Skip to content
Georgia Commons
Menu

Monroe County · Code of Ordinances

Appendix A - SUBDIVISIONS / Article III - PROCEDURES FOR SUBDIVISION PLAT APPROVAL / 3.7 - Construction plan specifications.

3.7.3.1. For land that slopes less than approximately two (2) percent:

About this text

  • As published by Municode, current through 2025-03-04
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) Spot elevations shall be shown at all breaks in grade, along all drainage channels or swales, and at selected points not more than one hundred

(100) feet apart in all directions, or

(b) Contours shall be shown with an interval of one (1) foot.

3.7.3.2. For land that slopes more than approximately two (2) percent, contours shall be shown with an interval of not more than five (5) feet if

the ground slope is irregular.

3.7.3.3. A tie to one (1) or more benchmarks shall be shown.

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:monroe-county/code/3.7.3.1@2025-03-04-8f315b5c5d

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.