Sec. 62-54. Bonds and requirements.

About this text

  • As published by Municode, current through 2023-08-08
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

To ensure the construction and installation of public facilities and improvements (i.e., streets, storm sewers, and water mains), the developer shall, prior to the start of any construction activity, post a bond or certified check with the county. Said bond or certified check shall provide for and secure to the county a guarantee that the actual construction and installation requirements of the county have been met, or will be met, and that a two-year maintenance and performance period shall be met. The bond shall be with a surety company licensed to do business in the state and acceptable to the county. It shall contain a provision indemnifying the county for the maintenance of installations and improvements required by these regulations in the subdivision for two years following the completion of construction of all streets, drainage structures and any other required improvements. The county administrator shall approve the reduction of the bond or certified check to 20 percent of the original bond to cover the cost of any failures in the improvements and drainage system of the subdivision for one year after the completion of all improvements and drainage systems in the subdivision. The bond shall be released after an inspection by the public works director and the county administrator indicates that all paving, drainage and other improvements are in accordance with applicable county ordinances and regulations and that all improvements are in proper working condition at the end of the two-year bonding period.

History

The history line the source prints at the end of the section.

(Code 2004, § 66-52; Ord. of 9-12-2000, § 300.11)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:mitchell-county/code/62-54@2023-08-08-60d544ca54

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Mitchell County Code of Ordinances, Sec. 62-54. Bonds and requirements | Georgia Commons