(a) Existing building inspections. Before issuing a permit, the building official may examine, or cause to be examined, any building, electrical, gas, mechanical, or plumbing system for which an application has been received for a permit to enlarge, alter, repair, move, demolish, install, or change the occupancy. He shall inspect all buildings, structures, electrical, gas, mechanical, and plumbing systems, from time to time, during and upon completion of the work for which a permit was issued. He shall make a record of every such examination and inspection and of all violations of the technical codes. (b) Manufacturers and fabricators. When deemed necessary by the building official he shall make, or cause to be made, an inspection of materials or assemblies at the point of manufacture or fabrication. A record shall be made of every such examination and inspection and of all violations of the technical codes. (c) Inspection service.The building official may make, or cause to be made, the inspections required by subsection (f) of this section. He may accept reports of inspectors of recognized inspection services provided that after investigation he is satisfied as to their qualifications and reliability. A certificate called for by any provision of the technical codes shall not be based on such reports unless the same are in writing and certified by a responsible officer of such service. (d) Inspections prior to issuance of certificate of occupancy or completion. The building official shall inspect, or cause to be inspected, at various intervals all construction or work for which a permit is required, and a final inspection shall be made of every building, structure, electrical, gas, mechanical, or plumbing system upon completion, prior to the issuance of the certificate of occupancy or completion. (e) Posting of permit. Work requiring a permit shall not commence until the permit holder or his agent posts the permit card in a conspicuous place on the premises. The permit shall be protected from the weather and located in such position as to permit the building official or representative to conveniently make the required entries thereon. This permit card shall be maintained in such position by the permit holder until the certificate of occupancy or completion is issued by the building official. (f) Required inspections. The building official, upon notification from the permit holder or his agent, shall make the following inspections and such other inspections as necessary and shall either release that portion of the construction or shall notify the permit holder or his agent of any violations which must be corrected in order to comply with the technical code: (1) Foundation inspection. A foundation inspection, to be made after trenches or ditches are excavated, and forms erected, conduit or cable installed, and before any backfill is put in place. (2) Rough-in inspection. A rough-in inspection, to be made after the roof, all framing, fire blocking, and bracing are in place and all concealing wiring, all pipes, chimneys, ducts, and vents are complete. (3) Final inspection. A final inspection, to be made after the building is completed and ready for occupancy. (g) Reinforcing steel, structural frames, insulation, plumbing, mechanical, or electrical systems. Reinforcing steel, structural frame, insulation, plumbing, mechanical, or electrical systems work on any part of any building or structure shall not be covered or concealed without first obtaining a release from the building official. (h) Plaster fire protection.In all buildings where plaster is used for fire protection purposes, the permit holder or his agent shall notify the building official after all lathing and backing is in place. Plaster shall not be applied until the release from the building official has been received. (i) Written release. Work shall not be done on any part of a building, structure, electrical, gas, mechanical, or plumbing system beyond the point indicated in each successive inspection without first obtaining a written release from the building official. Such written release shall be given only after an inspection has been made of each successive step in the construction or installation as indicated by each of the foregoing three inspections.