The following requirements shall be met for decommissioning: (1) The solar energy farm owner is required to notify the board of commissioners immediately upon cessation or abandonment of the operation. The owner shall be responsible for the removal of the facility within six (6) months from the date the applicant ceases use of the facility or the facility becomes obsolete. (2) The owner shall then have twelve (12) months in which to dismantle and remove the solar energy farm from the property. (3) At the time of issuance of the permit for the construction of the solar energy farm, the owner shall provide financial security in form and amount acceptable to the board of commissioners to secure the expense of dismantling and removing said structures. (4) If a ground mounted solar energy farm has been abandoned (meaning not having been in operation for a period of six (6) months) or is defective or is deemed to be unsafe by the board of commissioners, the solar energy system shall be required to be repaired by the owner to meet federal, state and local safety standards, or be removed by the property owner within the time period allowed by the board of commissioners. If the owner fails to remove or repair the defective or abandoned solar energy farm, the board of commissioners may pursue a legal action to have the system removed at the owner's expense. (5) If a ground mounted solar energy farm is removed, any earth disturbance as a result of the removal of the ground mounted solar energy farm shall be graded and reseeded.