(a) HUD Code or DCA approved manufactured homes, as defined in section 16-87, will be permitted for location in Montgomery County. Pre-HUD manufactured homes located within the County prior to the adoption of the ordinance from which this article is derived may be relocated inside the County, subject, however, to other requirements for moving manufactured homes as provided herein, including site permit, on-site sewage permit, and all installation and final inspections as required herein. Mobile homes which met the Manufactured Housing Construction and Safety Standards; Title 24 Code of Federal Regulations (CFR), Part 3280 at the time of manufacture and have been subsequently remodeled, altered or refurbished must still meet all of the requirements of the HUD Regulations prior to entry into Montgomery County. (b) All manufactured homes must be located on an approved site which conforms to the standards outlined in this article and be no less than usable acreage that is acceptable by the Montgomery County Health Department for proper sewage. (c) Installation must comply with section 16-94 in order to obtain Building Official approval for occupancy. Such approval is necessary to obtain permanent electrical service. Manufactured homes will not be authorized to receive permanent electrical service until the provider of electrical service has been notified for approval for occupancy by the Building Official. (d) The above requirements do not apply to recreational vehicles. Recreational vehicles shall not be approved for permanent installation or permanent occupancy and may only be used for a maximum of an 18-month period as a temporary residence. All recreation vehicles must display a current State license and registration. Building permits will not be issued for recreational vehicles. (e) All manufactured homes entering the County must be in a condition which renders them immediately habitable upon proper installation in accordance with this article.