Monroe County · Code of Ordinances
Part II - CODE OF ORDINANCES / Chapter 8 - ROADS AND BRIDGES / Article III - TIMBER HARVESTING
Sec. 8-56. Damage.
About this text
- As published by Municode, current through 2025-03-04
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
The bond or letter of credit required by section 8-55 of this article shall protect Monroe County against any damage requiring re-ditching or repair of existing ditch structure or the removal of any harvesting residue, including treetops, debris, logs, pulpwood and other materials, placed in or around the county's rights of way caused by such person or firm tendering the bond or letter of credit. The proceeds of such bond or letter of credit shall be available to reimburse the county for any cost incurred to repair such damages or remove such debris in or around the county's rights of way. The proceeds of such bond or letter of credit shall also be available to reimburse the county for any costs incurred to maintain or repair county roads damaged by the ingress or egress of motor vehicles engaged in the harvest operations located within five hundred (500) feet of any point of ingress or egress of the timber harvesting operation. The right of Monroe County to call such bond or letter of credit in accordance with the provisions of section 8-57 of this article shall be in addition to any other remedies available to the county at law or in equity for damage to county roads or rights of way.
History
(Ord. of 02-02-2021, § 1)
Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.