Skip to content
Georgia Commons
Menu

Monroe County · Code of Ordinances

Appendix A - SUBDIVISIONS / Article V - REQUIRED SUBDIVISION IMPROVEMENTS

5.9.5. Water systems.

About this text

  • As published by Municode, current through 2025-03-04
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

All subdivisions as a

condition of approval which are accessible to the county water system shall be connected to the county water system, and the developer shall install water lines, valves and hydrants within the geographical confines of said subdivision, according to the following standards, and connect the same to the county water system.

a. Waterlines, valves, and fire hydrants sufficient to connect the subdivision to the water system of the county, the same

being identified as the county water system will be developed, constructed, and installed in accordance with the approved county water system master plan.

b. The construction and installation of this extension of any county water system will be in accordance with the standards and specifications of the county and the county water department.

c. All construction and installation of any water system extension shall be in a good and workmanlike manner.

d. All construction and installation of any water system will be subject to the inspection and approval of the county and the county water department.

e. The design and layout of any water system extension shall be subject to the approval of the county and the county water department.

f. The materials for the installation of any water system extension shall be subject to the approval of the county and the county water department.

g. Said water system extension shall be installed in right-of-way owned by or deeded to the county, or upon easements subject to the approval of the county. The entire water system and water system extension and the easements or right-ofway on which the same is located shall be conveyed to the county by warranty deed.

h. Provide complete plans and specifications for the water system extension to the county prior to installation.

i. The developer shall sign a maintenance bond agreement as specified in section 6.2.

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:monroe-county/code/5.9.5@2025-03-04-b6edc91a30

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Monroe County Code of Ordinances, 5.9.5. Water systems | Georgia Commons