner, and, on and after July 1, 1999, there shall only be one deputy coroner in each such county unless

otherwise approved by the local governing authority of the county." Accordingly, the Coroner of Madison County shall be authorized to appoint a

deputy coroner who shall serve only in the absence and in the stead of the coroner. The deputy coroner shall serve at the pleasure of the coroner and may be replaced by the coroner at any time. Each deputy coroner shall take the same oath, give the same bond, and have the same powers as the coroner; but a deputy coroner shall act as coroner only when the coroner is himself/herself unable to act.

(Res. of 9-30-2024, § 2, eff. 1-1-2025) Sec. 35-5. Deputy coroner compensation.

(a) The deputy coroner shall be compensated only for serving as coroner in the absence and in the stead of the coroner, i.e., as to any single death, the death shall be handled by either the coroner or the deputy coroner but not both. In death cases handled by the deputy coroner, the deputy coroner will be treated as a 1099 contracCORONER § 35-5 tor and shall receive a flat rate of $250.00 for all services rendered in connection with the death,

including but not limited to investigation and transportation, regardless of number of transports needed.

(b) The deputy coroner will be paid from an established budget approved by the board of commissioners on an annual base and is not to exceed the approved annual allotted budget.

(c) In the event that additional personnel is required to complete the job duties of the deputy coroner all fees will be deducted from the above mentioned approved budget.

(d) If an outside firm is required for transportation of a deceased person, the vendor must have an account set up with the finance department

and provide a W9 in order to be paid. Payment will come from the allotted budget set by the board of commissioners.

(Res. of 9-30-2024, § 2, eff. 1-1-2025) Sec. 35-6. Duties and responsibilities of the coroner.

(a) It is the responsibility of the coroner to comply with any and all state regulations concerning the issuance of a death certificate per O.C.G.A § 31-10-15.

(b) It is the responsibility of the coroner to handle any and all correspondence or requests relating to the deceased. This also includes necessary transport of a deceased person from scene to morgue, morgue to medical examiner, or medical examiner to morgue. This does not include the transport of a deceased person to a funeral home. The coroner or deputy coroner will be responsible for scheduling release times so the funeral homes can obtain the deceased.

(Res. of 9-30-2024, § 2, eff. 1-1-2025) Sec. 35-7. Transportation of deceased.

Transportation of the deceased includes necessary transport of a deceased person from scene to morgue, morgue to medical examiner, or medical

examiner to morgue. This does not include the transport of a deceased person to a funeral home.

(Res. of 9-30-2024, § 2, eff. 1-1-2025) Sec. 35-8. Operating expenses.

The necessary operating expenses of the coroner's office shall be paid from funds of the county available for such purpose. All supplies, materials, furnishings, furniture, utilities, and equipment, and the repair, replacement and maintenance thereof, as may be reasonably required in discharging the official duties of said office, shall be furnished by the county and shall be paid from funds of the county available for

such purpose. The determination of such requirements shall be at the sole discretion of the governing authority of Madison County. The

coroner will include the cost of such expenses in their annual budget to be submitted before the board of commissioners for approval.

(Res. of 9-30-2024, § 2, eff. 1-1-2025) Sec. 35-9. Uniforms and apparel.

The Coroner of Madison County and one deputy coroner will be provided two pairs of pants, two casual shirts and two dress shirts that are seasonally appropriate, to be used in caring [carrying] out their duties when hired.

Inclement weather apparel such as a rain jacket and/or rain gear will be provided to the coroner and deputy coroner. Should a replacement uniform be needed in the event of damage or excessive staining, the damaged uniform shall be turned over to the county prior to ordering a replacement. Any additional uniforms and apparel desired will be paid for by the coroner or deputy

coroner on their own accord.

(Res. of 9-30-2024, § 2, eff. 1-1-2025) Sec. 35-10. Purchasing.

The coroner and deputy coroner will follow the current purchasing policy set forth in the Code of Ordinances, Division 2, Section 2-249 through

Section 2-256.

(Res. of 9-30-2024, § 2, eff. 1-1-2025) Sec. 35-11. Personal protective equipment.

The Coroner of Madison County and the Deputy Coroner will be provided with appropriate personal protective equipment such as, but not limited to,

gloves, gowns, face shields, masks, Tyvek suits, Tyvek or similar shoe covers, fire boots, and eye protection. The coroner will include the cost of such equipment in their annual budget to be submitted before the board of commissioners for approval.

(1) Personal protective equipment will be considered "appropriate" only if it does not permit blood or other bodily fluids to pass through or to reach the coroners work clothing, skin, eyes, or mouth under normal conditions of use and for the duration of time which the protective equipment will be used.

(2) Any other personal protective equipment that does not meet the state requirements must be brought before the board of commissioners for approval.

(Res. of 9-30-2024, § 2, eff. 1-1-2025) Sec. 35-12. Property provided.

The Coroner of Madison County will be provided by the county a facility to be used as its morgue and office of operations as well as one investigations vehicle to be used only during the investigations of the deceased and one transportation vehicle to be used only in transporting the

deceased from scene to morgue, scene to crime lab, morgue to crime lab only. Such vehicles, when not in use for coroner duties, may be stored at the coroner's home of residence so immediate access is available when needed or be stored at the location of the county provided facility.

(Res. of 9-30-2024, § 2, eff. 1-1-2025) Sec. 35-13. Training.

Pursuant to O.C.G.A § 45-16-6 and O.C.G.A § 45-16-66, the Coroner and Deputy Coroner of Madison County shall be required to take a training course approved by the Georgia Coroner's Training Council every calendar year they are in office as a condition of continuing to serve as the coroner or deputy coroner.

For each calendar year following the year of initial certification, each certified coroner and deputy coroner shall complete 24 hours of additional training in approved courses in order to maintain such certification. Ga. Code. Ann.

112-2-.04.

The coroner and deputy coroner will follow the current education and training guidelines in the county's ordinance; section 2-70 and the separations guidelines described in Section 50-42(g) in the [County's Code of] Ordinance[s].

A copy of all training certifications received shall be submitted to the HR Department to ensure all training records are current for staff.

(Res. of 9-30-2024, § 2, eff. 1-1-2025) Sec. 35-14. Training expenses.

In lieu of any expense allowance stated in O.C.G.A. § 45-16-6, training and/or travel expenses for the coroner and the deputy coroner's annual

mandatory training course will be paid from county funds. Such expenses will be included in the annual budget to be submitted before the board of commissioners for approval. All training and/or travel expenses shall have prior authorization as set forth in the Code of

Ordinances, Chapter 2, Article IV, Div 8 (Travel Policy).

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:madison-county/code/whole@2025-06-30-425b7b0766

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Madison County Code of Ordinances (the whole text) (Part 3 of 5) | Georgia Commons