(a) An adequate drainage system including necessary ditches, curbs, gutters, pipes, culverts, street drains, drip inlets, bridges, and other improvements shall be provided for the conducting of all surface water through the subdivision. (b) All major subdivision must be accompanied by hydrologic plan for stormwater retention or detention. The plans must be prepared by a professional engineer, currently registered to practice in the state, with his stamp affixed. The design storm for the county shall be the 25-year frequency. (c) Drains and cross drains shall be provided to accommodate all natural watercourses, as well as water flowing from the site and shall extend beyond the roadway shoulders sufficiently to protect the embankment slopes. (d) Pipe sizes and slopes shall be determined by acceptable engineering calculations and shall provide for not less than a ten-year return frequency storm. In no case shall cross drains be less than 18 inches in diameter and side drains less than 15 inches in diameter. (e) Natural drainage channels existing within a subdivision shall be retained and improved by the subdivider. (f) Holding ponds when required shall be fenced (chain link) with a minimum height of five feet. Fencing shall be approved by the county code enforcement official.