--- title: Monroe County Code of Ordinances, 5.5.4. Installation of utilities. After grading is collection: local-codes id: local-code:monroe-county/code/5.5.4 cite_as: Monroe County, Ga., Code of Ordinances § 5.5.4 canonical_url: https://georgiacommons.org/counties/monroe/code/5.5.4 md_url: https://georgiacommons.org/counties/monroe/code/5.5.4.md text_url: https://georgiacommons.org/counties/monroe/code/5.5.4/text source_url: https://library.municode.com/ga/monroe_county/codes/code_of_ordinances date: 2025-03-04 status: active jurisdiction: county:monroe jurisdiction_name: Monroe County county_fips: "13207" corpus_version: local-codes-monroe-county-4c4d855fb11d publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/monroe/code/~appendix-a/~article-v.md previous: https://georgiacommons.org/counties/monroe/code/5.5.3.md next: https://georgiacommons.org/counties/monroe/code/5.5.5.md index: https://georgiacommons.org/counties/monroe.md branch: code edition: As published by Municode, current through 2025-03-04 edition_date_kind: current_through source_publisher: Municode version_id: local-code:monroe-county/code/5.5.4@2025-03-04-6d30268ce2 --- # Monroe County Code of Ordinances, 5.5.4. Installation of utilities. After grading is > As published by Municode, current through 2025-03-04 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix A - SUBDIVISIONS / Article V - REQUIRED SUBDIVISION IMPROVEMENTS / 5.5 - Basic construction requirements for all streets. completed and approved and before any base is applied, all of the underground utilities—water mains, sewer mains, gas mains and all service connections related thereto, and where available— shall be installed completely in accordance with Appendix B: Monroe County Utility Placement Standards and approved throughout the length of the street and across the flat section. All driveways for houses to be built by the subdivider shall be cut and drained. Where the utility mains are off the pavement, the subdivider may elect to omit the installation of service connections providing that at such time as these service connections are needed, they may be jacked across the street without breaking or weakening the existing pavement.