Skip to content
Georgia Commons
Menu

Monroe County · Code of Ordinances

Part II - CODE OF ORDINANCES / Chapter 5 - BUILDINGS AND BUILDING REGULATIONS / Article V - MINIMUM HEALTH AND SAFETY STANDARDS FOR PRE-OWNED MANUFACTURED HOMES

Sec. 5-73. Permitting, inspection, certificate of occupancy and fees.

About this text

  • As published by Municode, current through 2025-03-04
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

A permit shall be required to locate a preowned manufactured home in the jurisdiction. All permits shall be issued within three (3) days of

receipt of all items listed in subsections (1)a.—d.

of this section.

(1) Permit. To obtain a permit, applicants shall provide to the building inspector:

a. An affidavit signed by the applicant that the pre-owned manufactured home meets health and safety standards required by this Act;

b. Photographs of the interior and exterior of the pre-owned manufactured home providing evidence that home meets the minimum health

and safety standards of section 5-74;

c. A two hundred dollar ($200.00) refundable cash deposit; and

d. The permit and inspection fee required by subsection (4) of this section.

(2) Inspection. Upon receipt of a permit, applicants may relocate the manufactured home on a residential site for the purposes of inspection. Applicant shall arrange for an inspection to be held once the installation of the manufactured home is

complete.

(3) Certificate of occupancy. A certificate of occupancy shall be issued to the applicant at such time that the building inspector certifies that the requirements of this article have been met.

(4) Fee. A permit and inspection fee of shall be charged to the applicant according to the posted fees on the Forsyth/Monroe County building department to cover the cost to the county to process the permit application and inspect the pre-owned manufactured home. Such fee shall cover the initial inspection and one (1) followup

inspection. The applicant shall be charged for each additional followup inspection that may be necessary.

(5) Alternative inspection. At the request of the applicant, the building inspector may, at his or her discretion, inspect a preowned manufactured home prior to its being relocated if the home is then located

at another site within the county.

History

The history line the source prints at the end of the section.

(Ord. of 9-7-10, § 3)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:monroe-county/code/5-73@2025-03-04-649c66afcb

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Monroe County Code of Ordinances, Sec. 5-73. Permitting, inspection, certificate of occupancy and fees | Georgia Commons