Skip to content
Georgia Commons
Menu

Mitchell County · Code of Ordinances

Part II - CODE OF ORDINANCES / Chapter 62 - SUBDIVISIONS / Article II - PROCEDURES AND STANDARDS

Sec. 62-45. Conformance to standards for streets and utilities.

About this text

  • As published by Municode, current through 2023-08-08
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

All roads, streets, and/or alleys that are to be used by the general public shall be constructed in accordance with the standards fixed by these regulations. No road shall be accepted for county maintenance unless the provisions of these regulations have been met. Official approval of a developer's plan constitutes no implied responsibility on the county for any assistance in construction, either in materials or labor or equipment, this being the responsibility of the developer. Specifically, the developer will remove or have removed at his own cost, all utility lines and poles, install required drainage facilities, install all culverts for access to abutting property, construct the roadway and improve the entire right-of-way.

History

The history line the source prints at the end of the section.

(Code 2004, § 66-43; Ord. of 9-12-2000, § 300.2)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:mitchell-county/code/62-45@2023-08-08-593ff04edc

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.