(a) Quality of work. The work shall be performed in a workmanlike manner and all installations shall be done by the permittee/ owner in such a way to leave free flows in drainage ditches, pipes, culverts or other surface water drainage facilities of the roadway or its connections. No part of any installation shall be attached to any portion of a bridge, culvert or other structure of the roadway without special authorization of the county road superintendent after detailed information is furnished as he may require. (b) Cutting of pavement. Where cutting of the pavement has been approved, an eight-inch concrete slab shall be poured over the ninety-five (95) percent compacted backfill trench and will rest on undisturbed soil (see attached detail). If the pavement is asphalt, the surface of the eight-inch concrete slab must be two (2) inches below the surface of the abutting pavement. The finished surface must be smooth and flush with abutting pavement using an asphaltic top, type "F", two (2) inches minimum. No pavement shall be cut unless specifically authorized by the permit. (c) Underground facilities. (1) Service and other small diameter pipes shall be jacked, driven, or otherwise forced underneath the pavements on any based or surfaced road without disturbing said pavement. No pavement shall be cut unless specifically authorized by the permit. (2) The facility trench shall be backfilled carefully after the facility has been installed in accordance with the standard practice for installing culverts and minor structures. In crossing roadways, the backfill must be made in six-inch layers and each layer firmly compacted. Where roadway grass is disturbed, satisfactory replacement will be accomplished including adequate seeding of new grass. No driveway cuts will be allowed.