Monroe County · Code of Ordinances
Appendix A - SUBDIVISIONS / Article VIII - SPECIAL PROVISIONS
89.7. Mechanical equipment. All mechanical
About this text
- As published by Municode, current through 2025-03-04
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
equipment associated with and necessary for the operation of the solar energy system shall comply with the following:
a. Mechanical equipment shall be screened from any adjacent property that is
residentially zoned or used for residential purposes. The screen shall consist of
shrubbery, trees, or other non-invasive plant species, which provides a visual screen. In lieu of a planting screen, a decorative fence meeting the requirements of the zoning ordinance may be used.
b. Mechanical equipment shall not be located within the minimum front yard setback
of the underlying zoning district.
c. Mechanical equipment shall comply with the setbacks specified for Primary
structures in the underlying zoning district.
89.8. Decommissioning. The following requirements shall be met for decommissioning:
a. The solar energy farm owner is required to notify the Board of Commissioners
immediately upon cessation or abandonment of the operation. The owner shall be responsible for the removal of the
facility within six (6) months from the date the applicant ceases use of the facility or the facility becomes obsolete.
b. The owner shall then have twelve (12) months in which to dismantle and remove
the solar energy farm from the property.
c. At the time of issuance of the permit for the construction of the solar energy farm, the owner shall provide financial security in form and amount acceptable to the
board of commissioners to secure the expense of dismantling and removing said structures.
d. If a ground mounted solar energy farm has been abandoned (meaning not having
been in operation for a period of six (6) months) or is defective or is deemed to be unsafe by the board of commissioners,
the solar energy system shall be required to be repaired by the owner to meet
federal, state and local safety standards, or be removed by the property owner
within the time period allowed by the board of commissioners. If the owner fails to remove or repair the defective or abandoned solar energy farm, the board
of commissioners may pursue a legal action to have the system removed at the owner's expense.
e. If a ground mounted solar energy farm is removed, any earth disturbance as a
result of the removal of the ground mounted solar energy farm shall be graded and reseeded.
Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.