--- title: Monroe County Code of Ordinances, 5.9.4. Water collection: local-codes id: local-code:monroe-county/code/5.9.4 cite_as: Monroe County, Ga., Code of Ordinances ยง 5.9.4 canonical_url: https://georgiacommons.org/counties/monroe/code/5.9.4 md_url: https://georgiacommons.org/counties/monroe/code/5.9.4.md text_url: https://georgiacommons.org/counties/monroe/code/5.9.4/text source_url: https://library.municode.com/ga/monroe_county/codes/code_of_ordinances date: 2025-03-04 status: active jurisdiction: county:monroe jurisdiction_name: Monroe County county_fips: "13207" corpus_version: local-codes-monroe-county-4c4d855fb11d publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/monroe/code/~appendix-a/~article-v.md previous: https://georgiacommons.org/counties/monroe/code/5.9.3.md next: https://georgiacommons.org/counties/monroe/code/5.9.5.md index: https://georgiacommons.org/counties/monroe.md branch: code edition: As published by Municode, current through 2025-03-04 edition_date_kind: current_through source_publisher: Municode version_id: local-code:monroe-county/code/5.9.4@2025-03-04-bec0154c3f --- # Monroe County Code of Ordinances, 5.9.4. Water > As published by Municode, current through 2025-03-04 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix A - SUBDIVISIONS / Article V - REQUIRED SUBDIVISION IMPROVEMENTS Water mains for both domestic use and fire protection shall be properly connected with the public water system or with an alternate water supply approved by the environmental sanitarian. Water mains shall be installed on the north or west side of the road, whichever is applicable, and within the back five (5) feet of the right-of-way. The lines shall be constructed in such a manner as to serve adequately all lots shown on the subdivision plat. The lines shall be installed in conformance with the county master plan and according to the technical standards established by the board of commissioners.