--- title: Monroe County Code of Ordinances, Sec. 6.5-60. [Completion of application.] collection: local-codes id: local-code:monroe-county/code/6.5-60 cite_as: Monroe County, Ga., Code of Ordinances ยง 6.5-60 canonical_url: https://georgiacommons.org/counties/monroe/code/6.5-60 md_url: https://georgiacommons.org/counties/monroe/code/6.5-60.md text_url: https://georgiacommons.org/counties/monroe/code/6.5-60/text source_url: https://library.municode.com/ga/monroe_county/codes/code_of_ordinances date: 2025-03-04 status: active jurisdiction: county:monroe jurisdiction_name: Monroe County county_fips: "13207" corpus_version: local-codes-monroe-county-4c4d855fb11d publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/monroe/code/~part-ii/~chapter-6.5/~article-ii.md previous: https://georgiacommons.org/counties/monroe/code/6.5-59.md next: https://georgiacommons.org/counties/monroe/code/6.5-61.md index: https://georgiacommons.org/counties/monroe.md branch: code edition: As published by Municode, current through 2025-03-04 edition_date_kind: current_through source_publisher: Municode version_id: local-code:monroe-county/code/6.5-60@2025-03-04-b5590ab271 --- # Monroe County Code of Ordinances, Sec. 6.5-60. [Completion of application.] > As published by Municode, current through 2025-03-04 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 6.5 - ENVIRONMENT / Article II - SOLAR ENERGY FARMS The following information shall be submitted for an application to be considered complete: (1) A descriptive site plan including setbacks, panel sizes, locations of property lines, building, and road right of ways; (2) Landscaping plan to scale indicating size, spacing and type of fence, shrubbery, trees or earthen berm as required by section 6.5-57; (3) A description of the anticipated maintenance needs for the solar energy farm, including frequency of service, personnel needs, equipment needs, and traffic, noise, or safety impacts of such maintenance; (4) A utilities inventor showing the locations of all water, sewage, drainage, and power line easements impacting the proposed site. (5) Relevant studies, reports, certificates and approvals as may be reasonably requested by the department, including but not limited to design review; (6) A storm water management study shall be provided to ensure compliance with local BMP's; and (7) Before any construction can commence on any solar energy system, the property owner must acknowledge, in writing to the board of commissioners that he/she is the responsible party for owning and maintaining the solar energy system. ## History (Ord. of 4-1-2014)