(a) General (1) Before issuing a permit, the director may examine or cause to be examined any building for which an application has been received for permit to enlarge, alter, repair, move, demolish or change the occupancy thereof. He shall inspect all buildings and structures, from time to time, during and upon completion of the work for which a permit was issued. He shall make a record of such examination and inspection and of all violations of this chapter. (2) When deemed necessary by the director, he shall make an inspection of materials or assemblies at the point of manufacture of fabrication. He shall make a record of every such examination and inspection and of all violations of this chapter. (3) The director may make, or cause to be made, the inspections required by this section. (b) Inspections required. (1) The director shall inspect or cause to be inspected at various intervals all construction or work for which a permit is required, and a final inspection shall be made of every building or structure upon completion. (2) Work requiring a building permit shall not be commenced until the permit holder or his agent shall have posted the building permit card in a conspicuous place on the front of the premises. (3) The inspector upon notification from the permit holder or his agent shall make the following inspections of buildings and such other inspection as may be necessary, and shall either approve that portion of the construction as completed or shall notify the permit holder or his agent when work fails to comply with the Code: a. Foundation—Footing and setbacks. b. Concrete slab—Plumbing. c. Rough-in—Electrical, plumbing, mechanical, energy. d. Framing. e. Fireplace. f. Final—electrical, energy. (4) Work shall not be done on any part of a building or structure beyond the point indicated in each successive inspection without first obtaining the written approval of the inspector.