Skip to content
Georgia Commons
Menu

Mitchell County · Code of Ordinances

Part II - CODE OF ORDINANCES / Chapter 18 - BUILDINGS AND BUILDING REGULATIONS / Article II - CONSTRUCTION CODES / Division 3 - PERMITS

Sec. 18-94. Conditions of the permit.

About this text

  • As published by Municode, current through 2023-08-08
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) Permit intent. A permit issued shall be construed to be a license to proceed with the work and not as authority to violate, cancel, alter, or set aside any of the provisions of the technical codes, and issuance of a permit shall not prevent the building official from thereafter requiring a correction of errors in plans, construction, or violations of this article. Every permit issued shall become invalid unless the work authorized by such permit is commenced within six months after its issuance or if the work authorized by such permit is suspended or abandoned for a period of six months after the time the worked is commenced. One or more extensions of time, for periods not more than six months each, may be allowed for the permit. The extension shall be requested in writing and justifiable cause demonstrated. Extensions shall be in writing by the building official.

(b) Permit issued on basis of an affidavit. Whenever a permit is issued in reliance upon an affidavit or whenever the work to be covered by a permit involves installation under conditions, which, in the opinion of the building official, are hazardous or complex, the building official shall require that computations shall supervise such work. In addition, they shall be responsible for conformity with the permit, provide copies of inspection reports as inspections are performed, and upon completion make and file with the building official written affidavit that the work has been done in conformity with the reviewed plans and with the structural provisions of the technical codes. In the event such architect or engineer is not available, the owner shall employ in his stead a competent person or agency whose qualifications are reviewed by the building official.

(c) Plans. When the building official issues a permit, he shall enforce, in writing or by stamp, both sets of plans "Reviewed for Code Compliance." The building official shall retain one set of drawings so reviewed, and the other set shall be returned to the applicant. The permitted drawings shall be kept at the site of work and shall be open to inspection by the building official or his authorized representative.

History

The history line the source prints at the end of the section.

(Ord. No. 2002-007, exh. A(4.6), 10-8-2002)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:mitchell-county/code/18-94@2023-08-08-bfe4e64cbe

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Mitchell County Code of Ordinances, Sec. 18-94. Conditions of the permit | Georgia Commons