Sec. 5-54. Permits.

About this text

  • As published by Municode, current through 2025-03-04
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) Permit application.

(1) A building permit issued by the chief building official is required prior to initiating work when any owner, authorized agent, or contractor desires to construct,

alter, repair, move, demolish, or change the occupancy of a building or structure, or to erect, install, enlarge, alter, repair, remove, convert or replace any electrical, gas, mechanical, or plumbing system.

Exception: Permits shall not be required for the following mechanical work:

a . Any portable heating appliance;

b. Any portable ventilation equipment;

c. Any portable cooling unit;

(2) (3) (4) (5)

d. Any steam, hot or chilled water piping within any heating or cooling equipment regulated by the construction codes;

e. Replacements of any part which does not alter its approval or make it unsafe;

f. Any portable evaporative cooler;

g. Any self-contained refrigeration system containing ten (10) pounds (4.54 kg.) or less of refrigerant and actuated by motors of one (1) horsepower (746 W) or less.

Minor repairs. Ordinary minor repairs may be made without a permit, provided that such repairs shall not violate any of the provisions of the construction codes.

Work authorized. A building electrical gas, mechanical or plumbing ~ermit shali carry with it the right to construct or install the work, provided the same are shown on the drawings and set forth in the specifications filed with the application for the permit. Where additional work will be performed and is not shown on the

drawings and not covered by the specifications submitted with the original application, additional permits shall be required.

Information required. Each application for a permit, with the required fee, shall be filed with the chief building official on a form furnished for that purpose, and shall contain a general description of the proposed work and its location. The application shall be signed by the owner, or his/her authorized agent. The building

permit application shall indicate the proposed occupancy of all parts of the building and of that portion of the site or lot, if any, not covered by the building or structure, and shall contain such other information as may be required by the chief building official.

Time limitations. An application for a permit for any proposed work shall be deemed to have been abandoned six (6) months after the date of applying for the permit, unless before then a permit has been issued. One (1) or more extensions of time for periods of not more than ninety

(90) days each may be allowed by the chief building official for the application, provided the extension is requested in writing and justifiable cause is demonstrated.

(b) Drawings and specifications.

(1) Requirements. When required by the chief building official, three (3) copies of drawings drawn to scale with sufficient clarity and detail to indicate the nature and

character of the work, shall accompany the application for a permit. One (1) of the three (3) sets of drawings/plans must be reduced to eleven (11) inches by seventeen

(17) inches ledger size.

(2) Additional data. The chief building official may require details, computations, stress diagrams, and other data (prepared

by a design professional) necessary to describe the construction or installation and the basis of calculations. All drawings, specifications and accompanying data required by the chief building official to be

prepared by an architect or engineer shall be affixed with their official seal.

(3) Design professional. The design professional shall be an architect or engineer legally registered under the laws of this

state regulating the practice of architecture or engineering and shall affix his official seal to said drawings, specifications and accompanying data, for the following:

a. All Group "A" - Assembly, "E" - Educational, and "I" - Institutional occupancies.

b. Buildings and structures three (3) stories or more high.

c. Buildings and structures five thousand (5,000) square feet (465 m2) or more in area.

For all other buildings and structures, the submittal shall bear the certification of the applicant that some specific state law exception permits its preparation by a person not so registered.

Exception: Single-family dwellings, regardless of size, shall require neither a registered architect nor engineer, nor a certification that an architect or engineer is not required.

(4) Structural and fire resistance integrity.

Plans for all buildings shall indicate how required structural and fire resistance integrity will be maintained where a penetration of a required fire resistance wall, floor or partition will be made for electrical, gas, mechanical, plumbing, signal and communication conduits, pipes and systems and also indicate in sufficient detail how the fire integrity will be maintained

where required fire resistance floors intersect the exterior walls.

(5) Site drawings. Drawings shall show the location of the proposed building or structure and of every existing building or structure on the site or lot. The chief

building official may require a boundary line survey prepared by a qualified surveyor.

(6) Hazardous occupancies. In the case of hazardous materials or handling, the chief building official may require the following:

a. General site plan. A general site plan drawn at a legible scale which shall include, but not be limited to, the location of all buildings, exterior storage facilities, permanent access ways, evacuation routes, parking lots, internal roads, chemical loading areas, equipment cleaning areas, storm and

sanitary sewer accesses, emergency equipment and adjacent property uses. The exterior storage areas shall be identified with the hazard classes and the maximum quantities per hazard class of hazardous materials stored.

b. Building fioor plan. A building floor plan drawn to a legible scale, which shall include, but not be limited to, all hazardous materials storage facilities within the building and shall indicate rooms, doorways, corridors,

exits, fire rated assemblies with their hourly rating, location ofliquid tight rooms, and evacuation routes. Each hazardous materials storage facility shall be identified on the plan with the hazard classes and quantity range per hazard class or the hazardous materials stored.

(c) Examination of documents.

(1) Plan revew. The chief building official shall examine or cause to be examined each application for a permit and the accompanying documents consisting of drawings, specifications, computations, and additional . data, and shall ascertain by such examinations whether the construction indicated and described is in accordance with the requirements of the construction codes and all other pertinent laws or ordinances.

(d) Affidavits.

(1) Affidavit for permit issuance. The chief building official may accept a sworn affidavit from a registered architect or engineer stating that the plans submitted conform to the construction codes. For

buildings and structures the affidavit must include:

a. Statement that the plans conform to the laws as to egress;

b. Statement that the plans and design conform to the requirements of the construction codes as to strength, stresses, strains, loads and stability;

c. Type of construction and general arrangement;

d. Drawings showing the structural design.

(2) Affidavit for inspection. The chief building official may without any examination or inspection accept an affidavit, provided

the architect or engineer who made such - affidavit agrees to submit to the chief building official, copies of inspection reports as inspections are performed and upon completion of the structure, electrical, gas, mechanical or plumbing systems a certification that the structure, electrical, gas, mechanical or plumbing system has been erected in accordance with the

requirements of the construction codes.

Where the chief building official relies upon such affidavit, the architect or engineer shall assume full responsibility for the compliance with all provisions of the

construction codes and other pertinent laws or ordinances.

(3) Permit issued on basis of an affidavit.

Whenever a permit is issued in reliance upon an affidavit or whenever the work to be covered by a permit involves installation under conditions which, in the opinion of the chief building official, are hazardous or complex, the chief building official shall require that the architect or engineer who signed the affidavit or prepared the drawings or computations shall supervise such work. In addition, they shall be responsible for conformity with the permit, provide copies of inspection reports as inspections are performed, and upon

completion make and file with the chief building official written affidavit that the work has been done in conformity with the reviewed plans and with the structural provisions of the construction codes.

(e) Issuing permits.

( 1) Action on permits. The chief building official shall act upon an application for a permit without unreasonable or unnecessary delay. The chief building official will not issue a building permit until obtaining the approval of the county zoning officer. If the chief building official is

satisfied that the work described in an application for a permit and the contract documents filed therewith conform to the requirements of the construction codes and other pertinent laws and ordinances, he/she shall issue a permit to the applicant.

(2) Refusal to issue permit. If the application for a permit and the accompanying contract documents describing the work do not conform to the requirements of the

construction codes or other pertinent laws or ordinances, the chief building official shall not issue a permit, but shall return the contract documents to the applicant with his/her refusal to issue such permit.

Such refusal shall be in writing and shall contain the reason for refusal.

(3) Public right-of-way. A permit shall not be issued by the chief building official for the construction of any building, or for the alteration of any building where said building is to be changed and such change will affect the exterior walls, bays, balconies,

or other appendages or projections fronting on any street, alley or public lane, or for the placing on any lot or premises of

any building or structure removed from another lot or premises, until all right-ofways and easements have been identified and located to the satisfaction of the chief

building official; and it shall be the duty of the chief building official to see that the right-of-ways are not encroached upon except as provided for in chapter 22 of the Standard Building Code.

(f) Contractor responsibilities. It shall be the duty of every contractor who shall install or repair any building, structure, electrical, gas, mechanical, sprinkler or plumbing systems, for which a permit is required, to comply with state or local rules and regulations concerning licensing which the applicable governing authority may have adopted. In such case that the state requires

a contractor to have obtained a state license before they are permitted to perform work, the contractor shall supply the local government with their license number before receiving a permit for work to be performed.

(g) Conditions of the permit.

(1) Permit intent. A permit issued shall be construed to be a license to proceed with the work and not as authority to violate, cancel, alter, or set aside any of the provisions of the construction codes, nor shall issuance of a permit prevent the chief

building official from thereafter requiring a correction of errors in plans, construction, or violations of the construction codes.

Every permit issued shall become invalid unless the work authorized by such permit is commenced within six (6) months after its issuance, or if the work authorized by such permit is suspended or abandoned for a period of six (6) months

after the time the work is commenced.

One (1) or more extensions of time, for periods not more than six (6) months each, may be allowed for the permit. The extension shall be requested in writing and justifiable cause demonstrated. Extensions shall be documented in writing by the chief building official.

(2) Plans. When the chief building official issues a permit, he shall endorse, in writing or by stamp, three (3) sets of plans "Reviewed for Code Compliance." One (1)

set of plans so reviewed shall be retained by the chief building official, one (1) set will be forwarded to the county tax assessor's office, and the third set shall be returned to the applicant. The permitted plans shall be kept at the site of work and shall be open to inspection by the chief building official or his/her authorized representative.

(h) Fees.

(1) Prescribed fees. A permit shall not be issued until the fees prescribed by the governing authorities have been paid. Nor shall an amendment to a permit be released until the additional fee, if any, due to an increase in the estimated cost of the

building, structure, electrical, plumbing, mechanical or gas systems, etc. has been paid.

(2) Schedule of permit fees. On all buildings, structures, electrical, plumbing, mechanical and gas systems or alterations requiring a permit, a permit fee shall be paid as required at the time of filing application,

in accordance with the fee schedules as set by the governing authorities.

(3) Work commencing before permit issuance.

Any person who commences any work on a building, structure, electrical, gas, mechanical or plumbing, etc. system before obtaining the necessary permits, shall be

subject to a penalty of one hundred (100) percent of the usual permit fee in addition to the required permit fees.

(4) Reinspection fees. When additional inspection trips are made for a permit holder due to any of the following reasons, the

chief building official shall charge an additional fee as listed in the schedule of fees for each such additional inspection:

a. Wrong address given on call for inspection;

b. Work not ready for inspection at time specified;

c. Required corrections not made within time specified;

d. Failure to request required inspections;

e. Property is not accessible.

(5) Refund of fees. Where no work has been done under a valid permit for which fees have been paid and a written request for refund of fees is made by holder thereof within six (6) months of the date of original issuance, the chief building official shall authorize the refund of seventy-five

(75) percent of such fee upon surrender of the permit and cancellation of the permit.

( 6) Accounting. The chief building official shall keep or cause to be kept a permanent and accurate accounting of all permit fees and other money collected, the names of all persons upon whose account the same was paid, along with the date and amount thereof.

(i) Inspections.

(1) Inspection service. The chief building official shall inspect or cause to be inspected at various intervals, the inspections required by subsection 5-54(i)(7). He/she may accept reports of inspectors of recognized inspection services provided that after investigation he/she is satisfied as to

their qualifications and reliability. A certificate called for by any provision of the construction codes shall not be based on

such reports unless the same are in writing and certified by a responsible officer of such service.

(2) Inspections prior to issuance of certificate of occupancy or completion. A final inspection shall be made of every building, structure, electrical, gas, mechanical or plumbing system upon completion, prior to the issuance of the certificate of occupancy or

completion.

(3) Request for inspections. Inspections shall be scheduled with the building inspector prior to when the inspection is needed.

Requests for inspection should include the street address, lot number, building permit number, and type of inspection.

(4) Existing building inspections. Before issuing a permit the chief building official may examine or cause to be examined any

building, electrical, gas, mechanical or plumbing systems for which an application has been received for a permit to enlarge, alter, repair, move, demolish, install, or change the occupancy. Once a permit has been issued, he/she shall inspect all buildings, structures, electrical, gas, mechanical and plumbing systems,

at various intervals, during and upon completion of the work for which a permit was issued. He/she shall make a record of every such examination and inspection and of all violations of the construction codes.

(5) Manufacturers and fabricators. When deemed necessary by the chief building official he/she shall make, or cause to be made, an inspection of materials or assemblies at the point of manufacture or fabrication. A record shall be made of every such examination and inspection and of

all violations of the construction codes.

(6) Posting of permit. Work requiring a permit shall not commence until the permit holder or his/her agent posts the permit

card in a conspicuous place on the premises. The permit shall be protected from the weather and located in such position

as to permit the chief building official or representative to conveniently make the required entries thereon. This permit card shall be maintained in such position by the permit holder until the certificate of occupancy or completion is issued by the chief building official.

(7) Required inspections. The chief building official upon notification from the permit holder or his/her agent shall make the following inspections and such other inspections as necessary, and shall either release that portion of the construction or

shall notify the permit holder or his/her agent of any violations which must be corrected in order to comply with the technical code:

a.

b.

Building.

1. Foundation inspection: To be made after trenches are excavated and forms erected.

2. Frame inspection: To be made after the roof, all framing, fireblocking and bracing are in place, all concealing wiring, all pipes, chimneys, ducts and vents are complete.

3. Final inspection: To be made after the building is completed and ready for occupancy.

Electrical.

1. Underground inspection: To be made after trenches or ditches are excavated, conduit or cable installed, and before any backfill is put in place.

2.

3.

Rough-in inspection: To be made after the roof, framing, fireblocking and bracing is in place and prior to the installation of wall

or ceiling membranes.

Final inspection: To be made after the building is complete, all required electrical fixtures are in place and properly connected or protected, and the structure is ready for occupancy.

c. Plumbing.

1. Underground inspection: To be made after trenches or ditches are excavated, piping installed, and before any backfill is put in place.

2. Rough-in inspection: To be made after the roof, framing, fireblocking and bracing is in place and all soil, waste and vent piping

is complete, and prior to this installation of wall or ceiling membranes.

3. Final inspection: To be made after the building is complete, all plumbing fixtures are in place and properly connected, and the structure is ready for occupancy.

4. Note: See Section 311 of the Standard Plumbing Code for required tests.

d. Mechanical.

1. Underground inspection: To be made after trenches or ditches are excavated, underground duct and fuel piping installed, and before any backfill is put in place.

2. Rough-in inspection: To be made after the roof, framing, fire blocking and bracing are in place and all ducting, and other concealed components are complete, and prior to the installation of wall or ceiling membranes.

3. Final inspection: To be made after the building is complete, the mechanical system is in place and properly connected, and the structure is ready for occupancy.

314

e. Gas.

1. Rough piping inspection: To be made after all new piping authorized by the permit has been installed, and before any such

piping has been covered or concealed or any fixtures or gas appliances have been connected.

2. Final piping inspection: To be made after all piping authorized by the permit has been installed and after all portions which are to be concealed by plastering or otherwise have been so concealed, and before any fixtures or gas appliances have been connected. This inspection shall include a pressure test.

3. Final inspection: To be made on all new gas work authorized by the permit and such portions of existing systems as may be affected by new work or any changes in order to insure compliance with all the requirements of the construction codes and to assure that the installation and construction of the gas system is in accordance with

reviewed plans.

f. Energy.

1. Foundation inspection: To be made before slab concrete is poured in place. To verify that perimeter insulation has been installed correctly on any slab on grade foundations, if required.

2. Frame inspection: To be made before exterior wall insulation is concealed by wall board to check installation of exterior walls insulation and to inspect that all holes and cracks through the structure envelope have been sealed in an appropriate manner as to restrict air passage.

3. Final inspection: To be made after the building is completed and ready for occupancy. To verify installation and R-value of ceiling and floor insulation. To

verify correct SEER ratings on appliances.

(8) Written release. Work shall not be done on any part of a building, structure, electrical, gas, mechanical or plumbing system beyond the point indicated in each successive inspection without first obtaining a written release from the chief building

official. Such written release shall be given only after an inspection has been made of each successive step in the construction or installation as indicated by each of the foregoing three (3) inspections.

(9) Reinforcing steel, structural frames, insulation, plumbing, mechanical, or electrical systems. Reinforcing steel, structural frame, insulation, plumbing, work of any

part of any building or structure shall not be covered or concealed without first obtaining a release from the chief building official.

(10) Plaster fire protection. In all buildings where plaster is used for fire protection purposes, the permit holder or his/her agent shall notify the chief building official after all lathing and backing is in place. Plaster shall not be applied until

the release from the chief building official has been received.

(j) Certificates.

(1) Certificate of occupancy.

a. Building occupancy. A new building shall not be occupied or a change made in the occupancy, nature or use of a building or part of a building until after the chief building official has issued a certificate of occupancy.

Said certificate shall not be issued until all required electrical, gas, mechanical, plumbing and fire protection systems have been inspected for compliance with the construction

codes and other applicable laws and ordinances and released by the chief building official.

b. Issuing certificate of occupancy. Upon satisfactory completion of construction of a building or structure and installation of electrical, gas, mechanical and plumbing systems in accordance with the construction codes, reviewed plans and specifications,

and after the final inspection, the chief building official shall issue a certificate of occupancy stating the nature of the occupancy permitted, the number of persons for each floor when limited by law, and the allowable load per square foot for each floor in accordance with the provisions of the construction codes.

c. Temporary I partial occupancy. A temporary/partial certificate of occupancy may be issued for a portion of a building, which may safely be occupied prior to final completion of the building.

d. Existing building certificate of occupancy. A certificate of occupancy for any existing building may be obtained by applying to the chief building official and supplying the information and data necessary to determine compliance with the construction codes for the occupancy intended. Where necessary, in the

opinion of the chief building official, three (3) sets of detailed drawings, or a general inspection, or both, may be required. When, upon examination and inspection, it is found that the building conforms to the provisions of the construction codes and other applicable laws and ordinances

for such occupancy, a certificate of occupancy shall be issued.

(2) Certificate of completion. Upon satisfactory completion of a building, structure, electrical, gas, mechanical or plumbing

system, a certificate of completion may be issued. This certificate is proof that a structure or system is complete and for certain types of permits is released for use and may be connected to a utility system.

This certificate does not grant authority to occupy or connect a building, such as a shell building, prior to the issuance of a certificate of occupancy.

(3) Service utilities.

a. Connection of service utilities. No person shall make connections from a utility, source of energy, fuel or power to any building or system which is regulated by the construction codes for which a permit is required, until permanent connection is made to a septic tank or city sewer system.

b. Authority to disconnect service utilities. The chief building official shall have the power to authorize disconnection of utility service to the building, structure or system regulated by the construction codes, in case of

emergency where necessary to eliminate an immediate hazard to life or property. The chief building official

shall notify the serving utility, and whenever possible the owner and occupant of the building, structure or service system of the decision to disconnect prior to taking such action. If not notified prior to disconnecting, the owner or occupant of the building, structure or service system

shall be notified in writing, as soon as practical thereafter.

(k) Posting fioor loads.

(1) Occupancy. An existing or new building shall not be occupied for any purpose, which will cause the floors thereof to be loaded beyond their safe capacity. The chief building official may permit occupancy of a building for mercantile, commercial or industrial purposes, by a specific business, when he/she is satisfied that such capacity will not thereby be

exceeded.

(2) Storage and factory-industrial occupancies. It shall be the responsibility of the owner, agent, proprietor or occupant of

Group S (Storage) and Group F (Factory) occupancies, or any occupancy where excessive floor loading is likely to occur, to employ a competent architect or engineer

in computing the safe load capacity. All such computations shall be accompanied by an affidavit from the architect or engineer stating the safe allowable floor load on each floor in pounds per square foot is

uniformly distributed. The computations and affidavit shall be filed as a permanent record of the building department.

(3) Signs required. In every building or part of a building used for storage, industrial or hazardous purposes, the safe floor loads, as reviewed by the chief building official on the plan, shall be marked on plates or approved design which shall be supplied and securely affixed by the owner of the building in a conspicuous place in each story to which they relate. Such plates shall not be removed or defaced, and if lost, removed or defaced, shall be replaced by the owner of the building.

History

The history line the source prints at the end of the section.

(Ord. of 12-3-04, § 4)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:monroe-county/code/5-54@2025-03-04-044c3abbc9

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.