A design review agent will review all submissions for compliance with these residential building form standards through a design review process that coordinates land disturbance, site planning, architecture, zoning, building code compliance and landscaping. The design review agent will have the authority to make interpretations of these guidelines to provide the necessary flexibility at the implementation stage, while ensuring that the spirit of the guidelines is met. Approvals by the design review agent do not release the applicant from compliance with other approval agencies, nor from compliance with all other federal, state or local ordinances. Approval by the design review agent does not constitute approval of a building permit application. All required plans for design review must be submitted with the building permit application. A developer or property owner may schedule a meeting with the design review agent prior to submittal to confirm design review requirements. An approval will not be given prior to the submittal of a building permit application and meeting with the design review agent shall not be construed as an approval. The following documents shall be required for design review: (1) Site plan showing the location of all proposed structures, driveways, utilities, septic system (if applicable), and landscaping; (2) Building plans, including but not limited to, floorplans with dimensions and door/window sizes, full elevations of all exterior walls, architectural details, foundation plan with details, and roof plan. (3) A complete design review application. Incomplete applications will not be accepted. Denial of the design review will suspend the building permit application review until such time as the design review is approved. Building permit application review will not continue separately once a design review is denied. The building permit application will be held for only four weeks after the design review denial. The applicant is responsible for picking up the application materials if resubmittal takes longer than four weeks.