--- title: Marion County Code of Ordinances, Sec. 26-104. Local development permits collection: local-codes id: local-code:marion-county/code/26-104 cite_as: Marion County, Ga., Code of Ordinances § 26-104 canonical_url: https://georgiacommons.org/counties/marion/code/26-104 md_url: https://georgiacommons.org/counties/marion/code/26-104.md text_url: https://georgiacommons.org/counties/marion/code/26-104/text source_url: https://library.municode.com/ga/marion_county/codes/code_of_ordinances date: 2022-03-08 status: active jurisdiction: county:marion jurisdiction_name: Marion County county_fips: "13197" corpus_version: local-codes-marion-county-3669cc83ad3f publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/marion/code/~chapter-26/~article-iii.md previous: https://georgiacommons.org/counties/marion/code/26-103.md next: https://georgiacommons.org/counties/marion/code/26-105.md index: https://georgiacommons.org/counties/marion.md branch: code edition: As published by Municode, current through 2022-03-08 edition_date_kind: current_through source_publisher: Municode version_id: local-code:marion-county/code/26-104@2022-03-08-c52cc24aa3 --- # Marion County Code of Ordinances, Sec. 26-104. Local development permits > As published by Municode, current through 2022-03-08 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Chapter 26 - ENVIRONMENT / Article III - WETLAND PROTECTION (a) Local development permit requirements. No regulated activity will be allowed within the wetland protection district without written permission from the permitting officer in the form of a local development permit. Issuance of a local development permit is contingent on full compliance with the terms of this and other applicable regulations. All activities that are not identified in subsection (b) of this section shall be prohibited without prior issuance of a local development permit. If the area proposed for development appears to be located within a wetland protection district boundary, or within 50 feet of the wetland protection district boundary, as determined by the permitting officer from review of the generalized wetland map, a U.S. Army Corps of Engineers determination shall be required. If the Corps determines that wetlands are present on the proposed development site and that a section 404 permit or letter of permission is required, a local development permit will be issued only following receipt by the local permitting officer of a copy of the section 404 permit or letter of permission issued by the U.S. Army Corps of Engineers. (b) Permissible uses (uses as of right). The following uses shall be allowed as of right within a wetland to the extent they are not prohibited by any other ordinance or law, including laws of trespass, and provided they do not require structures, grading, fill, draining or dredging except as provided herein: (1) Conservation or preservation of soil, water, vegetation, fish and other wildlife, provided they do not affect waters of the state or of the United States in such a way that would require an individual 404 permit. (2) Outdoor passive recreational activities, including fishing, bird watching, hiking, boating, horseback riding and canoeing. (3) Forestry practices applied in accordance with best management practices approved by the Georgia Forestry Commission and as specified in section 404 of the Clean Water Act. (4) The continued cultivation of agricultural crops. Agricultural activities shall, however, be subject to best management practices approved by the state department of agriculture. Disturbances of wetlands for agricultural purposes are subject to the Swampbuster Act of the 1985 Farm Bill, and are to be reported to the USDA Farm Service Agency prior to commencement. (5) The pasturing of livestock, provided that riparian wetlands are protected, that soil profiles are not disturbed and that approved agricultural best management practices are followed. (6) Education, scientific research and nature trails. (c) Temporary emergency permit. A temporary emergency permit can be issued by the permitting officer for the following reasons: (1) Maintenance or repair of lawfully located roads or structures and of facilities used in the service of the public to provide transportation, electric, gas, water, telephone, telegraph, telecommunication or other services, provided that such roads, structures or facilities are not materially changed or enlarged, and written notice prior to the commencement of work has been given to the permitting officer, and provided that the work is conducted using best management practices to ensure that flow and circulation patterns and chemical and biological characteristics of the wetland are not impaired, and that any adverse effect on the aquatic environment will be minimized. (2) Temporary water level stabilization measures associated with ongoing silvicultural operations. (3) Limited ditching, tilling, dredging, excavating or filling done solely for the purpose of maintaining or repairing existing drainage systems necessary for the cultivation of agricultural crops, provided the maintenance or repair activity does not result in the impairment, alteration or loss of wetlands not previously subject to agricultural and silvicultural use under the terms and provisions of subsection (b)(4) of this section. (4) Limited excavating and filling necessary for the repair and maintenance of piers, walkways, nature trails, observation decks, wildlife management shelters, boathouses or other similar water-related structures, provided such facilities and structures are built on pilings to allow unobstructed flow of water and preserve the natural contour of the wetland. (d) Site plans. Applications for a local development permit within the generalized wetland protection district shall include a site plan, drawn to a scale of one inch equals 50 feet, unless a different scale is approved, in advance, by the permitting officer, with the following information: (1) A map of all planned excavation and fill, including calculations of the volume of cut and fill involved with cross sectional drawings showing existing and proposed grades. Elevations, horizontal scale and vertical scale must be shown on the cross sectional drawings. (2) A map of any wetland boundaries occurring within the site must be provided. This boundary may be included on other maps provided by the applicant. (3) Location, dimensions and area of all impervious surfaces, both existing and proposed, on the site and adjacent to the site for a distance of 200 feet. (4) The orientation and distance from the boundaries of the subject site to the nearest bank of an affected perennial stream or water body. (5) Elevation of the site and adjacent lands within 200 feet of the site at contour intervals of no greater than two feet; and no greater than one foot for slopes less than or equal to two percent. (6) Location and detailed design of any spill and leak collection systems designed for the purpose of containing hazardous or toxic materials released accidentally. (7) All proposed temporary disruptions or diversions of local hydrology. (e) Activities to comply with site plan. All development activities or site work conducted after approval of the site plan shall conform with the specifications of such site plan. The site plan may be amended only with approval of the permitting officer. The permitting officer may require additional information deemed necessary to verify compliance with the provisions of this article or to evaluate the proposed use in terms of the purposes of this article. (f) Subdivision approval in the wetland protection district. Any application for subdivision approval shall include a jurisdictional determination approved by the U.S. Army Corps of Engineers. If the U.S. Army Corps of Engineers determines that wetlands are present and that a section 404 permit or letter of permission is required, subdivision approval will be issued only following issuance of the section 404 permit or letter of permission. (g) Subdivision design options in the wetland protection district. Any subdivision that includes jurisdictional wetlands shall be allowed and encouraged to use the following options: (1) Lot size averaging. Lot size averaging is encouraged in single-family detached subdivisions as a means to work around wetland areas. The permitting officer may allow a reduction in lot size provided the same number of lots in the same subdivision are oversized by an equal or greater area. The maximum permissible reduction shall not exceed 25 percent of the minimum required lot area. The number of lots with areas reduced shall not exceed 25 percent of the total number of lots in the subdivision. The permitting officer shall allow no more than a 25 percent adjustment of rear, side and front setbacks for each affected lot. (2) Cluster development. Clustering of residential development is encouraged in singlefamily detached subdivisions as a way around wetland areas. When considering subdivision approval, the permitting officer may allow incorporation of wetland or other significant natural areas as open space in the subdivision plan. Such plans should designate at least 25 percent of the gross land area as open space. Density shall be calculated by subtracting from the total acreage of a parcel all land dedicated or in use for private or public roads, including all vehicular rights-of-way. The resultant acreage will then be divided by the minimum allowed lot size of the district to derive the number of lots permissible. (h) Filing fee. At the time of the application, the applicant shall pay a filing fee specified by the permitting officer. Filing fees of $150.00 shall be required to evaluate the application. However, if, after review of the initial application, it is determined that expert consultants are necessary to provide services pertaining to functional assessment, mitigation and wetland boundary determination, those fees will be in addition to the filing fee. The additional fee may be used to retain expert consultants who will provide services as deemed necessary by the permitting officer. (i) Enforcement authority. The permitting officer is the department, office or individual assigned the responsibility of administering this article. At the time the ordinance from which this article derives is adopted, the administrative authority is vested in the office of the county clerk. (j) Review procedures. The application shall be made to the permitting officer and will be reviewed within 14 days. The review period shall begin upon the permitting officer's written determination that the application is complete. The review period shall include the preparation of findings (approval, conditional approval or disapproval) by the permitting officer. The applicant will receive written notification of the findings of the permitting officer. If the review process is not completed and written findings not released within 30 days, the application is considered to be approved. (k) Appeals. Decisions on permit applications made by the permitting officer may be appealed to the board of commissioners. The appeal must be submitted in writing to the county clerk within ten days of the decision rendered by the permitting officer. A public hearing shall be held by the board of commissioners for appeals. Public announcement of the hearing shall be printed in a local newspaper of general circulation at least 15 days but not more than 45 days prior to the hearing. Any person may offer testimony at the hearing. The decision of the board of commissioners shall be issued within 15 days of the public hearing and may be appealed to the county superior court. (l) Duration of permit validity. (1) If construction described in the development permit has not commenced within six months from the date of issuance, the permit shall expire. (2) If construction described in the development permit is suspended or abandoned after work has commenced, the permit shall expire six months after the date work ceased. (3) Written notice of the pending expiration of the development permit may be issued by the permitting officer, but no such notification is required. ## History (Ord. of 11-13-2001, § 3)