Skip to content
Georgia Commons
Menu

Monroe County · Code of Ordinances

Part II - CODE OF ORDINANCES / Chapter 8 - ROADS AND BRIDGES / Article I - IN GENERAL

Sec. 8-1. Driveway culvert installation on public roadways.

About this text

  • As published by Municode, current through 2025-03-04
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) Prior to installing or having installed driveway culverts on public roadways of the county, the property owner of such property shall obtain a permit from the road superintendent of the county or its [his] designated agent. The driveway and culvert site shall be inspected and approved by the road superintendent of the county or its [his] designated agent prior to installation of any culvert on the right-of-way of county public roads.

(b) Culverts shall have a minimum diameter of fifteen (15) inches and a minimum length of twenty-four (24) feet. Any exceptions in such measurements must be approved by the road superintendent or its [his] designated agent.

(c) Driveways must be designed to prevent excess water from entering the public roads of the county, and, if required by the road superintendent or its [his] designated agent, the property owner must take whatever action necessary to satisfy this requirement before a permit is issued.

(d) All persons obtaining a driveway culvert installation permit for culverts which are not to be installed by the county shall pay a fee of twenty dollars ($20.00); provided, however, should a person knowingly and willfully fail to obtain such permit prior to the installation of such culvert, the fee shall be sixty dollars ($60.00), and the failure to pay such fee within thirty (30) days of notification shall institute [constitute] a violation of this section and be punishable as a misdemeanor.

History

The history line the source prints at the end of the section.

(Ord. of 12-6-94)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:monroe-county/code/8-1@2025-03-04-846f3a3ae5

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Monroe County Code of Ordinances, Sec. 8-1. Driveway culvert installation on public roadways | Georgia Commons