Skip to content
Georgia Commons
Menu

Monroe County · Code of Ordinances

Appendix A - SUBDIVISIONS / Article III - PROCEDURES FOR SUBDIVISION PLAT APPROVAL / 3.9 - Final plat specifications.

3.9.3. Additional specifications. The final plat

About this text

  • As published by Municode, current through 2025-03-04
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

shall contain the following information:

(1) Name and address of owner of record and of subdivider.

(2) North Point and graphic scale and date.

(3) Vicinity map showing location and acreage of the subdivision.

(4) Names of owners of record of adjoining land with its approximate acreage.

(5) Location of streams, lakes, and swamps and land subject to flood as determined from past history of flooding.

(6) Municipal and county lines shall be shown when such lines traverse or are reasonably close to the subdivision.

(7) The approximate position of land lot lines traversing or touching the subdivision and the approximate position of the nearest land lot corners shall be shown.

(8) Land-lot(s) and land-district number(s) shall be shown.

(9) Exact boundary lines of the tract, determined by a field survey, shall be balanced and closed with an apparent closure precision not to exceed one in fifteen thousand (1:15,000) with the following minimum requirements: distances measured and shown to the nearest one-hundredth

( 1 /100) foot and angles measured and shown to the nearest minute.

(10) Name of subdivision, exact locations, widths, and names of all streets and alleys within and immediately adjoining the new subdivision shall be shown on the

plat.

(11) Street right-of-way lines shall show pertinent curve data.

(12) Lot lines shall be shown with the following minimum requirements: distances to the nearest one-hundredth (1/100) foot

and bearings in degrees and minutes.

(13) Lots shall be numbered in numerical order and blocks, if applicable, lettered alphabetically.

(14) Location, dimensions, and purposes of any easements.

(15) Any areas to be reserved or dedicated for the public use shall be shown on the plat.

(16) Accurate location, material, and description of monuments and markers, shall be described on the plat.

(17) Minimum building front yard setback lines shall be shown.

(18) The number of the parcel being subdivided according to the county tax map and the corresponding tax map number.

3.9.4. Surveyor's certification. A signed certification by a registered land surveyor certifying to the accuracy of the survey and the plat shall be

placed on the final plat in accordance with the Georgia Plat Act.

3.9.5. Owner's certification. A signed certification of ownership shall be placed on the final plat as follows:

"Owner's Certification:

State of Georgia, County of Monroe The undersigned certifies that he is the owner of the land shown on this plat and acknowledges this plat and allotment to be his free act and deed and dedicates to public use forever all

areas shown or indicated on this plat as streets, alleys, easements, or parks."

Date ____________________ Owner's Name

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:monroe-county/code/3.9.3@2025-03-04-3fb7d6d27e

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.