"as-built" plans. In such instances where there have been variations from approved construction plans, the following information, as applicable, shall be required: (1) Final profiles of grades for streets. (2) Final plan of water supply system with pipe sizes, location of hydrants, and valves. (3) Final plan of storm drainage system with grade, pipe sizes, location of hydrants, and valves. (4) Final plan of sanitary sewers with grade, pipe sizes, and point of discharge. (5) A complete listing of the deviations from the approved construction plans made by the subdivider.