In addition to the general standards, the following minimum standards shall be met in order to be permitted as a high-impact activity. Due to the varying requirements of media production and nature of the industry, these standards are not intended to be all inclusive and additional conditions may be reasonably imposed, as warranted, to minimize anticipated adverse effects.
(1) The duration of a high-impact activity permit shall be based upon an agreed production schedule submitted by the applicant. Permits may be extended by the director of community development, for reasonable cause, provided a daily filming fee shall apply. A single application shall include all locations for the same production within the county. Application shall be made no less than two to five business days prior to the first scheduled event or day of filming. The permit shall be available, in location, at all times while activity is occurring and shown to county inspectors upon request.
(2) Normal hours of activity shall be 7:00 a.m. to 10:00 p.m. daily; all preparation and wrap-up shall occur within one hour of this timeframe. Noise shall be kept to a minimum; any activity occurring outside of the above hours involving planned noises in excess of dB at a distance of 100 feet from the point of origin shall be addressed in the application. If activity is planned within 500 feet of a residential area outside the hours specified, or will involve noises in excess of dB, notice shall be given by the best means available to residents as far in advance as reasonable.
(3) Street closures, obstruction or interference with normal traffic flow, including pedestrian use of sidewalks and public rights-of-way shall be detailed in the application, including any use of on-street parking spaces and/or parking in alleys or side streets.
(4) The county will not intervene on behalf of any permittee or negotiate access rights to private property with property owners; the permittee is expected to deal directly with private property owners for required permission and consent.
(5) Facilities and locations to be used for base camp, food service, and parking shall be approved as a condition of the permit; any other required permit shall be obtained prior to issuance of the permit under this chapter.
(6) Based upon the proposed scope of production activity and in consideration of any potential danger to the safety, health and welfare of the community, particularly private property and residents near the location, the sheriff or other county designee may require on-site security (qualified private security or use of off-duty law enforcement officers) and/or may require personnel and equipment be placed on standby for portions of the high-impact activity at the expense of the applicant. The application shall detail the planned time, place, and manner of any of the following production activities: pyrotechnics, demolition, discharge of firearms or other weapons, motor vehicle chases, physical stunts, and similar actions.