--- title: Monroe County Code of Ordinances, 5.10.5.1. Subdivider's responsibility. The collection: local-codes id: local-code:monroe-county/code/5.10.5.1 cite_as: Monroe County, Ga., Code of Ordinances ยง 5.10.5.1 canonical_url: https://georgiacommons.org/counties/monroe/code/5.10.5.1 md_url: https://georgiacommons.org/counties/monroe/code/5.10.5.1.md text_url: https://georgiacommons.org/counties/monroe/code/5.10.5.1/text source_url: https://library.municode.com/ga/monroe_county/codes/code_of_ordinances date: 2025-03-04 status: active jurisdiction: county:monroe jurisdiction_name: Monroe County county_fips: "13207" corpus_version: local-codes-monroe-county-4c4d855fb11d publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/monroe/code/~appendix-a/~article-v.md previous: https://georgiacommons.org/counties/monroe/code/5.10.4.md next: https://georgiacommons.org/counties/monroe/code/5.10.5.3.md index: https://georgiacommons.org/counties/monroe.md branch: code edition: As published by Municode, current through 2025-03-04 edition_date_kind: current_through source_publisher: Municode version_id: local-code:monroe-county/code/5.10.5.1@2025-03-04-419c8398f9 --- # Monroe County Code of Ordinances, 5.10.5.1. Subdivider's responsibility. The > As published by Municode, current through 2025-03-04 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix A - SUBDIVISIONS / Article V - REQUIRED SUBDIVISION IMPROVEMENTS subdivider shall incur the cost of construction and installation of all required public improvements based on the following: 1. Streets. Incur the cost for the construction of streets up to twenty-seven (27) feet in pavement width from back of curb to back of curb, or twenty-two (22) feet in pavement width from edge of pavement to edge of pavement if no curbs and gutters are installed and the cost incurred to properly grade and drain street according to county specifications. 2. Water and sewer systems. Incur the cost for the installation of all water and sewer systems which are required to serve the new subdivision and tie in with existing water and sewer system based on the specifications set forth herein. 3. Monuments. Entire cost. 4. Street signs. Entire cost. 5.10.5.2. Board of commissioners' responsibility. The board of Commissioners may partially participate in sharing the cost of construction and installation of required public improvements for the following conditions: 1. Streets. Incur cost for any additional required pavement which is in excess of twenty-seven (27) feet for streets with curbs and gutters and in excess of twentytwo (22) feet for streets without curbs and gutters, and any additional grading and paving related thereto. 2. Water and sewer systems. Incur cost for any difference in the cost of the laying of over-sized pipe and outfall systems which are needed in excess of the required water and sewer facilities needed to exclusively serve the new subdivision as determined by the board of commissioners.