The final plat shall substantially conform with the approved preliminary plat. If desired by the subdivider, the final plat may constitute only that portion (phasing) of the preliminary plat he proposes to record and develop at that time. However, no construction shall begin on any individual lot until after approval of the final plat by the county board of commissioners. (1) Final subdivision with no land disturbing permit. If the new subdivision has no new roads, drainage improvements or land disturbing activities, the final plat, as completed by the registered land surveyor, may be submitted to the building department, according to county regulations. One original on linen or mylar and seven copies must be submitted two weeks prior to the regular meeting of the planning commission on the third Thursday of the month. (2) Final plat with land disturbing permit. a. If the new subdivision has new roads or drainage improvements or substantial land disturbing activity, the final plat must be submitted reflecting the subdivision with the new roads or improvements as they are built. These improvements must be accepted by the public works director prior to the final approval of the plat by the planning commission. When the roads are approved and the plat approved, the developer must then put up the specified road bond or other form of acceptable security. The developer also remains responsible for the maintenance and repairs on the road for a period of two years from the time the final plat is approved. b. After the two years the public works director will re-inspect the road. If the road is accepted as is, the bond or other form of acceptable security will be released. If the road is not accepted, the developer will be responsible for making the required repairs, etc., or the bond will be forfeited. Prior to final plat approval, the appropriate road sign fees shall be paid to the building department by the developer. (3) Approved final plat. Once a final plat is approved by the planning commission, the plat is submitted to the county commissioners for approval. (4) Denial of final plat. If the final plat is denied the developer will be notified of any modifications or problems that need to be addressed. a. Filing. Following approval of the preliminary plat and the completion of all required improvements, the developer shall file with the building official an application for final plat approval. To have the final plat placed on the planning commission monthly agenda, a completed application must be made at least seven working days prior to the planning commission's monthly meeting or the request will be placed on the following months agenda. Additionally, the application must be accompanied by a completed final plat checklist documenting that all final plat requirements have been met. b. Application requirements. The application shall contain: 1. A letter of application containing the name and address of a person to whom notice may be sent. 2. A complete list of deviations, if any, from that which appeared on the approved preliminary plat. 3. A certified copy of all private covenants or deed restrictions, if any, pertaining to land within the subdivision. 4. A copy of the agreement between the subdivider and any other political jurisdiction, if any, regarding the arrangements for providing the necessary water and sewer facilities. 5. Evidence of the posting of a surety bond, to insure the construction and installation of required public facilities and improvements. 6. The original reproducible on plastic or linen and seven prints of the final plat. 7. Design and calculations for the stormwater drainage system, including elevations and capacities of pipes and holding basins. 8. A plan showing the location of all water, sewer, gas, and electrical system improvements, including locations of service connections. 9. If the proposed water/sewerage system for a subdivision requires the approval of the state department of human resources and/or the state department of natural resources, the approval shall be obtained prior to making application for approval of the final plat. The approval shall be in writing to the planning commission. 10. All as-built plans indicating permanent soil erosion and sedimentation control measures, storm drainage facilities, and public utilities. A copy of this plan shall be provided to the office of the board of county commissioners. c. Approval by the planning commission. Approval or disapproval of the final plat by the planning commission shall be accomplished within 30 days after the date of the scheduled regular planning commission meeting following submission of the application. If, after the 30 days, the planning commission has failed to act, the final plat shall be deemed approved and, on demand, a copy shall be signed for transmission to the county board of commissioners, provided that the subdivider may waive in writing the requirement and consent to an extension of such period. If the planning commission disapproves the final plat, the reasons shall be stated in the resolution and the subdivider shall be so advised. d. Approval by the board of county commissioners. If the planning commission shall approve the final plat, the final plat shall be submitted to the county board of commissioners for review. The county board of commissioners shall act upon the final plat within 30 days after receipt of the final plat. If, the county board of commissioners shall disapprove the final plat, the reasons shall be stated in the resolution and the subdivider shall be so advised.