(a) Safety inspection. All of the following must be completed before calling for the inspection: (1) The home must be completely set up and tied down. We will inspect the piers, anchors, and straps. (2) The home must be completely installed under the home IAW Manual for on-site sewage management. Four-inch schedule 40 pipe must be used from the edge of the building to the on-site sewage system. (3) The electrical service must be connected. We will inspect the service pole, the outside and inside electrical panel. (4) The water service must be connected. (5) The inspector will need access to the inside of the home. Please make arrangements for access with the inspector. (6) Do not underpin (skirt) the home until the safety inspection has been approved. (b) Final inspection. The following items must be completed before calling for this inspection: (1) The mobile home must be underpinned. (2) The landings and steps (porches or decks) must be completed and properly placed. (3) The owner's copy of the on-site sewage final inspection form must be presented to the Building Official. (c) Permit and inspection information. The permit is valid for six months. Each time an inspection is made, it renews the permit for an additional six months. If the permit goes over six months without an inspection, it will expire unless you call for an extension before it expires.