(a) Pre-development review. It is recommended that developers considering subdivision or mobile home park development, where public or community sewage treatment systems will not be available, seek a predevelopment review by the county board of health prior to developmental improvements. A predevelopment report which indicates disapproval or tentative approval may be obtained by submitting a boundary plat including: (1) A vicinity map; (2) A topographic map; (3) A preliminary soil study conducted in compliance with the department's current Manual for On-Site Sewage Management Systems. (b) Proposals and plans required. The following information is required for subdivision and mobile home park proposals: (1) A boundary plat drawn to a reasonable scale which includes: a. A vicinity map; b. Proposed lots and streets including lot identification, dimensions, building lines and square footage of lots; c. A topographic map depicted in two-foot contour intervals. Additional contour intervals may be required by the county board of health; d. A soil map and soil descriptions based on a high intensity soil study conducted in compliance with the department's current Manual for On-Site Sewage Management Systems; e. The location of all present and proposed wells, water systems, water courses, floodplains, sewage systems, structures, rights-of-way, utilities, stormwater drainage systems and easements on the property and within 100 feet outside the perimeter of the property; and f. The name, registration number and seal of the professional surveyor or engineer that prepared the development plan. (2) A completed subdivision analysis record on forms provided by the department. (3) A copy of the following documents issued by the environmental protection division of the department of natural resources: a. The land disturbance activity permit issued by either the environmental protection division or the local issuing authority. For the purposes of this section, the term "issuing authority" means the governing authority of any county or municipality, which is certified pursuant to O.C.G.A. ยง 12-7-8(a) by the director of the environmental protection division; b. A letter of approval to begin construction of a public water supply system and approving the source of the water supply where a public water supply system is to be utilized. (c) Water supply. Connection to a public water supply system shall be required if available within 1,000 feet of the proposed subdivision or mobile home park. (d) Limits on use of on-site sewage management systems for subdivision and mobile home parks. Approval of subdivisions and mobile home parks utilizing on-site sewage management systems shall not be granted: (1) When a public or community sewage system is available within 500 feet off the subdivision or mobile home park. (2) When soil maps, descriptions, and reports compiled by a registered soil classifier indicate that soil conditions prohibit safe development of on-site sewage management systems. (3) Prior to receipt of a letter from the environmental protection division approving the plans to construct the public water supply system and approving the source of the water supply where a public water supply system is to be utilized. (e) Construction permits. Construction permits for on-site sewage management systems shall be issued in accordance with section 36-21(b)(1) of the rules for on-site sewage management systems.