submitted for an application to be considered complete: a. A descriptive site plan including setbacks, panel sizes, locations of property lines, building, and road right of ways; b. Landscaping plan to scale indicating size, spacing and type of fence, shrubbery, trees or earthen berm as required by 89.4.3; c. A description of the anticipated maintenance needs for the Solar Energy Farm, including frequency of service, personnel needs, equipment needs, and traffic, noise, or safety impacts of such maintenance; d. A utilities inventor showing the locations of all water, sewage, drainage, and power line easements impacting the proposed site. e. Relevant studies, reports, certificates and approvals as may be reasonably requested by the department, including but not limited to design review; f. A storm water management study shall be provided to ensure compliance with local BMP's; and g. Before any construction can commence on any solar energy system, the property owner must acknowledge, in writing to the board of commissioners that he/she is the responsible party for owning and maintaining the solar energy system.