(a) A solar farm installation shall be permit-ted as a conditional use in agricultural zoned districts classified as "A", commercial zoned districts classified as "C", and industrial zoned districts classified as "I". (b) A solar farm installation shall be constructed on five (5) or more acres within the "A", "C" or "I" zone/conditional use district for the purpose of generation of power to be sold as electricity to the utility grid and to be used on-site as electricity for consumption in an agricultural setting, establishment, or in farm-ing activities. (c) A solar farm connected to the utility grid in "A", "C", or "I" zoned districts shall provide a "proof of concept letter" from the local utility company acknowledging the solar farm will be interconnected to the utility grid in order to sell electricity to the public utility entity. (d) Ifthe solar farm will be constructed by the utilization of ground mounting, then a ground mounting plan and process must be submitted during the county application process. The ground mounting plan may consist of standard solar manufacturer installation plans and processes for ground mounting. (e) Solar panels shall not be placed in the vicinity of any airport in a manner that would interfere with airport flight patterns. Acknowledgement from the Federal Aviation Administration may be necessary. (f) All power transmission lines from a ground mounted solar farm shall be located underground after connection from the solar panel combiners to the interconnection point. (g) A solar energy system shall not be used to display advertising, including signage, stream-ers, pennants, spinners, reflectors, ribbons, tinsel, balloons, flags, banners or similar materials. The manufacturers’ or installers' identification and appropriate warning signage shall be posted at the site in a clearly visible manner. (h) The local utility provider shall be contacted to determine grid interconnection and net meter-ing policies. (i) If a solar farm is located in a designated county watershed protection district, the solar farm developer must provide an impact state-ment concerning net effect of solar farm instal-lation within the designated county watershed area. Limitations on ground disturbance will be determined and conditions of disturbance may be imposed as a condition of approval for solar farm development, construction, and operation. Gj) View shed/glare. The applicant shall demonstrate that the proposal will not have an adverse affect on neighboring properties by provid-ing aerials of the site, graphic renderings of the project, and/or pictures from the site of surround-ing parcels demonstrating sight lines. Appropri-ate vegetated buffers and/or plantings may also be required to help limit the visual impact of the site and possible glare issues (k) Solar panels shall be placed such that concentrated solar radiation or glare shall not be directed onto nearby properties or roadways. (1) The design of the solar energy system shall conform to applicable industry standards. A building permit shall be obtained for a solar energy system per the Georgia Building Code, and the regulations adopted by the Department of Labor and Industry. All wiring shall comply with the applicable version of the National Electric Code (NEC). The local utility provider shall be contacted to determine grid interconnection and net metering policies. The applicant shall submit certificates of design compliance obtained by the equipment manufacturer from a certifying organization and an engineer registered in the state shall certify any such design.