--- title: "Monroe County Code of Ordinances, 89.4. General Provisions:" collection: local-codes id: local-code:monroe-county/code/89.4 cite_as: Monroe County, Ga., Code of Ordinances ยง 89.4 canonical_url: https://georgiacommons.org/counties/monroe/code/89.4 md_url: https://georgiacommons.org/counties/monroe/code/89.4.md text_url: https://georgiacommons.org/counties/monroe/code/89.4/text source_url: https://library.municode.com/ga/monroe_county/codes/code_of_ordinances date: 2025-03-04 status: active jurisdiction: county:monroe jurisdiction_name: Monroe County county_fips: "13207" corpus_version: local-codes-monroe-county-4c4d855fb11d publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/monroe/code/~appendix-a/~article-viii.md previous: https://georgiacommons.org/counties/monroe/code/89.3.md next: https://georgiacommons.org/counties/monroe/code/89.4.1.md index: https://georgiacommons.org/counties/monroe.md branch: code edition: As published by Municode, current through 2025-03-04 edition_date_kind: current_through source_publisher: Municode version_id: local-code:monroe-county/code/89.4@2025-03-04-5af9dbc27b --- # Monroe County Code of Ordinances, 89.4. General Provisions: > As published by Municode, current through 2025-03-04 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix A - SUBDIVISIONS / Article VIII - SPECIAL PROVISIONS a. A solar farm installation shall be permitted as a conditional use in agricultural zoned districts classified as %A%, Commercial zoned districts classified as %C%, and Industrial zoned districts classified as %I%. b. A solar farm installation shall be constructed on 5 or more acres within the %A%, %C% or %I% zone/conditional use district for the purpose of generation of power to be sold as electricity to the utility grid and to be used on-site as electricity for consumption in an agricultural setting, establishment, or in farming activities. c. A solar farm connected to the utility grid in %A%, %C%, or %I% zoned districts shall provide a %proof of concept letter% from the local utility company acknowledging the solar farm will be interconnected to the utility grid in order to sell electricity to the public utility entity. d. If the solar farm will be constructed by the utilization of ground mounting, then a ground mounting plan and process must be submitted during the county application process. The ground mounting plan may consist of standard solar manufacturer installation plans and processes for ground mounting. e. Solar panels shall not be placed in the vicinity of any airport in a manner that would interfere with airport flight patterns. Acknowledgement from the Federal Aviation Administration may be necessary. f. All power transmission lines from a ground mounted solar farm shall be located underground after connection from the solar panel combiners to the interconnection point. g. A solar energy system shall not be used to display advertising, including signage, streamers, pennants, spinners, reflectors, ribbons, tinsel, balloons, flags, banners or similar materials. The manufacturers' or installers' identification and appropriate warning signage shall be posted at the site in a clearly visible manner. h. The local utility provider shall be contacted to determine grid interconnection and net metering policies. i. If a solar farm is located in a designated county watershed protection district, the solar farm developer must provide an impact statement concerning net effect of solar farm installation within the designated county watershed area. Limitations on ground disturbance will be determined and conditions of disturbance may be imposed as a condition of approval for solar farm development, construction, and operation. j. View shed/glare - The applicant shall demonstrate that the proposal will not have an adverse affect on neighboring properties by providing aerials of the site, graphic renderings of the project, and/or pictures from the site of surrounding parcels demonstrating sight lines. Appropriate vegetated buffers and/or plantings may also be required to help limit the visual impact of the site and possible glare issues k. Solar panels shall be placed such that concentrated solar radiation or glare shall not be directed onto nearby properties or roadways. l. The design of the solar energy system shall conform to applicable industry standards. A building permit shall be obtained for a solar energy system per the Georgia Building Code, and the regulations adopted by the Department of Labor and Industry. All wiring shall comply with the applicable version of the National Electric Code (NEC). The local utility provider shall be contacted to determine grid interconnection and net metering policies. The applicant shall submit certificates of design compliance obtained by the equipment manufacturer from a certifying organization and an engineer registered in the State of Georgia shall certify any such design.