(a) Industrial pretreatment: (1) SIUs shall provide wastewater treatment as needed to comply with this article and shall achieve compliance with all national or state categorical pretreatment standards within the time limitations as specified in the categorical pretreatment regulations. A new source SIU shall install and shall start-up all pollution control equipment required to meet applicable pretreatment standards before beginning to discharge to the POTW. Such new sources shall meet all applicable pretreatment standards and requirements in the shortest time, not to exceed 90 days after the start of discharge to the POTW. An SIU shall provide, operate and maintain any facilities required to pretreat wastewater to meet applicable pretreatment standards. (2) Detailed plans showing the pretreatment facilities and operating procedures shall be submitted to the director before construction of the facility for review to determine accessibility and safety of sampling locations throughout the pretreatment facilities. The director's review of such plans and operating procedures will in no way relieve the SIU from the responsibility of modifying the facility as necessary to produce an effluent meeting the requirements of this article and categorical pretreatment standards. Any subsequent changes in the pretreatment facilities or method of operation shall be reported to the director prior to the SIU's initiation of the changes. (3) At all times SIUs shall properly maintain and operate all control facilities and systems installed or used by the SIU to achieve compliance with this article. Such facilities shall at all times be accessible to inspection by the director. (b) Industrial wastewater discharge permits: (1) General: a. All SIUs proposing to connect to or discharge to the POTW shall obtain an industrial wastewater discharge permit before connecting to or commencing to discharge to the POTW. b. All non-residential users shall complete and submit to the director an industrial user's wastewater questionnaire. Based on the information contained in the completed industrial user's wastewater questionnaire, the director may require a user to apply for and obtain an industrial wastewater discharge permit. (2) Permit application. All users who are required to obtain an industrial wastewater discharge permit shall complete, sign and submit to the director an application on the form provided by the director, accompanied by the appropriate fees as listed in the county water and sewer ordinance. a. Application information. In support of the permit application, each user may be required to submit, in units and terms appropriate for evaluation, the following information: 1. Name, address, and facility location; 2. Standard Industrial Classification (SIC) numbers according to the Standard Industrial Classification Manual, Bureau of the Budget, 1972, as amended; 3. Date of construction of any building, structure, facility or installation that is discharging or may discharge pollutants to the POTW; 4. Wastewater constituents and characteristics including, but not limited to, those mentioned in section 36-103(e), as determined by a reliable analytical laboratory using sampling and analysis techniques performed in accordance with the most current version of 40 C.F.R. § 136; 5. Time and duration of process flow discharge; 6. Average daily and estimated 30-minute peak wastewater flow rates, including daily, monthly and seasonal variations if any; 7. Site plans, floor plans, mechanical and plumbing plans, and details to show all sewers, sewer connections, and appurtenances by the size, location and elevation and a current water use schematic; 8. Make and model of all current or proposed flow monitoring devices used for the purposes of compliance or billing; 9. Detailed description of the production process and pretreatment process alone with a schematic of those systems with all components clearly identified; 10. Description of activities, facilities and plant processes on the premises, including all materials, which are or could be discharged; 11. Basis of design of the pretreatment facility, including, where applicable: (i) Design loading, including average, peak and future; (ii) Rationale for process selection; and (iii) Calculation of predicted effluent quality and loading under normal and peak operating conditions; 12. Where known, the nature and concentration of any pollutants in the discharge which are limited by any local, state or national pretreatment standards, including any listed or characteristic hazardous wastes as defined in federal regulations (40 C.F.R. § 261) and a statement regarding whether or not the pretreatment standards are being met on a consistent basis, and if not, whether additional operation and maintenance or additional pretreatment is required for the user to meet applicable pretreatment standards; 13. If additional pretreatment or operation and maintenance will be required to meet the pretreatment standards, the user shall provide the schedule by which they will meet the standards. The completion date in this schedule shall not be later than the compliance date established for the applicable pretreatment standard. In addition, the following conditions shall apply to this schedule: (i) The schedule shall contain phases of progress in the form of dates for the commencement and completion of major events leading to the construction and operation of additional pretreatment required for the user to meet the applicable pretreatment standards which includes, but is not limited to hiring an engineer, completing preliminary plans, completing final plans, executing contracts for major components, commencing construction, completing construction; (ii) No phase referred to in subsection (i) of this section shall exceed nine months; and no later than 14 calendar days following each date in the schedule and the final date for compliance, the user shall submit a progress report to the director, including, as a minimum, whether or not it complied with the increment of progress to be met on such date and, if not, the date on which it expects to comply with this increment of progress, the reason for delay, and the steps being taken by the user to return the construction to the schedule established. In no event shall more than nine months elapse between such progress reports to the director; 14. Number of employees, hours of operation of the user's plant and proposed or actual hours of operation of pretreatment system; 15. Proof that any required wastewater treatment system at the user's facility is operated under a certified operator in accordance with Georgia State Code, as amended from time to time; 16. Each product and by-product produced by type, amount, process or processes and rate of production; 17. Type and amount of raw materials processed including the average and maximum per day; 18. List of any environmental control permits held by or for the facility; and 19 Any requests for a monitoring waiver (or a renewal of an approved monitoring waiver) for a pollutant neither present nor expected to be present in the discharge based on subsection (c)(6) of this section (40 C.F.R. § 403.12(e)(2)). 20. Measurement of pollutants: (i) The categorical pretreatment standards applicable to each regulated process and any new categorically regulated processes for existing sources. (ii) The results of sampling and analysis identifying the nature and concentration or mass, where required by the standard or by the director, of regulated pollutants in the discharge from each regulated process. (iii) Instantaneous, daily maximum, and long-term average concentrations or mass, where required, shall be reported. (iv) The samples shall be representative of daily operations and shall be analyzed in accordance with procedures set out in this article. Where the standard requires compliance with a BMP or pollution prevention alternative, the user shall submit documentation as required by the director or the applicable standards to determine compliance with the standard. (v) Sampling must be performed in accordance with procedures set out in subsection (e) of this section. 21. Any other information as may be deemed by the director to be necessary to evaluate the permit application. b. Application submission time frames: 1. New sources required to obtain an industrial wastewater discharge permit shall submit an application to the director at least 180 calendar days prior to the date when the new source intends to commence discharging to the POTW. New sources may submit an application less than 180 calendar days prior to the date the new source intends to commence discharging to the POTW with prior approval from the director. 2. In the case of an initial issuance of an industrial wastewater discharge permit to an existing source or to an industrial user determined by the director to be subject to the permit requirements, an application shall be submitted to the director no later than 120 calendar days after the latter of the promulgation of an applicable national or state categorical pretreatment standard; or the date of notification by the director of a determination made according to this article. 3. An industrial user with an existing permit shall submit an application to the director at least 90 calendar days prior to a planned expansion or modification of production or treatment facilities or processes that are likely to cause a substantial change in the volume or character of pollutants discharged to the POTW by the industrial user. An application may be submitted in less than 90 calendar days with prior approval of the director. c. Signatories to permit applications. All permit applications shall be signed as follows: 1. For a corporation: by a responsible corporate officer. For purposes of this section, the term "a responsible corporate officer" means either of the following: (i) A president, secretary, treasurer, any vice-president of the corporation in charge of a principal business function, or any other person who performs similar policy-making or decision-making functions for the corporation; or (ii) The manager of one or more manufacturing, production, or operating facilities, provided the manager is authorized to make management decisions that govern the operation of the regulated facility including having the explicit or implicit duty of making major capital investment recommendations, and initiate and direct other comprehensive measures to assure long-term environmental compliance with environmental laws and regulations; can ensure that the necessary systems are established or actions taken to gather complete and accurate information for individual wastewater discharge permit requirements; and where authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures. 2. For a partnership or sole proprietorship: by a general partner or the proprietor, respectively. 3. Any person signing a document under subsection (b)(2)c.1 or c.2 of this section shall make the following certification: "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." (3) Permit modification, revocation and termination: a. The permittee shall be informed by the director of any proposed permit changes at least 30 calendar days prior to the effective date of any change. b. A permit may be modified, in whole or in part, revoked or terminated during its term for cause as specified in this subsection (b)(3) of this section. If the control authority determines that cause exists for modification or revocation of a permit, the control authority may require from the permittee an updated application or a pertinent portion of an application if such current information is needed to prepare the permit. c. Causes for modification, revocation or termination of a permit include, but are not limited to the following: 1. Violation of any term or condition of the permit; 2. Failure of the permittee to disclose fully all relevant facts or any misrepresentation of any relevant facts by the permittee in an application or during the permit issuance process; 3. A change in any condition that requires either a temporary or a permanent reduction or elimination of any discharge controlled by the permit, e.g., plant closure, a change in state law that requires the reduction or elimination of the discharge, or information indicating that the permitted discharge poses a substantial threat to human health or welfare; 4. Failure of the permittee to accurately report the wastewater constituents and characteristics of the permittee's discharge; 5. Failure of the permittee to report significant changes in operations or wastewater constituents and characteristics; 6. Refusal of reasonable access to the permittee's premises for the purpose of inspection or monitoring; or 7. Failure to implement all required plans including, but not limited to the following: (i) Toxic organic management plan; (ii) Mercury abatement plan; and (iii) Spill prevention plan. d. In addition to the provisions of subsections (3)b and c of this section, a permit may be modified for any of the following causes: 1. Material and substantial alterations or additions to the user's operation which were not covered in the effective permit, e.g., production changes, relocation or combi-nation of discharge points, changes in the nature or mix of products produced, provided that such alterations do not constitute total replacement of the process or production equipment causing the discharge which converts it into a new source as defined in this article. 2. Within nine months of the promulgation of a national or state categorical pretreatment standard, the industrial wastewater discharge permit of users subject to such standards shall be modified to require compliance with such standard within the time frame prescribed by such standard. In addition, the user with an existing industrial wastewater discharge permit shall submit an updated application to the director within 180 days after the promulgation of the applicable categorical pretreatment standard. e. A permittee shall: 1. Report to the director plans for or information about any activity that has occurred or will occur that would constitute cause for modification or revocation of a permit under subsection (b)(3) of this section; and 2. Comply with the existing permit until it is modified or reissued. (4) Permit conditions: a. Industrial wastewater discharge permits shall be subject to all provisions of this article, all other applicable regulations, and user charges and fees established in the county water and sewer ordinance. Rates for water and sewer shall contain the following: 1. A statement that indicates the industrial wastewater discharge permit issuance date, expiration date and effective date; 2. A statement that the industrial wastewater discharge permit is nontransferable without prior notification to the director in accordance with subsection (b)(7) of this section, and provisions for furnishing the new owner or operator with a copy of the existing industrial wastewater discharge permit; 3. Limits on the average and maximum wastewater constituents and characteristics; 4. Limits on average and maximum rate and time of discharge or requirements for flow regulations and equalization; 5. Effluent limits, including best management practices, based on applicable pretreatment standards; 6. Requirements for installation and maintenance of inspection and sampling facilities, and for providing entry for sampling and inspection; 7. Specifications for monitoring programs, which may include sampling locations, frequency of sampling, number and type of samples, and standards for tests and reporting, schedules; 8. Requirements for submission of technical reports or discharge reports; 9. Requirements for maintaining, retaining and allowing access to facility records relating to wastewater discharge; 10. Requirements for notification to the director of any new introduction or substantial change in the volume or character of the wastewater constituents or characteristics being introduced into the POTW; 11. Requirements for notification of spills, slug discharges or upsets in accordance with section 36-103(p)(2), or other violations of this article; 12. The process for seeking a waiver from monitoring for a pollutant neither present nor expected to be present in the discharge in accordance with subsection (c)(5) of this section; 13. A statement of applicable civil and criminal penalties for violation of pretreatment standards and requirements, and any applicable compliance schedule. Such schedule may not extend the time for compliance beyond that required by applicable federal, state, or local law; and 14. Any grant of the monitoring waiver by the director (subsection (c)(5) of this section) must be included as a condition in the user's permit or other control mechanism. b. Industrial wastewater discharge permits may contain the following compliance schedules: 1. Requirements to develop and implement spill and slug discharge control plans in accordance with section 36-100; 2. Requirements for installation, operation and maintenance of pollution control equipment; and 3. Other conditions as deemed appropriate by the director to ensure compliance with local ordinances and state and national pretreatment standards and requirements. (5) Permit duration. An industrial wastewater discharge permit shall be issued for any specified time period not exceeding five years. The user shall apply for permit renewal a minimum of 180 days prior to the expiration of the user's existing permit. (6) Continuation of expired permit. An expired industrial wastewater discharge permit will continue to be effective and enforceable until the permit is reissued if: a. The permittee has submitted a complete permit application at least 180 days prior to the expiration date of the user's existing permit; and b. The failure to reissue the permit, prior to expiration of the previous permit, is not due to any act or failure to act on the part of the permittee. (7) Permit transfer.Industrial wastewater discharge permits are issued to a specific user for a specific operation. A permit may be transferred to another person by a permittee, without modification or revocation, if the following events occur: a. Industrial wastewater discharge permits may be transferred to a new owner only if the permittee gives at least 30 days advance notice to the director and the director approves the industrial wastewater discharge permit transfer. The notice to the director must include a written certification by the new owner which: 1. States that the new owner has no immediate intent to change the facility's operations and processes; 2. Identifies the specific date on which the transfer is to occur; and 3. Acknowledges full responsibility for complying with the existing industrial wastewater discharge permit. Failure to provide advance notice of a transfer renders the industrial wastewater discharge permit void as of the date of facility transfer. b. Within 30 calendar days after receiving the transfer notification from the permittee the director shall notify the current permittee and the transferee of the need to modify, revoke or terminate the permit. The director may require that a new application be filed rather than agreeing to the transfer of the permit. (8) Permit comment period. The board shall provide for a 20-calendar day comment period prior to the issuance of an industrial wastewater discharge permit. A user may submit written comments to the board during this comment period setting forth all facts or reasons known to the user which may be relevant to a decision by the board on the permit requirements. (9) Records retention. Records shall be retained and preserved by the user for a minimum period of three years from the time of their creation. This includes documentation associated with best management practices established under section 36-100 along with any additional records or information obtained pursuant to monitoring activities undertaken by the user. All records that pertain to matters which are the subject of any enforcement action or litigation shall be retained and preserved by the user until all enforcement activities have concluded and all periods of limitations with respect to any and all appeals have expired. This period of retention shall also be extended when requested by the director, the control authority, or the approval authority. (c) Reporting requirements. In addition to the notification and reporting requirements specified in section 36-103(p), (q), (v), (w) and subsection (b) of this section, industrial users shall provide the following information and reports. All information and reporting requirements under this section shall be submitted in writing to the director. (1) Self-monitoring reports. All SIUs shall submit a" notices and self-monitoring reports that are deemed necessary by the director to assess and assure compliance by SIUs with applicable pretreatment standards and requirements. These reports shall be required according to the conditions specified in an SIU's industrial wastewater discharge permit and shall be certified and signed as required in subsection (b)(2)c.3 of this section. a. Re-sampling requirement.If sampling performed by the SIU indicates a violation, the SIU shall notify the director within 24 hours after becoming aware of the violation. The SIU shall repeat the sampling and analysis and submit the results of the repeat analysis to the director within 30 calendar days after notification unless a shorter time is specified by the director. b. Additional self-monitoring. If an SIU monitors any pollutant more frequently than required by the director, using procedures established by 40 C.F.R. § 136, the SIU shall include the results of this monitoring in the report. (2) Baseline monitoring report. Upon promulgation of a new or revised national categorical pretreatment standard, all affected industrial users shall submit the following reports to the director on forms provided by the director: a. Within 180 calendar days after the effective date of a categorical pretreatment standard, existing sources subject to such categorical pretreatment standards who are currently discharging to or scheduled to discharge to the POTW shall be required to submit a report containing the information listed in subsection (c)(2) of this section of discharge to the POTW, new sources and sources that become industrial users subsequent to the promulgation of an applicable categorical pretreatment standard shall be required to submit a report which contains the information listed in subsections (c)(1) through (c)(5) of this section. New sources shall also be required to include in this report information on the method of pretreatment the industrial user intends to use to meet applicable pretreatment standards. New sources shall give estimates of the information requested in subsections (c)(4) and (c)(5) of this section; b. The baseline monitoring report shall contain the following information: 1. Identifying information. The industrial user shall submit the name and address of the facility including the name of the owner and operator; 2. Applicable permits. The industrial user shall submit a list of any other environmental control permits held by the owner or operator of the facility; 3. Description of operations. The industrial user shall submit a brief description of the nature, average rate of production, and standard industrial classification of the operations performed by such industrial user. This description should include a schematic process diagram, which indicates points of discharge to the POTW from the regulated processes; 4. Flow measurement. The industrial user shall submit information showing the measured average and maximum daily flow, in gallons per day, to the POTW from each regulated process stream; 5. Measurement of pollutants: (i) The industrial user shall identify the pretreatment standards applicable to each regulated process; (ii) In addition, the industrial user shall submit the results of required sampling and analysis identifying the nature and concentration or mass of regulated pollutants in the discharge from each regulated process. Where required, both the daily maximum and the average concentration or mass shall be reported. The sample shall be representative of daily operations; (iii) A minimum of four grab sampling events shall occur. All samples shall be properly collected and analyzed for pH, cyanide, phenol, FOG, and volatile organics; (iv) For all other pollutants at facilities in which historical sampling data do not exist, a minimum of four 24-hour composite samples shall be obtained through flow proportional composite sampling techniques. The director may waive flow-proportional composite sampling for any industrial user that demonstrates that flow-proportional sampling is not feasible. In such cases, samples may be obtained through time proportional composite sampling techniques or through a minimum of four grab samples over a period greater than one hour, where the industrial user demonstrates that this will provide a representative sample of the effluent being discharged. At facilities for which historical sampling data are available, the director may authorize a lower minimum; (v) The industrial user shall take a minimum of one representative sample to compile data necessary to comply with the requirements of subsection (c)(5) of this section; (vi) Samples shall be taken immediately downstream from a pretreatment facility if such a facility exists or immediately downstream from the regulated process if no pretreatment facility exists; (vii) Sampling and analysis shall be performed in accordance with the techniques prescribed in 40 C.F.R. § 136, as amended. Where 40 C.F.R. § 136, does not contain sampling or analytical techniques for the pollutant in question, or where the director determines that the sampling and analytical techniques described in 40 C.F.R. § 136, are inappropriate for the pollutant in question, then sampling and analysis shall be performed by using validated analytical methods or any other applicable sampling and analytical procedures, approved by the director; (viii) The director may allow the submission of a baseline report which utilizes only historical data so long as the data provides information sufficient to determine the need for industrial pretreatment measures; and (ix) The baseline monitoring report shall indicate the time, date and place of sampling, and methods of analysis, and shall certify that such sampling and analysis is representative of normal work cycles and expected pollutant discharges to the POTW; 6. Certification statement. The industrial user shall submit a statement certified by a qualified professional, indicating whether pretreatment standards are being met on a consistent basis. If pretreatment standards are not being met, then the certification statement shall specify whether additional O&M or additional pretreatment is required for the industrial user to meet the pretreatment standards and requirements; 7. Compliance schedule. If additional pretreatment or O&M are required to meet the pretreatment standards, the industrial user shall provide a compliance schedule by which the industrial user will provide such additional pretreatment or O&M. The completion date in this schedule shall not be later than the compliance date established for the applicable pretreatment standard. The conditions contained in section 36-103(r) shall apply to the schedule required by this section; and 8. Other. Industrial users shall submit any other information required as listed in 40 C.F.R. § 403.12(b)(1)—(7). (3) Ninety-day compliance report. Within 90 calendar days following the date for final compliance with applicable categorical pretreatment standards or in the case of a new source, following commencement of the introduction of wastewater into the POTW, any industrial user subject to such pretreatment standards and pretreatment requirements shall submit to the director a report containing the information described in subsection (c)(2) of this section. For industrial users subject to equivalent mass or concentration limits established in accordance with the procedures in 40 C.F.R. § 403.6(c), this report shall contain a reasonable measure of the industrial user's long-term production rate. For all other industrial users subject to categorical pretreatment standards expressed in terms of allowable pollutant discharge per unit of production or other measure of operation, this report shall include the industrial user's actual quantity of product produced during the appropriate sampling period. (4) Periodic compliance reports. Except as specified in subsection (c)(5) of this section, all significant industrial users must, at a frequency determined by the director, submit no less than twice per year reports indicating the nature, concentration of pollutants in the discharge which are limited by pretreatment standards and the measured or estimated average and maximum daily flows for the reporting period. In cases where the pretreatment standard requires compliance with a best management practice (BMP) or pollution prevention alternative, the user must submit documentation required by the director or the pretreatment standard necessary to determine the compliance status of the SIU. (5) Sampling waiver. Pursuant to 40 C.F.R. § 403.12 and this article, the director may authorize an industrial user subject to a categorical pretreatment standard to forego sampling of a pollutant regulated by a categorical pretreatment standard if the industrial user has demonstrated through sampling and other technical factors that the pollutant is neither present nor expected to be present in the discharge, or is present only at background levels from intake water and without any increase in the pollutant due to activities of the industrial user. This authorization is subject to the following conditions: a. The waiver may be authorized where a pollutant is determined to be present solely due to sanitary wastewater discharged from the facility provided that the sanitary wastewater is not regulated by an applicable categorical standard and otherwise includes no process wastewater; b. The monitoring waiver is valid only for the duration of the effective period of the individual wastewater discharge permit, but in no case longer than five years. The user must submit a new request for the waiver before the waiver can be granted for each subsequent individual wastewater discharge permit. See subsection (b)(2)a.19 of this section; c. In making a demonstration that a pollutant is not present, the industrial user must provide data from at least one sampling of the facility's process wastewater prior to any treatment present at the facility that is representative of all wastewater from all processes; d. Pursuant to 40 C.F.R. § 403.6, the request for a monitoring waiver must be signed in accordance with subsection (c)(8) of this section, and include the certification statement in subsection (c)(3) of this section; e. Non-detectable sample results may be used only as a demonstration that a pollutant is not present if the EPA approved method from 40 C.F.R. § 136 with the lowest minimum detection level for that pollutant was used in the analysis; f. Any grant of the monitoring waiver by the director must be included as a condition in the SIU's permit. The reasons supporting the waiver and any information submitted by the user in its request for the waiver must be maintained by the director for three years after expiration of the waiver; g. Upon approval of the monitoring waiver and revision of the user's permit by the director, the industrial user must certify on each report with the statement in subsection (c)(7) of this section, that there has been no increase in the pollutant in its waste stream due to activities; h. In the event that a waived pollutant is found to be present or is expected to be present because of changes that occur in the user's operations, the user must immediately comply with the monitoring requirements of subsection (c)(4) of this section, or other more frequent monitoring requirements, and notify the director; and i. This provision does not supersede certification processes and requirements established in categorical pretreatment standards, except as otherwise specified in the categorical pretreatment standard. (6) Certification of pollutants not present. Users that have an approved monitoring waiver based on subsection (c)(5) of this section must certify on each report with the following statement that there has been no increase in the pollutant in its waste stream due to activities of the user. "Based on my inquiry of the person or persons directly responsible for managing compliance with the Pretreatment Standard for 40 C.F.R. [specify applicable National Pretreatment Standard part(s)], I certify that, to the best of my knowledge and belief, there has been no increase in the level of [list pollutant(s)] in the wastewaters due to the activities at the facility since filing of the last periodic report under subsection (c)(4) of this section." (7) Reports from unpermitted users. All users not required to obtain an individual wastewater discharge permit shall provide appropriate reports to the director as the director may require. (8) Signatory requirements and report certification: a. All reports required by this article and other information requested by the director shall be submitted with the certification statement in subsection (b)(2)c.3 of this section and properly signed by a person described in subsection (b)(2)c.1 or c.2 of this section, or by a duly authorized representative. b. The signatory may designate a duly authorized representative provided: 1. The authorization is made in writing by the person described in subsection (b)(2)c.1 or c.2 of this section; 2. The authorization specifies either the individual or a position having responsibility for the overall operation of the facility from which the industrial discharge originates, such as the position of plant manager, operator of a well, or well field superintendent, or a position of equivalent responsibility, or having overall responsibility for environmental matters for the company; and 3. The written authorization is submitted to the director. The director shall be notified in writing prior to or together with any reports or information to be signed by a new signatory or authorized representative, if the signatory under subsection (c)(4) of this section or authorization under subsection (c)(4) of this section is no longer accurate. (d) Monitoring facilities: (1) Measurement of SIU industrial waste flow. Any significant industrial user who is discharging industrial waste to the POTW shall provide to the director independent access and the means and facilities for observing, measuring and sampling such industrial waste. The director shall have full access at all times to the SIU's monitoring facility or facilities to conduct tests on quality and quantity of effluent. The volume or quantity of industrial waste discharged by any industrial user into the POTW may be determined by one or more of the following methods: a. If the entire volume of water used by an SIU is purchased from the county, then the volume of water purchased from the county shall be considered to be the volume of industrial waste discharged; b. If the entire volume of water used by an SIU is purchased from the county and the volume of water used for industrial purposes is less than the volume of water purchased from the county, the SIU shall either install and maintain a meter on the industrial waste line; or use another method approved by the director to determine the volume of industrial waste discharged; or c. If any SIU now discharging or proposing to discharge industrial waste to the POTW and does not purchase its entire water supply from the county, then the volume or quantity of industrial wastes discharged by an SIU shall be determined as follows: 1. The SIU shall install and maintain a meter or meters on all private water supply lines. The volume of industrial waste discharged shall be considered the sum of the volume of water purchased from the county and the volume of water metered from the private water supply; or 2. The SIU shall install and maintain a meter on the industrial waste line to determine the volume of industrial waste discharged. (2) Measurement of other non-residential flow. If any other non-residential user now discharging or proposing to discharge to the POTW and does not purchase its entire water supply from the county, then the volume or quantity of wastewater discharged by the non-residential user may be determined by one of the methods listed in subsection (d)(1) of this section. (3) Location of monitoring facilities. The director may require an industrial user to provide and operate, at its own expense, monitoring facilities to allow inspection, sampling and flow measurement of the user's industrial waste. The monitoring facility shall be located on the industrial user's premises unless the director determines that such a location would be impractical for purposes of providing independent and unscheduled monitoring activities or causes undue hardship on the industrial user. In such cases, with the director's approval, the monitoring facility may be constructed in the public right-of-way or easement, in an unobstructed location. The location of the monitoring facility shall provide ample room in or near the monitoring facility to allow accurate sampling and preparation of samples for analysis. The industrial user shall maintain its monitoring facilities and sampling and measuring equipment in safe and proper operating condition. Whether constructed on public or private property, the monitoring facilities shall be provided in accordance with the director's requirements and all applicable local construction standards and specifications. Such facilities shall be constructed and maintained in a manner to enable the director to perform independent monitoring activities. (e) Inspection and sampling: (1) Inspection: a. The director may inspect the facilities of any user to ascertain whether the user is complying with the provisions and requirements of this article. The director shall perform a minimum of one scheduled and one unscheduled inspection each calendar year at each SIU. b. Upon request by the director, users shall allow the director and the approval authority access to all parts of the premises within a reasonable time frame as determined by the director for the purpose of ensuring compliance with this article. The director and the approval authority shall have the right to enter onto a user's property to set up such devices as are necessary to sample, inspect, monitor or meter operations of the user to determine compliance with this article. Where a user has security measures in force which would require proper identification and clearance before entry onto its property, the user shall make necessary arrangements so that upon presentation of suitable identification, the director and the approval authority shall be permitted to enter, without delay, for the purposes of performing their specific responsibilities. c. Unreasonable delays in allowing the director and the approval authority access to the user's premises shall be a violation of this article. (2) Search warrants. The director may obtain an administrative search warrant from a court of competent jurisdiction when the director has been refused access to a building, structure, property, or any part thereof. The director must be able to demonstrate that a user is violating any provision of this article or as part of a routine inspection and sampling program, needs to inspect or sample to verify compliance with this article or to protect the overall public health, safety and welfare of the community. (3) Sample analyses: a. All analyses, including sampling results submitted in support of any application, reports, evidence, or required by any permit or order, shall be performed in accordance with the techniques prescribed in 40 C.F.R. § 136, as amended. If 40 C.F.R. § 136 does not contain sampling or analytical techniques for the pollutant in question, sampling and analyses shall be performed using validated analytical methods or any other sampling and analytical procedures approved by the director. b. All wastewater samples must be representative of the user's discharge. Wastewater monitoring and flow measurement facilities shall be calibrated, properly operated, kept clean, and maintained in good working order at all times. The failure of a user to keep its monitoring facility in good working order shall not be grounds for the user to claim that sample results are unrepresentative of its discharge.