Skip to content
Georgia Commons
Menu

Monroe County · Code of Ordinances

Appendix A - LIST OF ROADWAYS ON-SYSTEM / Chapter 14 - WATERAND SEWERAGE / Article II - WATER SUPPLY SYSTEMS STANDARDS

Sec. 14-26. Purpose.

About this text

  • As published by Municode, current through 2025-03-04
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

The purpose of this article is to set forth minimum standards to be followed in the design and construction of individual and semipublic water

supply systems, to define words used herein, to require permits for the drilling or boring of wells, to require the licensing of well contractors and to eliminate as far as possible pollution of ground and surface waters of the county, thereby controlling the spread of waterborne diseases.

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:monroe-county/code/14-26@2025-03-04-1ccc9a82d4

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Monroe County Code of Ordinances, Sec. 14-26. Purpose | Georgia Commons