--- title: Meriwether County Code of Ordinances, Sec. 6-5. Permits; when required; fees; exceptions collection: local-codes id: local-code:meriwether-county/code/6-5 cite_as: Meriwether County, Ga., Code of Ordinances § 6-5 canonical_url: https://georgiacommons.org/counties/meriwether/code/6-5 md_url: https://georgiacommons.org/counties/meriwether/code/6-5.md text_url: https://georgiacommons.org/counties/meriwether/code/6-5/text source_url: https://library.municode.com/ga/meriwether_county/codes/code_of_ordinances date: 2026-01-12 status: active jurisdiction: county:meriwether jurisdiction_name: Meriwether County county_fips: "13199" corpus_version: local-codes-meriwether-county-50e832dc19f4 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/meriwether/code/~part-ii/~chapter-6/~article-i.md previous: https://georgiacommons.org/counties/meriwether/code/6-4.md next: https://georgiacommons.org/counties/meriwether/code/6-6.md index: https://georgiacommons.org/counties/meriwether.md branch: code edition: As published by Municode, current through 2026-01-12 edition_date_kind: current_through source_publisher: Municode version_id: local-code:meriwether-county/code/6-5@2026-01-12-b50a6701ab --- # Meriwether County Code of Ordinances, Sec. 6-5. Permits; when required; fees; exceptions > As published by Municode, current through 2026-01-12 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 6 - BUILDINGS AND BUILDING REGULATIONS / Article I - IN GENERAL (a) Any owner, authorized agent, or contractor who desires to construct enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure, or to erect, install, enlarge, alter, repair, remove, convert or replace any electrical, gas, mechanical or plumbing system, the installation of which is regulated by the technical codes referenced in section 6-1, or to cause any such work to be done, shall first make application to the director for community development and obtain the required permit for the work. (b) It shall also be a requirement for a person to obtain a building permit that such person first obtain a permit for sanitation from the county health department. (c) The building permit fee for all structures constructed or located within the county shall be in an amount determined by action of the board of commissioners from time to time and set out in the consolidated fee schedule. The building fees, and all associated costs and fees, are also available in the office of the director for community development and available for inspection during normal work hours. (d) For purposes of computing the building permit fee amount, the total area of all levels of the structure shall be used to determine the total area in square feet, excepting only that unfinished attics and crawl spaces shall not be included. (e) Accessory structures such as a pole shed, carport or other structures having less than 200 square feet with no electrical wiring or plumbing and having no enclosed storage area shall be charged only a minimum fee in an amount determined from time to time by the board of commissioners and listed in the consolidated fee schedule. (f) The required permits shall be available to the public by payment of the necessary fee in the office of the director for community development. (g) Recreational vehicle, as defined in appendix A, section 3.1, can be utilized as temporary residence by the owner or their designee on a building site with an active building permit for the construction of a permanent residence to be occupied by the owner and his immediate family upon completion and only in those zoning districts where it is specifically authorized (see appendix a, section 7.3, permitted uses). Application for temporary residence of a recreational vehicle must be made to the director of community development and approved prior to setup and expires 12 months after approval, or upon receipt of a certificate of occupancy (CO) or whichever is earlier. ## History (Code 1991, § 5-5; Res. of 10-14-1987; Ord. No. 2023-04, 10-24-2023; Ord. No. 2023-09, 11-28-2023)