Skip to content
Georgia Commons
Menu

Marion County · Code of Ordinances

Chapter 58 - TELECOMMUNICATIONS / Article II - TELECOMMUNICATIONS FACILITIES

Sec. 58-28. Dimensional standards.

About this text

  • As published by Municode, current through 2022-03-08
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) A fall zone around any tower constructed as part of a telecommunications facility must have a radius at least equal to the height of the tower and any attached antennas. The entire fall zone may not include public roads and must be located on property either owned or leased by the applicant or for which the applicant has obtained an easement, and may not, except as set forth in this section, contain any structure other than those associated with the telecommunications facility. If the facility is attached to an existing structure, relief may be granted by specific permission of the planning board on a case-by-case basis if it is determined by such board, after submission of competent evidence, that the waiver of this requirement will not endanger the life, health, welfare or property of any person. In granting any such waiver, the board may impose any conditions reasonably necessary to protect the public or other property from potential injury.

(b) All telecommunications facilities shall be located on a single parcel.

(c) All telecommunications facilities shall comply with the setback, frontage, minimum lot size, and yard standards of the underlying zoning district and the fall zone requirements of this article. To the extent there is a conflict, the more restrictive provision shall govern. The size of the leased or owned lot, together with any land over which the applicant has obtained an easement, shall be, at a minimum, sufficiently large to include the entire fall zone. All lots leased or owned for the purpose of construction of a tower as part of telecommunications facility shall conform, at a minimum, to the lot size requirements of the underlying zoning district or the size of lot necessary to encompass the entire fall zone (to the extent easements for any part of the fall zone that extends outside the minimum lot sized permitted in the zoning district have not been obtained), whichever requirement results in a larger lot.

(d) Notwithstanding provisions to the contrary of any other section of this article, the front, side, and rear yard requirements of the underlying zoning district in which a telecommunications facility is erected shall apply not only to a tower, but also to all tower parts including guy wires and anchors, and to any accessory buildings.

History

The history line the source prints at the end of the section.

(Ord. of 12-12-2006(02), § 6)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:marion-county/code/58-28@2022-03-08-c526e46ce9

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Marion County Code of Ordinances, Sec. 58-28. Dimensional standards | Georgia Commons