(a) Site plans for all telecommunications facilities must bear the seal of a professional engineer licensed to practice in the state. Every facility shall be built, operated and maintained to acceptable industry standards, including, but not limited to, the most recent, applicable standards of the Institute of Electric and Electronic Engineers (IEEE) and the American National Standards Institute (ANSI). (b) A safety analysis by a qualified professional must accompany any special permit or site plan application, renewal thereof or modification, for the purpose of certifying that general public electromagnetic radiation exposure does not exceed standards set by the FCC or any permit granted by FCC. Exceptions are transmitters for land mobile, cellular and amateur radio stations.