Whenever possible the building sewer shall be brought to the building at an elevation below the lowest floor level including any basement floor. In all buildings in which any building drain is too low to permit gravity flow to the public sewer, sanitary sewage carried by such building drain shall be lifted by an approved means and discharged to the building's lateral line.