Skip to content
Georgia Commons
Menu

Mitchell County · Code of Ordinances

Part II - CODE OF ORDINANCES / Chapter 18 - BUILDINGS AND BUILDING REGULATIONS / Article II - CONSTRUCTION CODES / Division 1 - GENERALLY

Sec. 18-29. Permitting and inspection.

About this text

  • As published by Municode, current through 2023-08-08
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

The inspection or permitting of any building, system or plan, under the requirements of this article shall not be construed in any court as a warranty of the physical condition of such building, system, or plan or their adequacy. The county or any employee thereof shall not be liable in tort for damages for any defect or hazardous or illegal condition or inadequacy in such building, system, or plan, nor for any failure to any component of such, which may occur subsequent to such inspection or permitting.

History

The history line the source prints at the end of the section.

(Ord. No. 2002-007, exh. A(2.2.1), 10-8-2002)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:mitchell-county/code/18-29@2023-08-08-c20a875694

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.