A publicly connected sanitary sewer system shall be installed when the cost of installing such a system does not exceed one hundred fifty (150) percent of the cost of installing septic tanks for all lots in the subdivision and where said system is available from a public agency subject to regulation by the board of commissioners or as the result of a contract between that board and another public agency or body. Where lots cannot be economically connected with a sewerage system, they must contain adequate area for the installation of on-site sewage management systems approved by the environmental sanitarian. Sewer lines shall be installed in the center of the road. All sewer facilities shall be installed in accordance with the standards of the environmental protection division, state department of natural resources.