tower or antenna for which a permit has been properly issued prior to the effective date of this section shall not be required to meet the provisions of this section, other than sections 87.4.11, 87.4.5.f, and 87.4.13; and the requirements of sections 87.4.5 (except subsection 87.4.5.f, 87.4.7 and 87.4.8) within six (6) months from the date of adoption of this section. Any such towers or antennae shall be referred to in this section as !pre-existing towers! or !pre-existing antennae.! Provided, however, that the placement of antennae on any nonconforming structure shall not create a vested right for the continued use of the structures should the nonconforming use cease. If an additional antenna is co-located upon a pre-existing tower after adoption of this section, then the requirements of section 87.4.5 (except subsection 87.4.5.f, 87.4.7 and 87.4.8) shall be met as part of the permitting process. 87.3. General provisions.